• 제목/요약/키워드: power budget

검색결과 269건 처리시간 0.027초

A Study on the Budget Policy Determinant Factors and the Budget Power of the Local Council: Focus on Metropolitan Council (지방의회의 재정지출 결정요인과 예산권한에 관한 연구: 광역지방의회를 중심으로)

  • Shin, Hyeri;Park, Jhungsoo
    • Korean Journal of Legislative Studies
    • /
    • 제27권2호
    • /
    • pp.111-143
    • /
    • 2021
  • It is necessary to analyze the budget power during the budget process of the local council, paying attention to strengthening the capacity of local council and reinforcing expertise to secure accountability. The budget power of council is expressed in various terms such as power of the purse and the authority to control the budget, and focuses on the role of control and check in the council's budget process. The purpose of this study is to analyze the factors that political·administrative variables, social·economical variables affect the budget power of local council. The budget power of councils was set as the budget net modification rate and the period for processing the budget bill at the plenary session. And the effects of various variables were checked. As a result, the local council confirmed that there was a lack of checks and controls in the budget process.

Design of a Cost-Effective Hybrid-Type PBEx Providing a High Power Budget in an Asymmetric 10G-EPON

  • Kim, Kwangok;Lee, Sangsoo;Lee, Jonghyun;Jang, Younseon
    • ETRI Journal
    • /
    • 제34권6호
    • /
    • pp.838-846
    • /
    • 2012
  • This paper proposes a cost-effective hybrid-type power budget extender (PBEx) that can provide a high power budget of over 45 dB in an asymmetric 10-Gb/s Ethernet passive optical network (10/1G-EPON). The hybrid-type 10/1G-EPON PBEx comprises a central office terminal (COT) and remote terminal (RT) module supporting four channels and uses a coarse wavelength division multiplexing (CWDM) technology between the COT and RT for a reduction of fiber cost and efficient access network design. The proposed 10/1G-EPON PBEx can provide over a 40-km reach and 128-way split per CWDM wavelength with no modification of a legacy 10/1G-EPON system and can satisfy the error-free service in $10^{10}$ packet transmission.

Development of the Power Simulation Tool for Energy Balance Analysis of Nanosatellites

  • Kim, Eun-Jung;Sim, Eun-Sup;Kim, Hae-Dong
    • Journal of Astronomy and Space Sciences
    • /
    • 제34권3호
    • /
    • pp.225-235
    • /
    • 2017
  • The energy balance in a satellite needs to be designed properly for the satellite to safely operate and carry out successive missions on an orbit. In this study, an analysis program was developed using the MATLAB(R) graphic user interface (GUI) for nanosatellites. This program was used in a simulation to confirm the generated power, consumed power, and battery power in the satellites on the orbit, and its performance was verified with applying different satellite operational modes and units. For data transmission, STK(R)-MATLAB(R) connectivity was used to send the generated power from STK(R) to MATLAB(R) automatically. Moreover, this program is general-purpose; therefore, it can be applied to nanosatellites that have missions or shapes that are different from those of the satellites in this study. This power simulation tool could be used not only to calculate the suitable power budget when developing the power systems, but also to analyze the remaining energy balance in the satellites.

Safety Management Cost Accounting for Underground Electric Power Transmission Facility Construction (전력구 설치 공사의 안전관리비 계상 기준에 관한 연구 )

  • Min Ho, Kim;Sung Woo, Shin
    • Journal of the Korean Society of Safety
    • /
    • 제37권6호
    • /
    • pp.50-59
    • /
    • 2022
  • In the Construction Technology Promotion Act (CTPA) of the Republic of Korea, safety management cost is enforced as a statutory cost that must be included in the budget of construction projects. However, the construction of underground electric power transmission facilities (UEPTFs) is not included in the category of construction works defined in the CTPA. Consequently, the statutory safety management cost does not apply to the construction of UEPTFs. To overcome this limitation, the clients of UEPTF construction projects generally provide internal guidelines enabling the addition of the safety management cost in the project budget. Nevertheless, even after the execution of the internal guidelines, some important cost items are omitted from the budget owing to the incompleteness of the guidelines. In this context, this paper proposes a complete set of accounting items and their calculation methods for appropriate budgeting of the safety management cost of UEPTF construction projects. To this end, the current budgeting method of the safety management cost of UEPTF construction projects is analyzed, and a questionnaire study is performed to confirm the necessary cost items and their appropriate calculation methods. Based on the results of the questionnaire study, a set of accounting items and their calculation criteria for the budgeting of the safety management cost of UEPTF construction projects are proposed.

