• Title/Summary/Keyword: power plant

Search Result 7,082, Processing Time 0.033 seconds

An analysis about failures of the power converter in power plant (발전플랜트의 전력변환기 고장사례 분석)

  • Han, Seok-Woo
    • Proceedings of the KIPE Conference
    • /
    • 2012.07a
    • /
    • pp.554-555
    • /
    • 2012
  • The failures in the power plant can lead to a dangerous situation according to the demand and supply of the electric power. The failure times of the domestic plant happens very often, and it has been reported as a significant loss by the power sales. Therefore, the power plant is demanded to maintain very well in order to produce a high quality of power. The rate of failures by the electricity facility is filled with 40[%] among the trouble in the failures of the power plant. The failures of power plant can cause serious accidents, magnificent losses, and chaos in our society. So, we require a significant plan to reduce such a serious problem. In this paper, I analysis the failure case of power converter in power plant, and I offer the better solution to be able to prevent the failures from power plant.

  • PDF

A Study on Environmental and Economic Cost Analysis of Coal Thermal Power Plant Comparing to LNG Combined Power Plant (석탄화력발전대비 LNG복합화력발전 환경성 및 경제성 비용분석에 관한 연구)

  • Kim, Jong-Won
    • Asia-Pacific Journal of Business
    • /
    • v.9 no.4
    • /
    • pp.67-84
    • /
    • 2018
  • This study is about comparing coal thermal plant to LNG combined power plant in respect of environmental and economic cost analysis. In addition sensitive analysis of power cost and discount rate is conducted to compare the result of change in endogenous and exogenous variable. For environmental assessment, when they generate 10,669GWh yearly, coal thermal power plant emits sulfur oxides 959ton, nitrogen oxide 690ton, particulate matter 168ton and LNG combined power plant emits only nitrogen oxide 886ton respectively every year. Regarding economic cost analysis on both power plants during persisting period 30 years, coal thermal power plant is more cost effective 4,751 billion won than LNG combined taking in account the initial, operational, energy and environmental cost at 10,669GWh yearly in spite of only LNG combined power plant's energy cost higher than coal thermal. In case of sensitive analysis of power cost and discount rate, as 1% rise or drop in power cost, the total cost of coal thermal power plant increases or decreases 81 billion won and LNG combined 157 billion won up or down respectively. When discount rate 1% higher, the cost of coal thermal and LNG combined power plant decrease 498 billion won and 539 billion won for each. When discount rate 1% lower, the cost of both power plant increase 539 billion won and 837 billion won. With comparing each result of change in power cost and discount rate, as discount rate is weigher than power cost, which means most influential variable of power plan is discount rate one of exogenous variables not endogenous.

The Development of Boiler Fuel Control Algorithm and Distributed Control System for Coal-Fired Power Plant (석탄화력발전소 보일러 연료제어 알고리즘과 분산제어시스템의 개발)

  • Lim, Gun-Pyo;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.1
    • /
    • pp.36-44
    • /
    • 2013
  • This paper is written for the development and application of boiler fuel control algorithm and distributed control system of coal-fired power plant by the steps of design, coding, simulation test, site installation and site commissioning test. Fuel control algorithm has the upper algorithm and it is boiler master control algorithm that controls the fuel, feed water, air by generation output demand. Generation output demand by power load influences fuel control. Because fuel can not be supplied fast to the furnace of boiler, fuel control algorithm was designed adequately to control the steam temperature and to prevent the explosion of boiler. This control algorithms were coded to the control programs of distributed control systems which were developed domestically for the first time. Simulator for coal-fired power plant was used in the test step. After all of distributed control systems were connected to the simulator, the tests of the actual power plant were performed successfully. The reliability was obtained enough to be installed at the actual power plant and all of distributed control systems had been installed at power plant and all signals were connected mutually. Tests for reliability and safety of plant operation were completed successfully and power plant is being operated commercially. It is expected that the project result will contribute to the safe operation of domestic new and retrofit power plants, the self-reliance of coal-fired power plant control technique and overseas business for power plant.

Heat-Electric Power Ratio Optimization To Maximize Profit of a Cogeneration Power Plant (열병합 발전기 수익 극대화를 위한 열전비 최적화)

  • Kim, Gun-Hoe;Lee, Jae-Heon;Moon, Seung-Jae;Chang, Taek-Soon
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.381-384
    • /
    • 2008
  • This paper presents an operational technique to maximize profit of a cogeneration power plant. To minimize errors in a loss and gain analysis of a cogeneration power plant, the energy sale profit in the cost-based-pool electric power trade market, the heat sale profit, and the supplementary fund profit for electric power industry are taken into consideration. The objective is to optimize the heat-electric power ratio to maximize profit of a cogeneration power plant. Furthermore, the constrained bidding technique to optimize heat-electric power ratiocan be obtained. Profits from of a cogeneration power plant are composed of three categories, such as the energy sale profit in the cost-based-pool electric power trade market, the heat sale profit, and the supplementary fund profit for electric power industry. Profits of a cogeneration power plant are varied enormously by the operation modes. The profits are mainly determined by the amount of constrained heat generation in each trading time. And the three profit categories arecoupled tightly via the heat-electric power ratio. The result of this case study can be used as a reference to a cogeneration power plant under the power trading system considered in this case.

