The Transactions of the Korean Institute of Electrical Engineers A
/
v.52
no.1
/
pp.17-28
/
2003
Digital technology has advanced very significantly over the years both in terms of software tools and hardware available. It is now applied extensively in many area of electrical engineering including protective relaying in power systems. Digital relays based on digital technology have many advantages over the traditional analog relays. The digital relay is able to do what is difficult or impossible in the analog relays. However, the complex algorithms associated with the digital relays are difficult to test and verify in real time on real power systems. Although non real-time simulators like PSCAD/EMTDC are employed to test the algorithms, such simulations have the disadvantage that they cannot test the relay dynamically. Hence, real-time simulators like RTDS are used, but the latter needs large space and it is very expensive. This paper uses EMTP MODELS to simulate the power system and the distance relay. The distance relay algorithm is constructed and the distance relay is interfaced with a test power system. The distance relays performance is then assessed interactively under various fault types, fault distances and fault inception angles. The test results show that we can simulate the distance relay effectively and we can examine the operation of the distance relay very closely including debugging by using EMTP MODELS.
In this paper, the safety distances and maximum permissible power (MPP) of resonant wireless power transfer systems are defined and derived with regard to human exposure to electromagnetic field (EMF). The definition is based on the calculated induced current density and electric field in the standard human model located between the transmitting and receiving coil. In order to avoid the adverse health effects such as stimulation of nerve tissues, the induced current and electric field must not exceed the basic restriction values specified in EMF safety guidelines. The different combinations of diameters of the coils and the distance between the two coils are investigated and their effects are analyzed. Two versions of EMF safety guidelines (ICNIRP 1998 and ICNIRP 2010) are used as bases for safety distance calculation and the difference between the two guidelines are discussed.
Kim, Ji-Soo;Cho, Gyu-Jung;Song, Jin-Sol;Shin, Jae-Yun;Kim, Dong-Hyun;Kim, Chul-Hwan
Journal of Electrical Engineering and Technology
/
v.13
no.6
/
pp.2196-2202
/
2018
The conventional power system allowed only downstream power flow. Therefore, even if a fault occurs, only the forward current flow is considered. However, with the interest in distributed generation (DG), DGs such as Photovoltaic (PV), Wind Turbine (WT) are being connected to a power system. DGs have many advantages, but they also have disadvantage such as generation of reverse flow. Reverse flow can severely disrupt existing protection systems that only consider downstream power flow. The major problems that may arise from reverse power flow are blinding protection and sympathetic tripping. In order to solve such problems, the methods of installing a directional relay or a fault current limiter is proposed. However, this method is inconceivable because of the economics shortage. Therefore, in this paper, a distance relay installed in existing power system is used to solve the protection problem. Modeling of distance relay has been carried out using ElectroMagnetic Transients Program (EMTP), and it has been verified through simulations that the above problems can be solved by a distance relay.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.8
/
pp.40-46
/
2014
The development of the superconducting fault current limiter (SFCL) to apply into a power transmission system where makes larger fault current compared to the power distribution system has been performed. Among various SFCLs, the trigger-type SFCL is suitable for application into the power transmission system due to the effective reduction on power burden of the high temperature superconducting element (HTSC) for the larger fault current. To protect the power transmission line in the power grid, the distance relay, which decides to interrupt fault section where can be calculated by the measured voltage and current from sound grid, is one of important protective devices in the power transmission system. However, the operation of the distance relay from the impedance of the fault point on the transmission line is affected by the impedance of the trigger-type SFCL. Therefore, the analysis on the operational characteristics of distance relay considering the application of the SFCL is required. In this paper, the effect on the operation zones of the distance relay by the impedance of the SFCL in a power transmission system was analyzed through the PSCAD/EMTDC simulation.
Kim, Myong-Hyon;Kim, Jin-Seok;Lim, Sung-Hun;Kim, Jae-Chul
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.9
/
pp.44-49
/
2011
Due to increase of fault current, various superconducting fault current limiter (SFCL) are researched. We studied a power distribution system with SFCL. Along the way, we knew characteristics of fault current according to a distance from substation to fault point. Fault current is reduced by distance`s increase from substation. Also, SFCL.s effects are decreased by distance too. Therefore, we analyzed the fault current by a distance from substation to fault point when a SFCL was applied into a power distribution system. We simulated using a PSCAD/EMTDC.
In this paper, we analyze the electrical characteristics of PV depending on distance among solar cells before and after lamination process. From the result, the PV module's maximum power increases about 3.37% when solar cells's distance is 10mm. And the maximum power increases up to 8.42% when solar cells's maximum distance is 50mm. It is assumed that PV module's surface temperature decreases because of increasing distance between solar cells that would give high power generation. Also, short distance between solar cell and frame result in contamination on glass. When considering reduced maximum power caused by contaminant, from that. we can fabricated PV module of lower cost with high performance.
