SE Application Methods of Pre-Business for Effective Operation of Driveless LRT System (무인운전경전철시스템의 효과적 운영을 위한 사업초기단계 SE적용방안)

  • Chung, Su-Young;Park, Soo-Choong;Min, Kyung-Se;Jeon, Seo-Tak
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3312-3317
    • /
    • 2011
  • Recently, the demand regarding reliability and safety of the railroad are increased as built to Driverless LRT system. Therefore, PM and SE technique is applied for efficient management of a construction business. In case of SE(System Engineering) in domestic, most foreign companies are doing to lead but we are under effort for the environment that a domestic company can lead. In this study, We emphasize to SE importance of pre-business for operation to be effective of Driveless LRT system, and propose about activities in the SE at requirements definitions and requirements analysis steps of a highest level. To achieve this, We propose SE Application Methods of Pre-Business regarding assistance process of project planning, evaluation and control, and risk management.

  • PDF

Investigation on Uncertainty in Construction Bid Documents

  • Shrestha, Rabin;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.67-73
    • /
    • 2022
  • Construction bid documents contain various errors or discrepancies giving rise to uncertainties. The errors/discrepancies/ambiguities in the bid document, if not identified and clarified before the bid, may cause dispute and conflict between the contracting parties. Given the fact that bid document is a major resource in estimating construction costs, inaccurate information in bid document can result in over/under estimating. Thus, any questions from bidders related to the errors in the bid document should be clarified by employers before bid submission. This study aims to examine the pre-bid queries, i.e., pre-bid request for information (RFI), from state DoTs of the United States to investigate error types most frequently encountered in bid documents. For the study, around 200 pre-bids RFI were collected from state DoTs and were classified into several error types (e.g., coordination error, errors in drawings). The analysis of the data showed that errors in bill of quantities is the most frequent error in the bid documents followed by errors in drawing. The study findings addressed uncertainty types in construction bid documents that should be checked during a bid process, and, in a broader sense, it will contribute to advancing the construction management body of knowledge by clarifying and classifying bid risk factors at an early stage of construction projects.

  • PDF

The Effect of Health Promotion Programs on Health Promoting Behavior and Cardiovascular Risk Factors of Middle-aged Women (건강증진프로그램이 중년기 여성의 건강증진행위와 심혈관계 위험요인에 미치는 영향)

  • Park, Jeong-Sook
    • Korean Journal of Adult Nursing
    • /
    • v.14 no.2
    • /
    • pp.233-243
    • /
    • 2002
  • Purpose: This study is aimed at testing the effect of health promotion program on health promoting behavior and cardiovascular risk factors of middle-aged women. Method: The research design was the nonequivalent control group pre-post test. Twelve middle-aged women were the experimental group and ten were the control group. The 8-week health promotion program was given to the experimental group. There were health promotion theories, flexibility and muscle strength exercise, cardiopulmonary endurance exercise, nutrition, stress management, cancer prevention and early detection, management of menopause and wrap-up in health promotion program for middle-aged women. The measurement tool was Health Promoting Behavior developed by researcher using serum cholesterol, obesity rate, systolic blood pressure, and diastolic blood pressure as cardiovascular risk factors. Result: The experimental group showed a higher score of health promoting behavior than the control group. There were no differences on cardiovascular risk factors(cholesterol, obesity rate, diastolic blood pressure) between the experimental and control groups except systolic blood pressure. Conclusion: Conclusively, this health promotion program for middle-aged women was effective in increasing health promotion behaviors, but wasn't effective in decreasing cardiovascular risk factors except the systolic blood pressure. It seems it's necessary to re-study this using more samples and a longer duration of the program, and smaller mortality rate.

  • PDF

TREE FORM CLASSIFICATION OF OWNER PAYMENT BEHAVIOUR

  • Hanh Tran;David G. Carmichael;Maria C. A. Balatbat
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.526-533
    • /
    • 2011
  • Contracting is said to be a high-risk business, and a common cause of business failure is related to cash management. A contractor's financial viability depends heavily on how actual payments from an owner deviate from those defined in the contract. The paper presents a method for contractors to evaluate the punctuality and fullness of owner payments based on historical behaviour. It does this by classifying owners according to their late and incomplete payment practices. A payment profile of an owner, in the form of aging claims submitted by the contractor, is used as a basis for the method's development. Regression trees are constructed based on three predictor variables, namely, the average time to payment following a claim, the total amount ending up being paid within a certain period and the level of variability in claim response times. The Tree package in the publicly available R program is used for building the trees. The analysis is particularly useful for contractors at the pre-tendering stage, when contractors predict the likely payment scenario in an upcoming project. Based on the method, the contractor can decide whether to tender or not tender, or adjust its financial preparations accordingly. The paper is a contribution in risk management applied to claim and dispute resolution practice. It is argued that by contractors having a better understanding of owner payment behaviour, fewer disputes and contractor business failures will occur.

