This study provides allocation methods and transaction instances of introducing pilot projects of $SO_2$ emission trading that recently rises as an scheme for effective emission regulation to internalizing environmental externalities. The emissions caps that is the total endowment of $SO_2$ emission permits are calculated in each emission plant by considering methods for distributing those permits-by giving them away or by selling them at auction. The method adopted in this study has several defects in application of the reality. However, this study may have contributions to cognize the importance of, allowance trading among the participants and to firstly design the allocations of emission permits for each plant using real emission data.
Water loss is one of the typical but challenging problems in water management. To reduced water loss or increase water efficiency, the pilot projects were implemented in the TTD's irrigation area. Modern soil moisture technology and local level water user training were conducted together as a mean to achieve improved water efficiency. In terms of technology, soil moisture sensors and monitoring system were used to estimate crop water requirement to reduce unnecessary irrigation. This was found to save 16.47% of irrigated water and 25.20% of irrigation supply. Further improvement of water efficiency was gained by means of local level water user training in which stakeholders were engaged in the network of communications and co-planning. The lessons learnt from the TTD pilot project was translated into good water management practices at local level.
건설프로젝트에서 발생하는 정보의 양이 방대해짐에 따라 프로젝트 관리에 있어서 정보시스템의 역할이 점점 커지고 있다. 최근 건설프로젝트관리를 위한 효율적 의사결정 지원도구인 PMIS (건설사업관리정보시스템)가 다양한 프로젝트에 적용되고 있으나 그 활용정도가 저조한 실정이때 보다 효율적으로 프로젝트를 관리할 수 있는 시스템 개발이 요구되고 있다. 건설정보화의 발전단계 측면에서 살펴보면 2D 기반에서 3D 기반으로, 최근에는 BIM 기술로 발전되어 가고 있으며 BIM기술을 접목한 PMIS의 개발이 연구대상으로 부상하고 있다. 본 연구에서는 BIM 기술기반의 PMIS 개발을 위한 Pilot Test 모델을 제시하고 그 활용성을 검토하기 위한 프로세스를 제시하여 향후 BIM 기반의 PMIS 발전방향을 모색하고자 한다.
Sustainable housing design can contribute to dramatically reduced energy usage and can be applied to all new building projects. This paper explores the potential in Korea of applying available energy efficient building technologies. The objective was to determine the degree of energy reduction that can easily be achieved in new building design. The pilot project is providing some prototypes with display units which incorporate principles of sustainable design and performance utilizing the eco-design objectives. This building challenges ingrained preconceptions about system designs for four energy saving levels(40%, 60%, 80% and zero energy) and exposes barriers to low energy buildings posed by new standards and guidelines.
As urbanization and its consequences become the issue of modern cities, the concept of Smart City comes as the solution. Though a lot of researches on the topic is done, still no clear definition is given for both: Smart City itself and the factors of a successful Smart City. While most of the literature centers the role of ICT it is not a sufficient condition for a city to become Smart; the role of intellectual capital is underestimated. Using a collection of Smart City definitions across the time and providing concrete cases, this research seeks to bridge definition gaps and creates a tool for understanding Smart Cities. Drawing on the findings of several case studies, this research derives several explanatory factors. The citizen's engagement and governance are identified as the two key success factors of Smart City Projects along with ICT and other factors as enablers. The research has purpose as follows: 1) To bridge definition gaps of the "Smart City" by defining the term "Smart City," based on existing concepts and characteristic mechanisms across times.; 2) To develop an analytical tool for Smart City success factors through Explanatory Variables.; and 3) To identify major challenges and barriers of Smart City Projects implementations and to provide recommendations and solutions, based on existing governmental initiatives and pilot projects. The research contributes to the knowledge of smart cities and ICT integration for urbanization issues solution. By applying the findings of this research at the managerial level stakeholders may benefit by getting higher efficiency of the Smart City Projects and by utilizing knowledge and values of a Smart City Projects in a prioritized way.
