• Title/Summary/Keyword: plant simulator

Search Result 283, Processing Time 0.037 seconds

The Development of Full-Scope Replica Type Simulator for PWR Nuclear Power Plants (가압경수로 원자력 발전소의 전범위 복제형 시뮬레이터 개발)

  • 이중근
    • Journal of the Korea Society for Simulation
    • /
    • v.6 no.1
    • /
    • pp.85-96
    • /
    • 1997
  • Designing and constructing a proper simulator for real power plants requires extensive research in human engineering and computer science and integration of different fields of technologies such as system analysis, operational knowledge for nuclear plant, etc. A full scope replica type simulator for nuclear power plant is developed. The simulator has the same feature and operational functions as one in the main control room (MCR) of a reference power plant. The simulator provides the necessary training to recover or reduce damages from accidents that usually are unpredictable. This paper describes the configurations and characteristics for the simulator that is developed for Younggwang Nuclear Power Plant #3,4 which is the basic model of the Korean Nuclear Power Plant. The paper also describes technical aspects of Auto Code Generator that is used for developing the simulator. The successful development of the simulator will contribute to improve safety in operation of nuclear power plants.

  • PDF

The application of a virtual plant simulator and a Ladder Diagram of PLC (PLC LD 제어언어와 가상 플랜트 시뮬레이터의 적용)

  • Lee, Gi-Bum;Lee, Jin-S.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07b
    • /
    • pp.699-702
    • /
    • 1999
  • This paper represents the application of a virtual plant simulator and a Ladder Diagram of PLC. A target plant is a material transport car that repeatedly conveys along the rails. The whole process is automatically operated by PLC. The simulation system consists of the POSFA PLC and the virtual plant simulator. We demonstrate that operation of a LD program corresponds to operation of the virtual plant simulator.

  • PDF

The development of full-scope replica simulator for variable supercritical pressure once-through fossil power plants (변압 관류형 초임계압 화력발전소 전범위 시뮬레이터 개발)

  • Lee, Jung-Kun;Ahn, Yeon-Shik;Jung, Hoon;Lee, Yong-Kwan;Han, Byoung-Sung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.4 no.3
    • /
    • pp.392-399
    • /
    • 1998
  • A full-scope replica type simulator whose MCR(main control room) has the same features and operation functions as MCR of the reference power plant has been developed for a fossil power plant. This simulator was developed with the model of Poryung Fossil Power Plant #3,4 which is the standard model of the Korean fossil power plant. It is the first localized simulator for the supercritical, variable boiler pressure type fossil power plant. The simulator provides various kinds of accidents which are in normal plant operation and thus enables operators to recover or reduce possible damages. To design and develop this kind of simulator, we need to integrate high technologies such as system analysis, plant operation and system integration of mechanics, physics, computer science. CASE(Computer Aided Software Engineering) tools were used to develop the dynamic model. This simulator will greatly contribute to the improvement of the safety and efficiency of the fossil power plant by implementing operator training. In this paper, the outline of software and hardware configuration and characteristics of the simulator are described, and the results of 30%, 50%, 75%, 100% load operation test will be discussed.

  • PDF

A Full Scale Fossil Power Plant Simulator For Hadong (하동 화력 발전소 전범위 시뮬레이터 개발)

  • 김성호;김종현;조창호
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.204-204
    • /
    • 2000
  • This paper describes the development of training simulator for Hadong fossil Power Plant. The simulator was developed to train operator, test new control Logic and evaluate alternative operating procedure for expert engineer of control system. The most control logics such as Siemens TELEPERM ME and GE Mark V are translated directly from microprocessors. Those HMI are also directly emulated. The simulation was performed by ProTRAX modeling software. The paper discusses the configuration of simulator and the simulation results of 30%, 50%, 75% and 100% normal rate load test.

  • PDF

Development of Web-based Power Plant Simulator System (원격 훈련용 발전 시뮬레이터 개발)

  • Byun, Seung-Hyun;Kang, Hae-su;Woo, Joo-Hee;Lee, Jee-Hoon;Kim, Duck-Ho
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.277-283
    • /
    • 2021
  • Power plant simulators have been used for operator training, control verification and engineering verification. In general, simulators can be used in the place where they are installed by only single user group at a time. Considering high cost of simulator development, a lot of available scenarios, the diversity of user level and accessibility based on users' work location, development of simulator system that can be used by multiple user groups regardless of location is required in order to enhance utilization of simulators. In this paper, the simulator system that can be used by multiple user group simultaneously without location limitation is proposed. The simulator system is composed of simulator servers, database servers, HMI servers, a web server, web clients. Simulator server consists of control model, process model that are developed for Circulating Fluidized Bed power plant located overseas. A web server manages user accounts, operation procedures, multiple server access between web client group and simulator server group. In other words, a web server makes a user group select a simulator server at a time. The developed simulator system is integrated after implementing process model, control model, HMI, and web server. Web client systems are installed on local site where power plant is located, while simulator servers, HMI servers, database servers, and a web server are located in KEPCO RI. The developed simulator system is verified by steady-state test, malfunction test and so on via remote access.

