Flexural Capacity of Encased Composite Beam with Hollow Core PC Slabs (매입형 합성보의 휨 성능 평가 -속 빈 프리캐스트 콘크리트 슬래브와 비대칭 H형강 철골보-)

  • Heo, Byung Wook;Bae, Kyu Woong;Moon, Tae Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.5 s.72
    • /
    • pp.587-598
    • /
    • 2004
  • In this study, an experiment was conducted on the Slim Floor system, using a hollow core PC slab, which could reduce the over-all depth of a composite beam. The Slim Floor system is a method used in steel frame multi-story building construction, in which the structural depth of each floor is minimized after incorporating the steel floor beams within the depth of the concrete floor slab. This experimental study focused on the flexural behavior of the partially connected Slim Floor system with asymmetric steel beams encased in hollow core PC slabs. Ten full-scale specimens were constructed and tested in this study, with different steel beam heights, hollow core PC slabs, slab widths, and PC slab bearings. Observations made in line with the experiments indicated that the degree of shear connection without additional shear connection was 0.48-0.98 times more than that of the full shear connection, due to inherent mechanical and chemical bond stress.

Mechanical Properties of High Strength Shear Connector (고강도(高强度) 스터드 볼트의 역학적 특성에 관한 연구)

  • Eom, Chul Hwan
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.93-98
    • /
    • 2012
  • The headed studs those are used extensively for steel-composite construction is specified as SS400 at the current Korean Standard specification considering the welding condition. And the corresponding equation for the shear force calculation is limited for the use of compression strength of concrete below $300kg/cm^2$. However, it is expected that the high strengthening and precast of both steel and concrete due to the necessity of shear connector or other connecting material for the combination of steel and concrete. Therefore, the experimental results obtained during the development process of high strength stud for the connection of high strength concrete and the steel member are reported in this paper. Also the effectiveness of newly developed shear connector using pipe to increase the stiffness of a stud is verified by comparing both the stiffness and the strength with common stud bolt through the welding ability, mechanical characteristics and experimental investigation.

Seismic Performance of Prefabricated Piers for Urban MAGLEV (자기부상열차용 급속시공교각의 내진성능)

  • Lee, Jung-Woo;Chin, Won-Jong;Joh, Chang-Bin;Kwark, Jong-Won
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.69-70
    • /
    • 2009
  • This paper investigates the seismic behavior of prefabricated piers which are made by onsite connection of precast composite column segments to accelerate bridge construction. Quasi-static cyclic loading tests on the piers show better overall seismic capacity compared to RC piers with seismic details..

  • PDF

Inelastic Behavior of Continuous Precast Composite Slabs (연속 프리캐스트 합성바닥판의 비탄성 거동)

  • Shim Chang-Su;Chung Young Soo;Min Jin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05a
    • /
    • pp.447-450
    • /
    • 2005
  • A prefabricated composite hollow slab with perforated I-beams was suggested for the replacement of deteriorated concrete decks or the construction of new composite bridges with long-span slabs. Composite slabs with embedded I-beams have considerably higher stiffness and strength. For the application of prefabricated composite slabs to bridges, joints between slabs should satisfy the requirements of the ultimate limit state and the serviceability limit state. In this paper, three types of the detail for loop joints were selected and their structural performance in terms of strength and crack control was investigated through static tests on continuous composite slabs. A main parameter was the detail of the joint, such as an ordinary loop joint and loop joint with additional reinforcements. Even though there was no connection of the steel beams at the joints, the loop joints showed good performance in terms of strength. In terms of crack control, the loop joint with additional reinforcements showed better performance. In ultimate limit state, the continuous composite slabs showed good moment redistribution and ductility.

  • PDF

Trial Installation and Performance Evaluation of Prefabricated Concrete Slab Track on Revenue Line (프리캐스트 콘크리트 슬래브궤도의 영업선 시험시공 및 성능평가)

  • Jang, Seung-Yup;Kang, Yun-Suk;Lee, Hu-Sam;Kim, Yu-Bong;Lee, Jong-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.840-845
    • /
    • 2008
  • To develop our original technology of concrete slab track, being widely accepted for new track, prefabricated concrete slab track, or precast concrete slab track has been developed. They have two different types according to slab shape and its dimensions, connection of slabs and connecting structure onto substructure. After the system design and successful performance evaluation in the laboratory, the trial installation on revenue line has been carried out. This paper is presenting the result of the trial installation and the performance tests in field. The performance tests have been performed as visual inspection for cracks and damages, measurement of track alignment and elastic behavior of track under passing trains. The performance test results during last 2 years have shown that no remarkable damages and settlements were found, and track alignment and elastic track behavior both exhibits good status.

  • PDF

Study on seismic behavior of fabricated beam-column bolted joint

  • Zhang, Yu;Ding, Kewei
    • Structural Engineering and Mechanics
    • /
    • v.82 no.6
    • /
    • pp.801-812
    • /
    • 2022
  • To better promote the development of fabricated buildings, this paper studies the seismic behavior of precast concrete beam-column bolted joint under vertical low cyclic loading. The experimental results show that cracks appear in the beam-column joint core area. Meanwhile, the concrete and the grade 5.6 bolts are damaged and deformed, respectively. Specifically, the overall structure of the beam-column joint remains intact, and the bolts have good energy dissipation capacity. Based on the experimental study, a new method of beam-column bolted connection is proposed in simulation analysis. The simulation results show that the bolts deform in the core area of the new beam-column joint, which enhances the concrete shear capacity legitimately and protects the T-end of the beam against shear failure. To summarize, both the experimental joint and the simulated joint prolong the service life by replacing the bolts under the seismic loading. The research results provide a reference for applications of the fabricated beam-column joint.