Mobile Target Speed Estimation in Urban Environments with Adaptive Power Control (도시환경에서 적응전력제어를 이용한 이동국 속도추정)

  • Lee, Hyeon-Cheol;Lee, Jong Tae;Ryu, Sang Burm;Kang, Eun Su
    • Journal of Satellite, Information and Communications
    • /
    • 제11권1호
    • /
    • pp.46-50
    • /
    • 2016
  • The adaptive power control of Code Division Multiple Access (CDMA) systems for communications between User Equipments (UEs) with a link-budget based Signal-to-Interference Ratio (SIR) estimate which has distance information is applied to three inner loop power control algorithms. The speed estimation performances of these algorithms with their consecutive Transmit-Power-Control (TPC) ratios are compared to each other, and it is concluded that the speed can be estimated using the TPC ratio information of Consecutive TPC Ratio Step-size Closed Loop Power Control (CS-CLPC) and Fixed Step-size Power Control (FSPC).

Necessity Analysis and Link Budget of Two Way Paging Earth Station for Satellite (양방향 무선호출 위성 지구국 시스템의 필요성 분석 및 위성 링크 설계)

  • Jang, Dae-Ik;Kim, Dae-Yeong
    • The Transactions of the Korea Information Processing Society
    • /
    • 제6권9호
    • /
    • pp.2460-2469
    • /
    • 1999
  • Recently, appearing of various wireless telecommunications services, the competitive power of paging service is requested. In this paper, two-way paging earth station for satellite was proposed and designed to enhance the competitive power of cost and technique, and the link budget of this two-way paging networks using Koreas at was discussed. To reduce the cost of remote station, the antenna and HPA size of Hub and remote station were differently designed, and an idea of power allocations of inbound and outbound carriers was proposed and utilized in this link budget of two-way earth station for using satellite. The results of this link budget were follows. At the 0.043% time rate of rain, antenna size of Hub and remote station were 3.7m and 1.2m, the HPA size of Hub and remote station were 10.37W and 2.0W, and power allocations of outbound and inbound were 84% and 16% respectively. At the 0.02% time rate of rain, the antenna size of Hub and remote station were 3.7m and 1.8m and power allocations of outbound and inbound were 63% and 37% respectively.

  • PDF

Development of Electrical Power Subsystem of Cube Satellite STEP Cube Lab for Verification of Space-Relevant Technologies

  • Park, Tae-Yong;Chae, Bong-Geon;Oh, Hyun-Ung
    • International Journal of Aerospace System Engineering
    • /
    • 제3권2호
    • /
    • pp.31-37
    • /
    • 2016
  • STEP Cube Lab (Cube Laboratory for Space Technology Experimental Project) is a 1U standardized pico-class satellite. Its main mission objective is an on-orbit verification of five fundamental core space technologies. For assuring a successful missions of the STEP Cube Lab with five payloads, electrical power subsystem (EPS) shall sufficiently provide an electrical power to payloads and bus systems of the satellite during an entire mission life. In this study, a design process of EPS system was introduced including power budget analysis considering a mission orbit and various mission modes of the satellite. In conclusion, adequate EPS hardware in compliance with design requirements were selected. The effectiveness and mission capability of EPS architecture design were confirmed through an energy balance analysis (EBA).

