• Title/Summary/Keyword: pile walls

Search Result 67, Processing Time 0.021 seconds

The Deformation Behavior of Anchored Retention Walls installed in Cut Slope (절개사면에 설치된 앵커지지 합벽식 옹벽의 변형거동)

  • Yun, Jung-Mann;Song, Young-Suk
    • The Journal of Engineering Geology
    • /
    • v.19 no.4
    • /
    • pp.475-482
    • /
    • 2009
  • The behavior of earth retention wall installed in cut slope is different from the behavior of retention wall applied in urban excavation. In order to establish the design method of anchored retention walls in cut slope, the behavior of anchored retention wall can be investigated and checked in detail. In this study, the behavior of anchored retention wall was investigated by instrumentation installed in cut slope for an apartment construction stabilized by a row of piles. The horizontal displacement of anchored retention wall was larger than the displacement of slope soil behind the wall at the early stage of excavation. As the excavation depth became deeper, the horizontal displacement of slope soil was larger than the displacement of anchored retention wall. It means that the horizontal displacement of anchored retention wall due to excavation is restrained by soldier pile stiffness and jacking force of anchor. Jacking force of anchor was mainly influenced in the horizontal displacement of anchored retention wall. The displacements of anchored retention wall and slope soil were affected mainly by an rainfall infiltrated from the ground surface. Meanwhile, the horizontal displacement of anchored retention wall with slope backside was about 2-6 times larger than the displacement of anchored retention wall with horizontal backside of excavation.

Development of DHLT Joint for Vertical Cutoff Walls in Offshore Waste Landfill Site (해상처분장 연직차수공을 위한 DHLT 이음부의 개발)

  • Hong, Young-Ho;Lee, Jong-Sub;Lee, Dongsoo;Chae, Kwang-Seok;Yu, Jung-Doung
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.3
    • /
    • pp.43-56
    • /
    • 2018
  • Vertical cutoff walls such as steel pipe sheet piles (SPSPs) have been commonly applied for the construction of the offshore waste landfill site. Because the SPSPs are sequentially installed by connecting their joints to those of adjacent piles, their mechanical stability should be ensured against the inherent external forces on the sea. The objective of this study is to evaluate the structural performances of the newly developed types of SPSP joint compared with those of other joint types. The problems of the traditional SPSP joints are investigated, and an advanced joint shape of SPSP, which is named double H with L-T (DHLT) joint, are designed for improving the constructability and maintenance. Full-scale models of the DHLT joint are manufactured, and then its joint areas are filled with grout material. After 28 days of curing time, compressive and tensile strength tests were performed on the joint models and the test results were compared with those of the traditional joints. Experimental results show that the structural capacities of the DHLT joint models are lower than those of traditional joints due to the influence of grout and steel members. In the cases of the compressive strength test, especially, bending occurs on steel H-beam with no distinct cracks in grout due to the asymmetrical structure of joint which has no reaction force. This study shows that the performance of the SPSP joint can be improved by considering the influence factors on the structural capacities estimated by the experimental tests.

Model Test of Stabilizing Measures for Ground Failure Due to Soft Ground Excavation (연약지반 굴착에 따른 지반파괴 억지대책 실내모형 실험)

  • Kim, Jae-Hong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.907-917
    • /
    • 2014
  • When conducting excavations after burying the soft ground, even if the retaining walls are installed, failure often occurs within backfill. In order to minimize the occurrences of failures, model test was performed after the installation of stabilizing piles to investigate the stabilizing effects. The model chamber is set up with clay foundation reinforced with and without stabilizing piles. During the excavation of clay foundation, the subsidence, pore water pressure, and soil pressure along the excavation were measured. As a result of the model test, the increase of excavation levels and the reduction of subsidence of back ground were observed with the stabilizing piles, compared to those without the stabilizing piles. The installation of stabilizing piles does not influence the pore water pressure change, but induces less subsidence rate. In addition, the depth of excavation has a significant effect on the back ground and it was evaluated that the maximum subsidence occurs as it is closer to the excavation point.