Modeling and simulation of foxboro control system for YGN#3,4 power plant (영광 3,4호기 Foxboro 제어시스템 모델링 및 시뮬레이션)

  • 김동욱;이용관;유한성
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.179-182
    • /
    • 1997
  • In a training simulator for power plant, operator's action in the MCR(Main Control Room) are given to plant process and computer system model as an inputs, and the same response as in real power plant is provided in real time. Inter-process communication and synchronization are especially important among various inputs. In the plant simulator, to simulate the digital control system such as FOXBORO SPEC-200 Micro control system, modification and adaptation of control card(CCC) and its continuous display station(CDS) is necessary. This paper describes the modeling and simulation of FOXBORO SPEC-200 Micro control system applied to Younggwang nuclear power plant unit #3 & 4, and its integration process to the full-scope replica type training simulator. In a simulator, display station like CDS of FOXBORO SPEC-200 Micro control system is classified as ITI(Intelligent Type Instrument), which has a micro processor inside to process information and the corresponding alphanumeric display, and the stimulation of ITI limits the important functions in a training simulator such as backtrack, replay, freeze and IC reset. Therefore, to achieve the better performance of the simulator, modification of CDS and special firmware is developed to simulate the FOXBORO SPEC-200 Micro control system. Each control function inside control card is modeled and simulated in generic approach to accept the plant data and control parameter conveniently, and debugging algorithms are applied for massive coding developed in short period.

  • PDF

Development of Nuclear Power Plant Simulator using Shared Memory Variables (공유메모리 변수를 사용한 원자력발전소 시뮬레이터 개발)

  • 박근옥;서용석
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 2001.05a
    • /
    • pp.153-156
    • /
    • 2001
  • We have developed CNS(Compact Nuclear Simulator) which can be used for the fundamental training of the nuclear power plant operators. The application software for CNS consists of simulation engine(analyzer code), instructor station software, and man-machine interface software. Each application software is regarded as one black box and the communication of black boxes is performed by the predefined shared memory variables. In this paper, we discuss our experience for CNS development.

  • PDF

An Implementation of I/O Interface System for Power Plant Simulator (발전소 시뮬레이터 I/O 인터페이스 시스템 구축에 관한 연구)

  • 변승현;장태인;조지용;곽귀일
    • Proceedings of the IEEK Conference
    • /
    • 1999.06a
    • /
    • pp.773-776
    • /
    • 1999
  • For providing good quality power steadily, it is required that operators manipulate the control system of power plant with the good knowledge of power plant system and the control strategies, and cope with accidents effectively. With those requirements, it is general to train operators in power plant control room using full-scope simulator. A full scope simulator adopts the I&C instruments in the main cotrol room, so has to include I/O interface system to interface the simulation computer with I&C instruments in main control room. In already developed simulators, most of I/O interface systems are closed. vendor-dependent. proprietary systems. so have the many disadvantages in terms of cost and maintenance. In this paper. we suggest the method to configure I/O interface system for Thermal Power Plant Simulator based on standard technology which gives the advantages of ease-of-use. cost effectiveness, and simplicity of maintenanceuse by using off-the-shelf products for system integration.

  • PDF

The Reduction of Generator Output Calculation by Using 6σ Method on Steam Turbine Simulator in a Nuclear Power Plant (6시그마 기법을 적용한 원자력 터빈 시뮬레이터의 발전기 출력 연산오차 저감)

  • Choi, In-Kyu;Kim, Jong-An;Park, Doo-Yong;Woo, Joo-Hee;Shin, Man-Su
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.5
    • /
    • pp.1017-1022
    • /
    • 2011
  • This paper describes the improvement of the calculation by using $6{\sigma}$ method on steam turbine simulator in a nuclear power plant. The simulator is essential to not only verification and validation of control logic but also making sure of control constants in upgrading the long time used control system into the new one. And the dynamic model is a key point in that simulator. The model used during the retrofit period of the turbine controller in Kori Nuclear Power Plant makes difference in calculating generator output and control valve positions. That is because such operating data as the main steam pressure, the main steam temperature and control valve positions of Yongkwang #3 are different from those of Kori #4. Therefore, the model parameters must be tuned by using actual operating data for the high fidelity of simulator in calculating the dynamic characteristic of the model. This paper describes that the $6{\sigma}$ method is used in improvement of precision of generator output calculation in the steam turbine model of the simulator.

Load Test Simulator Development for Steam Turbine-Generator System of Nuclear Power Plant

  • Jeong, Chang-Ki;Kim, Jong-An;Kim, Byung-Chul;Choi, In-Kyu;Woo, Joo-Hee
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1384-1386
    • /
    • 2005
  • This paper focuses on development of load test simulator of a steam turbine-generator in a nuclear power plant. When load is taken off from electrical power network, it is very difficult to effectively control the steam flow to turbine of the nuclear turbine-generator, because of disturbances, such as electrical load and network unbalance on electrical network. Up to the present time, the conventional control system has been used for the load control on nuclear steam generator, owing to the easy control algorithms and the advantage which have been proven on the nuclear power plant. However, since there are problems with stability control during low power and start-up, only a highly experienced operator can operate during those procedures. Also, a great deal of time and an expensive simulator is needed for the training of an operator. The KEPRI is developed simulator for 600MW nuclear power plant to take a test of generator load rejection, throttle valve, and turbine load control. Total load test is implemented before start up.

  • PDF