1) 제주도 사업의 경우에 고양시보다 의료기관의 참여도가 높았는데 이것은 처방내에서 혹은 동일 의사의 처방내에서 병용금기나 중복의 발생을 줄이는 노력을 기울인 사실을 의미하였다. 빈도수에 있어서 병용금기는 고양시에서 처방전 1만 건당 0.45건 발생에서 제주도는 0건으로, 중복의 경우는 고양시에서 1만 건당 197건에서 제주도는 23건으로 감소하였다. 2) 하지만 제주도의 의료기관 참여도가 높음에도 불구하고 다른 의사 처방과의 점검에서는 병용금기 및 중복이 뚜렷이 감소하지 않았다. 병용금기의 발생은 고양시에서 1만 건당 4.95건에서 제주도의 경우 4.16건으로, 중복의 경우에 고양시의 경우 1만 건당 426건에서 제주도는 381건으로 감소하였지만 그 차이는 동일 의사 점검에서와 같은 뚜렷한 감소가 아닌 미세한 것이었다. 3) 두 지역을 통합하여 계산하였을 때 병용금기 발생의 동일 의사 점검: 다른 의사 점검의 비(比)(ratio)는 1:23으로 계산되었다. 4) 고양시 지역에서 중복의 발생은 동일 의사 점검: 다른 의사 점검의 비(比)(ratio)는 1: 2.12이었으며 제주도의 경우 그 비(比)(ratio)는 1:16.5이다. 5) 병용금기나 중복의 발생 문제 대부분이 다른 의사가 발행한 복수 처방에 의한 의약품의 병용에서 비롯하는 문제이며 이것은 의도하거나 인지하지 못한다는 점에서 단순 다제병용보다 심각한 문제를 포함할 수 있다. 6) 연구의 발견점은 의료 및 약사용 측면에서 통합성을 높이는 정책대안의 시급성을 시사하고 있으며 DUR제도의 확대강화와 단골약국 이용을 통하여 이러한 목표를 향한 정책을 지지해주는 결과라고 볼 수 있다.
The Human Sensory Feedback Laboratory, park of the Armstrong Laboratory at Wright-Patterson Air Force Base, Ohio, is involved in the development and evaluation of systems that provide sensory feedback to the human operator in telerobotic and virtual environment applications. Specific projects underway in the laboratory are primarily concerned with the information provided by force and vibrotactile feedback to the operator in dextrous manipulation tasks. Four specific research projects are described in the present report. These include : 1) experiments evaluating a 30-element fingertip display, which employs a titanium-nickel shape memory alloy actuator design to provide vibrotactile feedback about object shape and surface texture ; 2) of a fingertip force-feedback display for 3-dimensional information about object shape and suface texture ; 3) use of a force- feedback joystic to provide "force tunnel" information in pilot pursuit tracking tasks ; and 4) evaluations of a 7 degree-of-freedom exoskeleton used to control a robotic arm. Both basic and applied research questions are discussed.
Green building can contribute to reduce the energy usage dramatically and can be applied to new building projects. This paper explored the efficient construction process for sustainable and green building. Construction process will be performed on the new green building projects and performance evaluation will be carred out as well. For this background, a pilot project of POSCO Green Building provides how to invigorate the low-energy green building which ensure quality and performance by establishing process concept of construction phase to realize the sustainable green building.
As the largest shipbuilding company in the world and the leader in the Korean merchant shipbuilding industry, Hyundai Heavy Industries is currently struggling to carry out intensive productivity improvement efforts in order to be the global merchant shipbuilding market leader by surpassing in the competition with Japan and being free from the defiance of China armed with very cheap labor costs. This paper introduces the academy-and-industry collaborative project, a part of the productivity improvement efforts, which has conducted on the steel stockyard operations. As a pilot project that researches for the way of improving the stockyard operations and ignites further projects on the stockyard operations, the project defined the stockyard operations, measured current situations, and analyzed management dilemmas. In addition, the project developed the steel stockyard operations simulator. Besides that the simulator is used by the operations manager who has heavily relied on his work-experienced intuition when making decisions, this paper expects that further projects on the stockyard operations utilize the simulator for their own purposes.
The 1th International Conference on Construction Engineering and Project Management
/
pp.996-1001
/
2005
Today, government is no longer considered the sole provider of public works or services. Public-Private Partnership (PPP) has been recognized as an important approach to solving problems for governments in providing public works and services. However, the joint ownership of public works/services complicates the administration of PPP projects. Particularly, the fact that government may rescue a distressed project and renegotiate with the developer causes serious problems in project procurement and management. This paper aims to study when and how government will rescue a distressed project and what impacts government's rescue behavior has on project procurement and contract management. A game-theory based model for government rescue will be developed. This pilot study, the author hopes, may provide theoretic foundations to practitioners/policy makers for prescribing creative PPP procurement and management policies and for examining the effectiveness of PPP policies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.