  • PDF

Risk Factor Analysis of Penetrating Fragile States' Construction Market : Focusing on the North Korean Case (취약국가(Fragile State) 건설시장 진입 시 리스크 대응을 위한 요인분석 : 북한 사례를 중심으로)

  • Hong, Eunbin;Yi, June-Seong;Son, JeongWook;Jang, YeEun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.17-28
    • /
    • 2021
  • The construction industry has challenges and opportunities for Sustainable Development Goals (SDGs). The task of the construction industry is to improve the quality of construction, which is particularly necessary for the Fragile State. The construction industry's primary role is to provide jobs and maintain and improve the construction environment that affects the quality of life. Using the Delphi method and EFA in this study, [Pre-Execution] and [Execution] were derived as risk areas that require intensive hedge when penetrating the construction market in fragile states. It was concluded that the risk hedge to the master plan for the business conditions and infrastructure is the most important.

Monitoring and Risk Assessment of Pesticide Residues in Pre-harvest Fresh Ginseng (Panax ginseng C. A. Meyer) in Chungbuk Province in 2019 (충북지역 생산단계 수삼 중 잔류농약 모니터링 및 위해성 평가(2019))

  • Song, Tae Hwa;Lee, Young Wook;Youn, Taek Han;Park, Eun A;Shim, Eun Sun;Lee, Ju Hee;Kyung, Kee Sung
    • Korean Journal of Environmental Agriculture
    • /
    • v.40 no.2
    • /
    • pp.118-126
    • /
    • 2021
  • BACKGROUND: It is very important to monitor the residual characteristics of pesticides in pre-harvest fresh ginseng to ensure consumer safety. METHODS AND RESULTS: Forty-eight fresh ginseng samples were collected from 8 ginseng-growing fields 10 days before harvest and pesticide residues in fresh ginseng with and without rhizome (head of ginseng) and rhizome were analyzed for 320 pesticides by using GC-MS/MS and LC-MS/MS. As a result of the pesticide residue analysis, the number of pesticides detected from the fresh ginseng with rhizome, that without rhizome and rhizome were 26, 25, and 40, respectively, indicating that high number of pesticides found in rhizome, compared with the other parts. Pyraclostrobin was detected with the highest frequency in all samples, reaching to 21.2% in fresh ginseng with rhizome, 16.8% in that without rhizome, and 14.8% in rhizome. CONCLUSION: The residue levels of pesticides detected did not exceed their maximum residue limits, in spite of residual data in fresh ginseng before harvest. The amounts of the estimated daily intakes of all the detected pesticides were found to be from 0.018 to 1.818% of their acceptable daily intakes, indicating that concentrations of pesticides detected from fresh ginseng with and without rhizome collected before harvest do not pose the immediate health risks.

A Collaborative Channel Strategy of Physical and Virtual Stores for Look-and-feel Products (물리적 상점과 가상 상점의 협업적 경로전략: 감각상품을 중심으로)

  • Kim, Jin-Baek;Oh, Chang-Gyu
    • Asia pacific journal of information systems
    • /
    • v.16 no.3
    • /
    • pp.67-93
    • /
    • 2006
  • Some consumers prefer online and others prefer offline. What makes them prefer online or offline? There has been a lack of theoretical development to adequately explain consumers' channel switching behavior between traditional physical stores and new virtual stores. Through consumers' purchase decision processes, this study examined the reasons why consumers changed channels depending on purchase process stages. Consumer's purchase decision process could be divided into three stages: pre-purchase stage, purchase stage, and post-purchase stage. We used the intention of channel selection as a surrogate dependent variable of channel selection. And some constructs, that is, channel function, channel benefits, customer relationship benefits, and perceived behavioral control, were selected as independent variables. In buying look-and-feel products, it was identified that consumers preferred virtual stores to physical stores at pre-purchase stage. To put it concretely, all constructs except channel benefits were more influenced to consumers at virtual stores. This result implied that information searching function, which is a main function at pre-purchase stage, was better supported by virtual stores than physical stores. In purchase stage, consumers preferred physical stores to virtual stores. Specially, all constructs influenced much more to consumers at physical stores. This result implied that although escrow service and trusted third parties were introduced, consumers felt that financial risk, performance risk, social risk, etc. still remained highly online. Finally, consumers did not prefer any channel at post-purchase stage. But three independent variables, i.e. channel function, channel benefits, and customer relationship benefits, were significantly preferred at physical stores rather than virtual stores at post-purchase stage. So we concluded that physical stores were a little more preferred to virtual stores at post-purchase stage. Through this study, it was identified that most consumers might switch channels according to purchase process stages. So, first of all, sales representatives should decide that what benefits should be given them through virtual stores at the pre-purchase stage and through physical stores at the purchase and post-purchase stages, and then devise collaborative channel strategies.