  • PDF

The Development of Boiler Furnace Pressure Control Algorithm and Distributed Control System for Coal-Fired Power Plant (석탄화력발전소 보일러 노내압력 제어알고리즘과 분산제어시스템의 개발)

  • Lim, Gun-Pyo;Hur, Kwang-Bum;Park, Doo-Yong;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.3
    • /
    • pp.117-126
    • /
    • 2013
  • This paper is written for the development and application of boiler furnace pressure control algorithm and distributed control system of coal-fired power plant by the steps of design, coding, simulation test, site installation and site commissioning test. The control algorithms were designed in the shape of cascade control for two parts of furnace pressure control and induced draft fan pitch blade by standard function blocks. This control algorithms were coded to the control programs of distributed control systems. The simulator for coal-fired power plant was used in the test step and automatic control, sequence control and emergency stop tests were performed successfully like the tests of the actual power plant. The reliability was obtained enough to be installed at the actual power plant and all of distributed control systems had been installed at power plant and all signals were connected mutually. Tests for reliability and safety of plant operation were completed successfully and power plant is being operated commercially. It is expected that the project result will contribute to the safe operation of domestic new and retrofit power plants, the self-reliance of coal-fired power plant control technique and overseas business for power plant.

Development of an Intelligent Power Plant Operating State Monitoring System (발전소 설비 운영상태 지능감시 시스템 개발)

  • Hong, Chang-Ho;Kim, Seok-Hyun;Lee, Seung-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.1
    • /
    • pp.38-43
    • /
    • 2012
  • For safe and stable operations of power plants, it is essential to monitor closely crucial measurement values related to power plant trips. In this paper, an intelligent power plant operating state monitoring technique enabling the operating crew member to monitor conveniently the status of the important measurement values and to perceive almost instantly the significance of the implications of those measurement values is developed. The proposed technique is called a "POST(Plant Operating State Tracking) Chart" technique and provides the foundations in developing an intelligent and integrated power plant operating state monitoring support system called the "P-OASIS"(Plant Operation Assessment and Support Intelligent System). The P-OASIS is applied to a thermal power plant of 500[MW] capacity and exhibited impressive performances.

Introduction of Off-Gas Power Plant and Localization Development of Auxiliary Equipment (부생복합발전 소개와 주요설비 국산화를 위한 연구)

  • Ko, Minseok;Kim, Dohyung;Lee, Dongsu;Lee, Seong-geun
    • 한국연소학회:학술대회논문집
    • /
    • 2013.06a
    • /
    • pp.127-128
    • /
    • 2013
  • Off-gas power plant is a renewable energy power plant which generate electrical energy using the low calorie FOG and BFG as main fuel. This combined cycle power plant is comprised of gas turbines, gas compressors, steam turbines, generators, and auxiliary equipment such as gas mixer, mixing tank, and gas cooler. In this paper, a off-gas power plant and development of its several equipment using CFD are introduced.

  • PDF

Power Network's Operation Influence Analysis of Wind Power Plant in Jeju island (제주지역 풍력발전기에 의한 전력계통운영 영향분석)

  • Kim, Young-Hwan;Choi, Byung-Chun;Jang, Si-Ho;Kim, Se-Ho;Jwa, Jong-Geun
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.127-129
    • /
    • 2005
  • Construction of wind power plant is increasing rapidly because Jeju island is known as the most suitable place for wind power plant. Rut wind power plant is difficult electric power control and it has a rapid electric power fluctuation. Such a problem has a bad influence on electric power network in small electric network like Jeju. Therefore, we forecast the amount of wind power plant construction by weather information and the rate of utilization for existing facility. We investigate the contribution degree for electric Power demand, economic effect, the case of power network influence. So we forecast influence of wind power plant for Jeju power network's operation in the near future.

  • PDF

Innovative Nuclear Power Plant Building Arrangement in Consideration of Decommissioning

  • Choi, Won-Jun;Roh, Myung-Sub;Kim, Chang-Lak
    • Nuclear Engineering and Technology
    • /
    • v.49 no.3
    • /
    • pp.525-533
    • /
    • 2017
  • A new concept termed the Innovative Nuclear Power Plant Building Arrangement (INBA) strategy is a new nuclear power plant building arrangement method which encompasses upfront consideration of more efficient decommissioning. Although existing decommissioning strategies such as immediate dismantling and differed dismantling has the advantage of either early site restoration or radioactive decommissioning waste reduction, the INBA strategy has the advantages of both strategies. In this research paper, the concept and the implementation method of the INBA strategy will be described. Two primary benefits will be further described: (1) early site restoration; and (2) radioactive waste reduction. Several other potential benefits will also be identified. For the estimation of economic benefit, the INBA strategy, with two primary benefits, will be compared with the immediate dismantling strategy. The effect of a short life cycle nuclear power plant in combination with the INBA strategy will be reviewed. Finally, some of the major impediments to the realization of this strategy will be discussed.