Nitrogen Budget of South Korea Including Gaseous Nitrogen Oxides from 2012 to 2014 (기체상 질소산화물을 포함한 2012~2014년도 대한민국 질소수지 연구)

  • Lee, Hanuk;Oa, Seyeon;Park, Jae-Woo
    • Journal of Soil and Groundwater Environment
    • /
    • 제22권4호
    • /
    • pp.49-59
    • /
    • 2017
  • This study estimated the nitrogen budget, including gaseous nitrogen oxides ($NO_x$), of South Korea in 2012~2014. The nitrogen budget was classified into three categories: agricultural and livestock, forest, and city. To estimate the nitrogen budget, several input and output parameters were investigated, including deposition, fixation, irrigation, chemical fertilizer use, compost, fuel, denitrification, volatilization, runoff, crop uptake, leaching, and $NO_x$ emissions. The annual nitrogen inputs from 2012 to 2014 were 6,202,828, 6,137,708, and 6,022,379 ton/yr, respectively. The corresponding annual nitrogen outputs were 1,393,763, 1,380,406, and 1,360,819 ton/yr, respectively, signifying a slight decrease from 2012 to 2014. $NO_x$ was the parameter contributing to the nitrogen budget to the greatest extent. The annual ratios of $NO_x$ emissions by vehicles, power plants, and businesses were 0.31, 0.31, and 0.30 in 2012, 2013, and 2014, respectively. A change in government policy that prohibited the disposal of livestock manure and sewage sludge in the ocean from 2012 affected nitrogen budget profile. As a result, the ocean disposal ratio completely diminished, which differs from previous studies.

ANALYSIS ON THE EVALUATION OF PROJECT EFFICIENCY BASED ON BUDGET EXECUTION: PLANNED OUTAGE MAINTENANCE (POM) FOR ELECTRICITY POWER PLANT

  • Sungkon Moon;Sangwon Han;Myoungwon Kang
    • International conference on construction engineering and project management
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.66-73
    • /
    • 2011
  • With rapid industrialization, electric power consumption has been increasing every year in Korea and in other countries. The provision of additional power stations to produce more electricity is one possible response to this steady increase in consumption. Another alternative is to improve the efficiency of existing stations through timely and effective maintenance works. Since the construction of a new power plant involves a large amount of capital as well as difficulties in the selection of sites, the improvement of existing power stations' efficiencies is often a preferred solution. Therefore, this paper focuses on maintenance project management to address this issue. Among several types of maintenance works, this paper concentrates on planned outage maintenance (POM). This focus arises from the critical impact of POM on other maintenance work, as well as the entire process of electricity production. Unlike other maintenance work, POM is done on the basis of mid and long-term plans. In addition, only POM works are conducted during the outage of all power plants. To evaluate the efficiency of POM works, budget data relating to 164 POM projects between 2001 and 2008 was collected from 7 sites in South Korea. Data envelopment analysis (DEA) was selected as a methodology for evaluation. From this analysis, comparative study was used to determine the categories of projects that had performed well, and those with the most optimized budget structures. Moreover, through discussion with industry, this research develops a feasible proposed method by which to enhance the efficiency of POM projects.

  • PDF

A Bit Allocation Algorithm Using Adaptive Bandwidth for DMT (적응적인 대역폭을 이용한 DMT에서의 비트 할당 알고리듬)

  • 최현우;신봉식;정정화
    • Proceedings of the IEEK Conference
    • /
    • 대한전자공학회 1999년도 추계종합학술대회 논문집
    • /
    • pp.372-375
    • /
    • 1999
  • This paper proposes a bit allocation algorithm using adaptive bandwidth for ADSL that uses the DMT technology. In certain cases for high attenuation loops the conventional algorithms are unable to assign data bits to the higher frequency tones, due to the power spectrum mask limitation recommended by ANSI Standard, even if the total power budget is not expended. In the proposed bit allocation algorithm, adjacent empty tones that would not be used merge into single tone, then additional bits is assigned to the merged empty tones. Because additional bits is allocated, most of the available power is used. The proposed algorithm show that total bit increase in about 2~9% bits more than about conventional "water-filling" and "bit removal" algorithms and that is able to use about 93% of the available budget Power

  • PDF