We have hypothesized that nuclear risk is significantly inversely related to the distance from residences to nuclear power plants and that the level of life satisfaction of residents therefore increases with the distance. We empirically explore the relationship between Ulsan citizens' life satisfaction levels and the distance between their residences and the Kori and Wolsong nuclear power plants (NPP) based on the life satisfaction approach (LSA). The dataset we used covers only Ulsan citizens from the biennial Ulsan Statistics on Citizen's Living Condition and Consciousness of 2014 and 2016. Controlling for micro-variables such as education, work satisfaction, gender, marital status, and expenditures, we found a statistically significant relationship between life satisfaction and the distance between the residences and the nuclear power plants. Nuclear negative externalities including (i) health and environmental impact, (ii) radioactive waste disposal, and (iii) the effect of severe accidents can be quantified in terms of LS units and monetary units. We were able to calculate the monetary value of NPP externalities at $277 per kilometer of distance for Kori and $280 per kilometer of distance for Wolsong at constant 2015 prices. These estimates are quite different from the traditional estimates made with the contingent valuation method, whereas they are similar to the findings of LSA studies abroad. Hence, the need to adopt the LSA in South Korea and policy implications are demonstrated.
Purpose - In terms of human resource management, many Korean enterprises in China have experienced problems such as frequent resignations of Chinese employees and labor disputes. This can be mainly attributed to the fact that Chinese employees are not consistent with Korean vertical management methods, which is closely related to the national culture theory proposed by Hofstede, specifically the dimension of power distance and long- versus short-term orientation (LTO). Therefore, this research aims to investigate cultural differences between Korea and China from these two dimensions, and the impact on the human resource management of Korean-invested enterprises in China. Design/methodology - This research first utilizes the latest data (Wave 7) of the World Values Survey (WVS) to verify the difference in power distance and long- versus short-term orientation between Korean and Chinese cultures using responses from Korea and China, and then uses case analysis to analyze the impact of this cultural difference on the human resource management of Korean enterprises in China. Findings - Our main findings can be summarized as follows. Korea and China have significant differences in power distance and long- versus short-term orientation. In terms of power distance, Korean respondents show higher power distance compared to Chinese respondents. In the dimension of long- versus short-term orientation, it was found that Chinese respondents showed a shorter-term orientation, whereas Korean respondents showed a longer-term orientation. Originality/value - Previous studies put focus on the power distance and individualism-collectivism dimensions to explain cultural differences between Korea and China, and generated contradictory results. This research further confirms the cultural differences between Korea and China from the dimensions of power distance and long-versus short-term orientation using secondary data. The comparative studies from this perspective have long been underexplored and lack empirical confirmation.
The Transactions of The Korean Institute of Electrical Engineers
/
v.57
no.2
/
pp.172-178
/
2008
If the fault occurs on the underground power cable systems, the fault current on the sheath has an influence on all sections of cable because it's returned through earth at the directly grounded point and operation point of SVL(Sheath Voltage Limiter) on each insulated joint box. Therefore, the earth resistance and the operation of SVL have an effect on the zero-sequence current, and then the impedance between relaying point and fault point is increased. That causes the overreach of distance relay. For these reasons, the distance relay algorithm for protecting an underground power cable systems hasn't been developed till now. In this paper, new distance relay algorithm is developed for protecting a underground power cable system using fuzzy inference system which is the one of ACI(Advanced Computational Intelligence) techniques. This algorithm is verified by EMTP simulation of real power cable system, and proves to effectively advance the errors
Kim, Young-Tae;Lee, Kwangwon;Jeon, Youngil;Lee, Inkyu
Journal of Communications and Networks
/
v.17
no.5
/
pp.463-472
/
2015
This paper considers a limited feedback system for two-way wireless relaying channels with physical network coding (PNC). For full feedback systems, the optimal structure with the PNC has already been studied where a modulo operation is employed. In this case, phase and power of two end node channels are adjusted to maximize the minimum distance. Based on this result, we design new quantization methods for the phase and the power in the limited feedback system. By investigating the minimum distance of the received constellation, we present a code-book design to maximize the worst minimum distance. Especially, for quantization of the power for 16-QAM, a new power quantization scheme is proposed to maximize the performance. Also, utilizing the characteristics of the minimum distance observed in our codebook design, we present a power allocation method which does not require any feedback information. Simulation results confirm that our proposed scheme outperforms conventional systems with reduced complexity.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.