The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.6
/
pp.738-745
/
2014
Recently, various measures have been discussed for overcoming depletion of fossil fuels and environmental pollution. One of the measures is electric vehicles. But electric vehicles has some limitations from high cost of battery and low efficiency, so operation distance of electric cars is limited. Also there are difficulties that charging lines should be connected by an electric car whenever it charges. Thus, many studies have been conducted to overcome the limitation using conventional batteries of electric vehicles. As a result, the OLEV(On-Line Electric Vehicle) was developed. But the OLEV system is some limitations. The OLEV system causes power quality problems when it charges. Power quality problem cannot be ignored because OLEV systems are closely connected by distribution grids. In this paper, the OLEV system is designed by using PSCAD/EMTDC, and the power quality is measured and evaluated. Power quality is divided by two cases; harmonics and high-frequency. Harmonics were evaluated according to IEEE Std. 519-1992. But the evaluation of High-frequency could not take it because there was no standard. For this reason, the data measured by OLEV system was compared with the EN50065 regulation.
Electric power has traditionally been supplied to the demander through power generation, its transmission, and final distribution system. It is, however, expected that the various dispersed power system will be located near demanders and act as a power source based on the efficient management of electric power demanders and the optimal utilization of substitute energy. More stable electric power and efficient utilization of various power sources can be guranteed through the connection of the dispersed power system into the existing power system. It is the purpose of this study that, in the case of the connection of dispersed power system into the existing distribution line, effects of the connection on the power quality and plans for protection of power equipments are discussed and solutions of them are proposed.
The DSTATCOM(Distribution Static Synchronous Compensator) is one of the Custom Power Devices that can regulate voltage. The DSTATCOM operates as a shunt connected static var compensator whose capacitive or inductive output current can be controlled independent of the system voltage. The magnitude of the compensated voltage is limited by characteristics of the system and the load. Compensation capability of the DSTATCOM which can inject 1 MVAR reactive power was simulated by EMTDC under several conditions. This paper analyzes the effect of the DSTATCOM's compensation considering the length and kind of distribution line, the power factor and magnitude of the load, and the duration and magnitude of the voltage variation.
The Transactions of The Korean Institute of Electrical Engineers
/
v.57
no.8
/
pp.1377-1382
/
2008
DSTATCOM(distribution static compensator) is one of the custom power devices, and protects a distribution line from unbalanced and harmonic current caused by non-linear and unbalanced loads. Researches about DSTATCOM are mainly divided two parts, one is the calculation of compensation current and the other part is the current control. Conventional researches use a LPF(low pass filter) to eliminate ripple component at the calculation of compensation current. But this method has a problem that LPF's characteristics restrict the compensation performance of instantaneous active and reactive power. This paper proposes a calculation of compensation current using state observer that can be a counterproposal of conventional methods using LPF. Improved performance of instantaneous active and reactive power compensation was shown by experiments.
The purpose of this study is to develop a SOP (Standard Operating Procedure) for a distribution board that can monitor the leakage current of a load distribution line in real time. The developed distribution board was fabricated by applying IEC 61439-1. It consists of the distribution board and an alarm device. The work process for making the distribution board was compliant with the KEMC (Korea Electrical Manufacturers Cooperative) regulations. And the AC distribution board range is 1,000 V. In addition, the voltage in DC is less than 1500 V. The distribution board receives a 3-phases and 4-wires power supply system and can supply power to the load of a maximum of 32 single or three phase distribution circuits. Also, leakage current measured on the power distribution board was used by sensors installed. The SOP of the developed distribution board consists of the installation standards for the short circuit alarm device and sensor, the surge protection device, switches and indication lamps, and other devices. The operation procedure was prepared so that each manufacturing step of the distribution board must be confirmed by the persons in charge of preparation, production, quality control and approval before moving forward to the next step.
Journal of the Korean Society for Precision Engineering
/
v.20
no.1
/
pp.99-106
/
2003
Uninterrupted power supply has become indispensable during the maintenance task of active electric power lines as a result of today's highly information-oriented society and increasing demand of electric utilities. The maintenance task has the risk of electric shock and the danger of falling from high place. Therefore it is necessary to realize an autonomous robot system. In order to realize these tasks autonomously, the there dimensional position of target object such as electric line and the stand of insulator must be recognized accurately and rapidly. The insertion task of an electric line into a sleeve is selected as the typical task of the maintenance of active electric power distribution lines in this paper. A modified hough transform is applied to the recognition of the center of electric line and optimal target position calculation method is newly derived in order to recognize the center 3 dimensional position of the electric line. By the proposed method, it is proved that the center position of the electric line can be recognized without respect to the noise of image and the shape of electric lines and the insertion task of an electric tine is realized.
