This paper describes the optimal reconfiguration of distribution network. The optimal routing of distribution network should provide electricity to customers with quality, and this paper shows that optimal routing of distribution network can be obtained by Neural-Tabu algorithm while keeping constraints such as line power capacity, voltage drop and reliability indices. The Neural-Tabu algorithm is a Tabu algorithm combined with Neural network to find neighborhood solutions. This paper shows that not only the loss cost but also the reliability cost should be considered in distribution network reconfiguration to achieve the optimal routing.
For stable and sustainable energy supply, distributed generator (DG) has become an essential and indispensable element from environmental and energy security perspectives. However, installation of DG in distribution systems may cause negative affects on feeders because power outputs of DG could be changed irregularly. One of major negative affects is variation in voltage profile. In general, voltage regulation devices such as under load tap changer (ULTC) at distribution substation and step voltage regulator (SVR) along feeder in distribution system are used to maintain customers' receiving voltage within a predetermined range. These regulators are controlled by line drop compensation (LDC) method which calls for two parameters; the equivalent impedance and the load center voltage. Therefore, consideration of DG outputs in the LDC parameter design procedure may give large impact on the installable DG capacity. This paper proposes a method that estimates maximum Installable DG capacity considering LDC parameters of ULTC and SVR. The proposed algorithm is tested with model network.
This paper proposes the adaptive relaying algorithm of protective devices applied in the neighboring distribution feeders for reliable and efficient operations of a wind farm interconnected with distribution networks by dedicated lines. Generally, it would be highly possible that the wind turbine generators are influenced by abnormal grid conditions such as disturbances occurring in the neighboring distribution feeders as well as the dedicated power line. The delayed operation time of protective devices for satisfying the coordination might overly expose the interconnected wind turbine generators to the fault and cause damage to them. In order to reduce the damages on the interconnected wind farm about the faults happening in distribution networks, this paper describes the proper delayed operation time of protective relay.
This paper describes the operational characteristics of protection algorithm applied in distributed generations(DG) for faults occurred in the interconnected distribution networks. The DG can be Influenced by abnormal grid conditions such as disturbances occurring in the neighboring distribution feeders as well as the interconnected power line. Particularly, in case of the fault happening in the neighboring distribution feeders emanated from the substation to which DG is connected, the protective devices in the DG might mis-operate. The mis-operation of protective devices can be varied by the fault conditions. The simulation results for Hoenggye substation model composed of five feeders using PSCAD/EMTDC showed that the number of mis-operation of protective devices applied in DG is about 0.66 times per one year.
This paper deals with optimal voltage regulation methods of line voltage regulator(SVR : Step Voltage Regulator) in power distribution systems. In order to deliver suitable voltages to as many customers as possible, the optimal sending voltage of SVR should be decided by the effective operation of voltage regulators at the distribution feeders and substations. In this paper, a new voltage regulation method based on the existing method is presented and an optimal coordination method of multiple voltage regulators is extended. The results from a case study show that the proposed methods can be a practical tool for the voltage regulation in distribution systems.
The Journal of the Korea institute of electronic communication sciences
/
v.16
no.5
/
pp.835-844
/
2021
In this paper, a power facility communication control device was designed to autonomously determine and separate the fault section through communication between power facilities in the smart grid distribution system. In the power facility communication control device, the control module was designed as a DSP to measure three-phase voltage and current, and the communication module was designed as an embedded-based Raspberry Pi to determine the fault section and realize the fault section separation through communication between power facilities. Communication between DSP and Raspberry Pi was designed by SPI communication, and communication between Raspberry Pi was designed based on Wi-Fi. Finally, a performance evaluation system based on three power facility communication control devices was built, and simulation verification was conducted for various fault events that may occur on the distribution line. As a result of the test evaluation, it was possible to confirm the effectiveness of the design methodology of the communication control device by showing the required response of the communication control device to all test cases.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.8
/
pp.40-46
/
2014
The development of the superconducting fault current limiter (SFCL) to apply into a power transmission system where makes larger fault current compared to the power distribution system has been performed. Among various SFCLs, the trigger-type SFCL is suitable for application into the power transmission system due to the effective reduction on power burden of the high temperature superconducting element (HTSC) for the larger fault current. To protect the power transmission line in the power grid, the distance relay, which decides to interrupt fault section where can be calculated by the measured voltage and current from sound grid, is one of important protective devices in the power transmission system. However, the operation of the distance relay from the impedance of the fault point on the transmission line is affected by the impedance of the trigger-type SFCL. Therefore, the analysis on the operational characteristics of distance relay considering the application of the SFCL is required. In this paper, the effect on the operation zones of the distance relay by the impedance of the SFCL in a power transmission system was analyzed through the PSCAD/EMTDC simulation.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.29
no.5
/
pp.65-70
/
2015
Lightning is one of hazards affecting the rapid-transit railway system. There are two effects, which are direct lightning surge to electric car line and induced lightning surge. Protection methods for the direct lightning surge are studied with various occasions, however, study of induced lightning surge is insufficient in spite of a large or small effects. In this paper, it is analysed the way that serge voltage is induced to electric car line by lightning strikes. By modeling the propagation process and the coupling phenomenon of electromagnetic wave produced by lightning strikes, it is achieved to make integrative circuit model combined with existing electric car model. The study is conducted into three different waveform of electromagnetic wave produced by lightning; rectangular wave, double exponential distribution wave, triangle wave. It is also simulated that the inducing serge is coupled to electric car line in an arbitrary location. The simulation results in that, when rapidly changing rectangular wave is supplied, maximum power is induced to electric car line.
Analysis methods in the power system are static analysis, dynamic analysis and online analysis, offline analysis. The static analysis is used for the existing power system analysis method and the static analysis is mainly used for PSS / E. However, in the real system where the value changes in real time which we are using, dynamic analysis is required which can be analyzed in real time for accurate analysis. Therefore, attention is focused on EMS (Energy Management System) and importance is increasing. Among the various EMS systems, we will cover state estimation, which is a static on-line analysis that can receive and interpret data from the acquisition point in real time. DC systems are spreading in various fields such as DC load, DC distribution, renewable energy. As such, much attention and attention are focused on the DC system. In this paper, we have studied the feasibility through the case study and the interpretation of the state estimation that can be applied to the DC system.
The rapid increase of electric power demand and the strong requirements for interuptiom-free made most distribution works being done by interruptiom-free work techniques. These trends lead to increase of accident by electric shock. It goes to prove that more than 80% of electric accident is due to the hot line works. Therefore, the countermeasures are very urgent. This paper suggests the improvement to prevent the work accident by interruption-free work through the examination of the present situation of interruption-free work techniques as well as analysing the problems in terms of live-line works and working procedures. These improvement will contribute to reduce the work accident in live-line work and enhance the construction quality by training and managing workers effectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.