• Title/Summary/Keyword: pipe maintenance

Search Result 251, Processing Time 0.031 seconds

The developing optimum maintenance cost model for water pipe network by waterworks business characteristics (수도사업자의 경영환경을 고려한 상수도관망 적정 유지관리비 산정 모델 개발 연구)

  • Kim, Kibum;Kim, Changhwan;Shin, Hwisu;Seo, Jeewon;Hyung, Jinseok;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.1
    • /
    • pp.51-62
    • /
    • 2017
  • For the asset management of a water pipe network, it would be necessary to understand the extent of the maintenance cost required for the water pipe network for the future. This study would develop a method to draw the optimum cost required for the maintenance of the water pipe network in waterworks facilities to maintain the aim revenue water ratio and to achieve the target revenue water ratio, considering the water service providers' waterworks condition and revenue water ratio comprehensively. This study conducted a survey with 96 water service providers as of the early 2015 and developed models to estimate the optimum maintenance cost of the water pipe network, considering the characteristics of the water service providers. Since the correlation coefficient of all the developed models was higher than 0.95, it turned out that it had significant reliability, which was statistically significant. As a result of applying the developed models to the actual water service providers, it was drawn that increasing revenue water ratio to more than a certain level can reduce the maintenance cost of the water pipe network by a great deal. In other words, it is judged that it would be the most efficient to secure the reliability of waterworks management by increasing the short-term revenue water ratio to more than a certain level and gradually increase the revenue water ratio from the long-term perspective. It is expected that the proposed methodology proposed in this study and the results of the study will be used as a basic research for planning the maintenance of water pipe network or establishing a plan for waterworks facilities asset management.

Maintenance Priority Determination Method considering the Shape and Property Information of Roads and Pipe Networks (도로, 관망의 형상 및 속성정보를 고려한 유지보수 우선순위 결정 방법)

  • Jang, Young-Hoon;Park, Wonyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.279-280
    • /
    • 2023
  • Due to the deterioration of infrastructure, the importance of maintenance is continuously increasing. Therefore, an integrated maintenance method for various facilities is required. In this study, a maintenance priority determination method for integrated maintenance of roads and pipe network facilities was developed. It is possible to analyze attribute information by using GIS data of roads and pipe networks, and shape information can be used. This information is derived as quantitative figures for determining maintenance priorities. In the future, it is expected that facility maintenance can be further advanced in connection with maintenance method and quantity information for each facility.

  • PDF

Deterioration Evaluation for Industrial Pipeline by Sectionalizing (산업시설 배관의 섹션화에 의한 노후도 평가)

  • Min, Hyuk-Ki;Kim, Sang-Bum;Kim, Byung-Woo;Kim, Hyoung-Ki;Park, Yool
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.3
    • /
    • pp.123-130
    • /
    • 2016
  • This study introduced deterioration evaluation item and criteria that could be applied to industrial facilities with the most widely used carbon steel pipe installed for ordinary piping (KSD 3507). Experimental industrial pipes were evaluated with pipe sectionalizing method combined with the established evaluation item and criteria to measure and manage semi-continuously for overall piping system. After applying outcomes from this study to a plant of incineration facility, a 42% saving in repairing and remodeling cost was achieved.

A Field Survey on the Structure and Maintenance Status of Pipe Framed Greenhouses (파이프 골조 온실의 구조 및 유지관리실태 조사분석)

  • 남상운
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.4
    • /
    • pp.106-114
    • /
    • 2000
  • An investigation was conducted to get the basic data for establishing maintenance strategy of pipe framed greenhouses. The contents of the investigation consisted of actual state of structures, maintenance status, meteorological disaster, and corrosion characteristics of pipe framework in greenhouses. the number of greenhouses investigated was 108 in total. Most multi-span greenhouses had narrower width and lower height than the standared 1-2W greenhouse, and most of single-span greenhouses were tunnel type. In multi-span greenhouses, the size and interval of frameworks such as rafter, purline, column , and cross beam were mostly suitable, but frameworks of single-span greenhouses were mostly insufficient. After about 7 years in grounds, 8 years in joints, 10 years in bending parts. and 13 years in columns. pipe surface was mostly rusted. Most weak parts in corrosion were pipes in contact with the ground, joints, roll-up shaft pipes, and pipes close to the gutter. Almost all of the greenhouse farmers didn't pay any attention to maintenance affair in a regular interval for pipe framed grenhouses. Many greenhouses have experienced the meteorologicla diaster such as uplift of foundation, partial or complete failure by the hyphoon and/or high winds.

  • PDF

Motion Control Algorithm for Crawler Type In-Pipe Robot (크롤러 방식 터널로봇의 모션제어 알고리즘)

  • Bae, Ki-Man;Lee, Sang-Ryong;Lee, Sang-il;Lee, Choon-Young
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.3 no.2
    • /
    • pp.66-73
    • /
    • 2008
  • The pipes have been laid underground while the industry is developing. We have to take maintenance procedure when the pipes are cracked or ruptured. It is very difficult jop to check pipe's crack because the pipes are narrow and laid underground. Using in-pipe robot, we can check the conditions of inner section of pipes, therefore, we designed a crawler type robot to search cracked pipe. In this paper, we have made a special focus on the control of the robot using differential drive algorithm to move in curved section of pipes. The detailed design of the robot with experimental result show the effectiveness of the robot in pipe maintenance.