Relationship of Blood Metabolites with Reproductive Parameters during Various Seasons in Murrah Buffaloes

  • Khan, H.M.;Mohanty, T.K.;Bhakat, M.;Raina, V.S.;Gupta, A.K.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.24 no.9
    • /
    • pp.1192-1198
    • /
    • 2011
  • Peri-partum metabolic profile was evaluated in winter and summer calving, with 15 Murrah buffaloes in each seasonal group. In summer calvers, significantly lower values were observed for blood plasma urea nitrogen (BUN) at day 30 pre-partum (p<0.05), on calving day (p<0.05) and at all other stages (p<0.01); plasma non-esterified fatty acids (NEFA) values were significantly lower on day 30 pre-partum (p<0.01) and on day 60 post-partum (p<0.05). This was associated with significant reduction in days to first service (DFS) and service per conception (SPC) and an overall better reproductive performance in terms of service period, risk to first service on days 60, 90 and >90, and pregnancy risk to first service up to days 60 and 90. This may be attributed to better pre-partum nutritional status. Cervical and uterine involution were completed in fewer days, involutional changes took place at a faster pace and there were a lower number of abnormal involutional changes in winter compared to summer season. This may be attributed to better post-partum nutrition and less environmental stress. However, validation requires further targeted cohort investigation with a large sample size.

Causal Relationship of Infra, Process and Firm Performance on Supply Chain Quality Management (모기업과 협력기업의 공급망 품질경영 인프라(Infra), 프로세스(Process), 성과(Performance)간 인과관계 연구)

  • Park, Ji-Young;Oh, Soo-Jung;Kim, Soo-Wook
    • Journal of Korean Society for Quality Management
    • /
    • v.39 no.4
    • /
    • pp.464-479
    • /
    • 2011
  • The purpose of this study is that analyzing the causal relationship between Infra, Process and Performance of companies which are executing the Supply Chain Quality Management(SCQM) with their subcontractors and partners. Korean Standards Association(KSA) provides the Supply Chain Quality Management Model and Quality Collaboration Index for 4 years, but a few study has investigated the critical variables and their causal relationship to organizational performance. Therefore we examine the SCQM model and related index and choose the quality, human resource and risk management processes for identifying the path to organizational performance. In addition, exploratory factor analysis is conducted for figuring out the major factors among the 3 processes. Structural Equation Model are successively used for determining which characteristics of the infra and processes are the most critical variables to performance. The data was collected from KSA and composed of 52 companies and 346 their partners. The result shows that risk management process has no significant effect on the organizational performance and pre-production process collaboration.

Stability of Construction Cost-variability Factor Rankings from Professionals' Perspective: Evidence from Dar es Salaam -Tanzania

  • Shabani, Neema;Mselle, Justine;Sanga, Samwel Alananga;Kanuti, Arbogasti Isidori
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.2
    • /
    • pp.17-33
    • /
    • 2018
  • This study investigates the stability of professionals' cost variability factor-rankings across different levels of cost-variability and response scenarios. Descriptive statistics are used to examine the stability of factor-ranking for 20 cost variability factors and a Multinomial Logistic (MNL) regression model was implemented to examine the stability of cost variability factors across three cost variability levels. The finding on the descriptive statistics indicated that professionals' factors-rankings are stable only for external factors. The MNL regression results on factor-stability suggested that 8 out of the 20 evaluated factors were unstable determinant of lower cost variability levels. These factors are "risk associated with the project", "personal bias and poor professionalism of the estimators", "limited time available to complete the project", "lack of skills and experience by estimator" "geographical location of projects", "incomplete & rush designs for estimate", "unforeseen or unexpected site constraints", "high class bidders for the contractors". Similarly lack of experience and large size projects were observed to be unstable as well. These observations suggest that professionals' view on pre-tender cost variability factor-ranking yields unstable factor rankings hence should not be relied upon as the only mechanisms to mitigate cost related risks in construction projects.