Kim, Jae-Hoon;Kim, Seung-Ho;Kim, Dae-Sik;Park, Kang-Sik;Lee, Heung-Ho;Han, Sang-Ok
Proceedings of the KIEE Conference
/
2005.07e
/
pp.118-120
/
2005
Nowadays, economical and social environments are changing to the type of an advanced country for development of techniques in power industry. So most of workers are recently avoiding the 3D works and asking for safety of working environment, etc. in highly dangerous parts such as hot line working on distribution lines, especially. Therefore, most advanced countries are using the support-arm or robotic systems on distribution line works for securing the construction reliability, economical feasibility and protection of linemen from the electric shock and so forth. In special Japanese electric power companies are using the robotic system named manipulator. In Korea, a support-arm has been developed for safety and facility in live working on distribution lines but not widely supplied. In this paper we will introduce development cases of support arm and manipulator robot for live working on distribution lines.
Unbundled power quality service is paid much attention under the circumstances of deregulation and diversification of needs of customers for quality and price of electric power. Moreover, distributed generators (DGs) such as photovoltaic generations and wind turbines will be introduced to distribution system more and more, and reverse flow of active power has possibility to cause new problems in the distribution system such as voltage rise of distribution line and protection problem. Flexible, Reliable and Intelligent Electrical eNergy Delivery System, which is called FRIENDS, has been proposed as one of promising distribution system for such requirements, and intensive studies are under way. One of features of the system is introducing Quality Control Center (QCC) into the system for unbundled power quality service and easy installation of DGs. Two types of QCCs for such purposes are proposed, and simulation results are shown in this paper.
Kim, Ju-Chan;Sin, Su-Han;Lee, Chung-Sik;Koh, Hee-Seog
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2004.05a
/
pp.353-357
/
2004
This paper presents the result of survey of case study for harmonics in electrical installations of buildings. Recently, many power electronic equipments(power converter, computers, air conditioners electronic ballasts for fluorescent lamps and so on) are used in office buildings, and harmonic current from them influence the other equipments in a distribution line. Notably, voltage distortion or voltage harmonics may approach or exceed is allowable level in power distribution system. Individual electric power consumers and end-users and responsible for reducing current harmonics while companies or utilities are responsible for reducing voltage harmonics at the point of common coupling in distribution system. As for harmonics, which one of the electric power qualities, it becomes important to obtain harmonic voltage/current distribution of the power system precisely because the use of power electronic apparatus in increasing. To suppress harmonics in electrical ins tallations of buildings, one of many methods suggest that resonance frequencies are controlled by modulating the capacities of high-voltage customer's capacitors.
Seo, In-Yong;Ha, Bok-Nam;Lee, Sung-Woo;Shin, Chang-Hoon;Kim, Seong-Jun
Nuclear Engineering and Technology
/
v.42
no.2
/
pp.219-230
/
2010
In nuclear power plants (NPPs), periodic sensor calibrations are required to assure that sensors are operating correctly. By checking the sensor's operating status at every fuel outage, faulty sensors may remain undetected for periods of up to 24 months. Moreover, typically, only a few faulty sensors are found to be calibrated. For the safe operation of NPP and the reduction of unnecessary calibration, on-line instrument calibration monitoring is needed. In this study, principal component-based auto-associative support vector regression (PCSVR) using response surface methodology (RSM) is proposed for the sensor signal validation of NPPs. This paper describes the design of a PCSVR-based sensor validation system for a power generation system. RSM is employed to determine the optimal values of SVR hyperparameters and is compared to the genetic algorithm (GA). The proposed PCSVR model is confirmed with the actual plant data of Kori Nuclear Power Plant Unit 3 and is compared with the Auto-Associative support vector regression (AASVR) and the auto-associative neural network (AANN) model. The auto-sensitivity of AASVR is improved by around six times by using a PCA, resulting in good detection of sensor drift. Compared to AANN, accuracy and cross-sensitivity are better while the auto-sensitivity is almost the same. Meanwhile, the proposed RSM for the optimization of the PCSVR algorithm performs even better in terms of accuracy, auto-sensitivity, and averaged maximum error, except in averaged RMS error, and this method is much more time efficient compared to the conventional GA method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.