  • PDF

Development of a System Dynamics Model to Support the Decision Making Processes in the Operation and Management of Water Supply Systems (상수도 시스템의 운영 및 유지관리 의사결정 지원을 위한 시스템다이내믹스 모형의 개발)

  • Park, Su-Wan;Kim, Kyu-Lee;Kim, Bong-Jae;Lim, Ki-Young
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.7
    • /
    • pp.609-623
    • /
    • 2010
  • In this paper the feedback loop mechanisms that are inherent in the management of water supply systems were identified based on the system dynamics modeling methodology. As a result, a system dynamics (SD) computer simulation model that can be used to aid efficient management of water supply systems was developed. The developed SD model can be used to predict operating conditions of water supply systems including the effects of pipe maintenance on the entire system. The developed model is consisted of water supply, pipe maintenance and water supply business finance model. The operation and maintenance data from a study water supply system were used to verify the model and to predict the past and future operating conditions of the system. The policy leverage that greatly affects the operating condition was evaluated by the sensitivity analyses for the operational indices due to changes in the exogenous variables. It was found that while the pipe maintenance related exogenous variables had great effects on the leakage and conditions of pipes, they did not have great effects on the major operational indices such as revenue water ratio. It is considered that the social costs due to leaks and pipe breaks and the corresponding mechanism of propagation of the costs must be modeled to better evaluate the effects of pipe maintenance on the operational conditions of water supply systems.

Robot Posture Estimation Using Circular Image of Inner-Pipe (원형관로 영상을 이용한 관로주행 로봇의 자세 추정)

  • Yoon, Ji-Sup;Kang , E-Sok
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.51 no.6
    • /
    • pp.258-266
    • /
    • 2002
  • This paper proposes the methodology of the image processing algorithm that estimates the pose of the inner-pipe crawling robot. The inner-pipe crawling robot is usually equipped with a lighting device and a camera on its head for monitoring and inspection purpose of defects on the pipe wall and/or the maintenance operation. The proposed methodology is using these devices without introducing the extra sensors and is based on the fact that the position and the intensity of the reflected light from the inner wall of the pipe vary with the robot posture and the camera. The proposed algorithm is divided into two parts, estimating the translation and rotation angle of the camera, followed by the actual pose estimation of the robot . Based on the fact that the vanishing point of the reflected light moves into the opposite direction from the camera rotation, the camera rotation angle can be estimated. And, based on the fact that the most bright parts of the reflected light moves into the same direction with the camera translation, the camera position most bright parts of the reflected light moves into the same direction with the camera translation, the camera position can be obtained. To investigate the performance of the algorithm, the algorithm is applied to a sewage maintenance robot.

Adsorption behaviour of film-forming amine on pre-oxidized carbon steel surface

  • Genxian, Lin;Yun, Sun;Canshuai, Liu;Jun, Fang;Lijun, Song;Bin, Liu
    • Nuclear Engineering and Technology
    • /
    • v.54 no.4
    • /
    • pp.1185-1194
    • /
    • 2022
  • The maintenance of condenser main pipe is the key to achieve film-forming amine maintenance effectiveness. In this work, oxygen content, pH and temperature of the solution were controlled to simulate the condition of condenser main pipe, and magnetite coated carbon steel sample was prepared by pre-oxidization. CAM was used to characterize the hydrophobicity of film formed samples. Hydrophobic film was formed on pre-oxidized carbon steel samples when octadecylamine concentration reaches 20 mg/kg. SEM, EDS, EIS, and PD were used to characterize the influence of octadecylamine concentration on maintenance effectiveness. It was found that the maintenance effectiveness was enhanced and the corrosion rate was suppressed with the increase of octadecylamine concentration. FIB and TEM were used to detect the adsorbed octadecylamine film thickness founding that octadecylamine adsorbed onto the surface of pre-oxidized carbon steel by multi-layer adsorption mechanism.

A Study of the Sectionalizing for Pipe Deterioration Evaluation in Industrial Facilities (산업시설 배관 노후도 평가를 위한 배관 섹션화 방안 연구)

  • Min, Hyuk-Ki;Kim, Sang-Bum;Kim, Byung-Woo;Kim, Hyoung-Ki;Park, Yool
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.2
    • /
    • pp.103-111
    • /
    • 2015
  • In general, no particularly well-established standards have been in place so far, for the method of evaluating the deteriorated level of pipes and ducts of industrial facilities. For that reason, the evaluation depends upon various studies which are based on the analysis of the residual life, thickness thinning, closure rate, and scale thickness that measure a few specific positions of pipes. It also depends upon the expertise in business operation and the specific techniques conducted by the inspection companies and institutions. This research introduces the concept of measuring units per section and the selection method of measurement points per section. Furthermore, specific methodologies were developed to plan and analyze deterioration level of industrial pipes and ducts by engineers and managers using a section map. Consequently, applying the outcomes from this study to the plant equipment of the incineration facility resulted in saving 42% of the repairing and remodeling cost.