Seismic loss-of-support conditions of frictional beam-to-column connections

  • Demartino, Cristoforo;Monti, Giorgio;Vanzi, Ivo
    • Structural Engineering and Mechanics
    • /
    • v.61 no.4
    • /
    • pp.527-538
    • /
    • 2017
  • The evaluation of the loss-of-support conditions of frictional beam-to-column connections using simplified numerical models describing the transverse response of a portal-like structure is presented in this paper considering the effects of the seismic-hazard disaggregation. Real earthquake time histories selected from European Strong-motion Database (ESD) are used to show the effects of the seismic-hazard disaggregation on the beam loss-of-support conditions. Seismic events are classified according to different values of magnitudes, epicentral distances and soil conditions (stiff or soft soil) highlighting the importance of considering the characteristics of the seismic input in the assessment of the loss-of-support conditions of frictional beam-to-column connections. A rigid and an elastic model of a frame of a precast industrial building (2-DoF portal-like model) are presented and adopted to find the minimum required friction coefficient to avoid sliding. Then, the mean value of the minimum required friction coefficient with an epicentral distance bin of 10 km is calculated and fitted with a linear function depending on the logarithm of the epicentral distance. A complete parametric analysis varying the horizontal and vertical period of vibration of the structure is performed. Results show that the loss-of-support condition is strongly influenced by magnitude, epicentral distance and soil conditions determining the frequency content of the earthquake time histories and the correlation between the maxima of the horizontal and vertical components. Moreover, as expected, dynamic characteristics of the structure have also a strong influence. Finally, the effect of the column nonlinear behavior (i.e. formation of plastic hinges at the base) is analyzed showing that the connection and the column are a series system where the maximum force is limited by the element having the minimum strength. Two different longitudinal reinforcement ratios are analyzed demonstrating that the column strength variation changes the system response.

Flexural Behavior of MRS Continuous Joints for the Prestressed Concrete One-way Joist Slab System (프리스트레스 콘크리트 일방향 장선구조로 구축한 MRS 연속단 접합부의 휨거동)

  • Oh, Young-Hun;Moon, Jeong-Ho;Im, Ju-Hyeuk;Choi, Dong-Sup;Lee, Kang-Chul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.1
    • /
    • pp.148-155
    • /
    • 2010
  • The purpose of this study is to propose and evaluate the continuous joint constructed with MRS system which is utilized for floor system in the parking structures or commercial retail buildings. Four specimens were fabricated and tested to examine the structural performance of the continuous joint with different joint detailing. Structural test for the specimens was undertaken to simulate the actual stress condition of the negative moment resisting connection in the prestressed precast concrete parking structures with 8m span. Based on the experimental results, the MRS system could be designed as the ductile continuous joint governed by flexural behavior. Therefore the MRS system developed in this study would provide a superior joint behavior to conventional double-tee system when constructing monolithic joint composed of simply supported precast members.

Structural Performance Evaluation on Ended Block of Wide Flange PSC Girder for the Semi-Integral Bridges (광폭 플랜지 PSC 거더 단부 프리캐스트 블록을 활용한 반일체식교대교량의 구조성능 평가)

  • Ka, Hoon;Choi, Jin-Woo;Kim, Young-Ho;Park, Jong-Myen
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.1
    • /
    • pp.1-9
    • /
    • 2022
  • Semi-integral abutment bridges are a type of integral abutment bridges. These bridges eliminate expansion joints on the structure and can be used in situations not suitable for full-integral abutment bridge. Moreover, Semi-integral bridges have excellent maintenance and can be economically constructed. This study is about precast wall-type blocks at each end which provide lateral support for PSC girder, as well as acting as retaining walls to resist longitudinal movement of semi-integral abutment bridge. The end-diaphragm connection between ended blocks of PSC girders can be achieved by in-suit nonshrinkage concrete. The results show that 3-point experiment of end-diaphragm beam have an acceptable performance which is so better than results of structural design. Moreover, the effects of backfill soil on semi-integral abutment bridge constructed are analyzed the behavior according to the temperature changes.

Development of Precast Concrete Method for Eco-Pillar Debris Barrier with Hollow Cross-Section (중공트랙형 단면의 프리캐스트 에코필라 사방댐 공법개발)

  • Kim, Hyun-Gi
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.542-552
    • /
    • 2018
  • In this paper, the precast method of a concrete eco-pillar debris barrier was proposed to improve the construct ability and economic efficiency. The performance was validated by experimental and structural analysis. The steel debris barrier has a high construction cost and causes environmental damage with corrosion. The construction of a concrete eco-pillar debris barrier has been increased recently. On the other hand, there are no design standards regarding debris barriers in Korea, and debris barriers are being designed by the experience and sense of engineers. Therefore, in this study, a method to determine the design external forces was proposed and the design was performed by applying a hollow cross-section to the debris barrier. In addition, three types of connection methods of a concrete cantilever column with the maximum bending moment acts were proposed, and validation of the performance of each type was performed with a real-scale experiment. The experimental results showed that the type with loop reinforcement had the highest rigidity and the type with anchorage performance exceeded the maximum bending moment according to the ultimate load. In the manufacturing procedure of mock-up debris barriers, the type with an anchorage-bar was found to have superior construct ability.