Shear Strength Characteristics of Unconsolidated-Undrained Reinforced Decomposed Granite Soil under Monotonic and Cyclic Loading (정.동적 하중에 의한 비압밀비배수 보강화강풍화토의 전단강도 특성)

  • Cho, Yong-Sung;Koo, Ho-Bon;Park, Inn-Joon;Kim, You-Seong
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.7
    • /
    • pp.13-21
    • /
    • 2006
  • When enforced earth is used for the retain wall and four walls, the most important thing would be how to maximize the land utilization. Accordingly, in case of enforced earth, we pile up the minimal height of earth ($20{\sim}50\;cm$) and harden the earth using a static dynamic hardening machine. In this paper, we tried to analyze and compare the stress transformation characteristics of reinforced weathered granite soil with geosynthetics when repetitive load is added to the enforced earth structure and when static load is added. The result is that the cohesion component of the strength increased greatly and the friction component decreased slightly.

The Deformation Behavior of Anchored Retention Walls in Cut Slope (절개사면에 설치된 앵커지지 흙막이벽의 변형거동)

  • Song Young-Suk;Lee Jae-Ho;Kim Tae-Hyung
    • The Journal of Engineering Geology
    • /
    • v.15 no.2 s.42
    • /
    • pp.155-168
    • /
    • 2005
  • The behavior of earth retention wall installed in a cut slope is different from the behavior of retention wall applied in an urban excavation. In order to establish the design method of anchored retention wall in the cut slope, the behavior of anchored retention wall needs to be investigated and checked in detail. In this study, the behavior of anchored retention wall was investigated by the instrumentation installed in the cut slope, where was stabilized by a row of piles in an apartment construction site. The horizontal displacement of anchored retention wall was larger than the displacement of slope soil behind the wall at the early stage of excavation. As the excavation depth became deeper, the horizontal displacement of slope soil was larger than the displacement of anchored retention wall. It means that the horizontal displacement of anchored retention wall due to excavation is restrained by soldier pile stiffness and jacking force of anchor at the early stage of excavation. lacking force of anchor was mainly influenced on the horizontal displacement of anchored retention wall. The displacements of anchored retention wall and slope soil were affected mainly by rainfall infiltrated from the ground surface. Meanwhile, the horizontal displacement of anchored retention wall with a sloped backside was about $2\~6$ times larger than the displacement of anchored retention wall with a horizontal backside of excavation.

The characteristics of capital city plan of the BianLieng palace, the Dongjing Walled Town (東京城), the Northern song Dynasty (북송 동경 변량성의 조영과 특징)

  • Dashu, Qin
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.3
    • /
    • pp.114-159
    • /
    • 2012
  • The Northern Song Dynasty Period (北宋時代) was a drastic transitional era in all aspect of Chinese society including the politico-economic system, ideology and cultural trait. These changes that began in the late Tang (唐) Dynasty Period accomplished in the Northern Song Dynasty. In this phase, the fundamental change influenced in all institutional area; and among them, the capital city planning and its associating building technology to pile stone walls shows one of the significant change of those time. Based on the geographical factor, confluences of many rivers, the Kaifeing (開封) area where the BianLieng palace had developed as a political and economical centre since the Tang Dynasty when the Grand Canal was constructed. According to archaeological researches, the central city structure of Dongjing Walled Town was begun to plan in the late Tang Dynasty and formed in Five Dynasties. The fundamental functional change of city completed in the Midnorthern Song Dynasty. In spite of the relatively late beginning of archaeological investigations to Kaifeng Walled Town and Dongjing Walled Town due to unfavourable natural environment, excavations inaugurated since 1981 have achieved the significant investigations including the actual measurement and excavation to the outer wall, the preliminary excavation to the inner city area, the investigation and excavation to the royal palace of Song and the survey to the royal palace of King Zho in the Ming (明) Dynasty. These surveys have provide important data to reconstruct the 변량 palace, and elucidate the characteristics of city plan in the Dongjing Walled Town and the institutional change of capital city plan of the Northern Song Dynasty. The basic layout of Dongjing Walled Town reflect the realisation of ideality of the late Chinese medieval capital city structure that establish the commercial and economic centre based on the intensification of emperor's power by means of the organisation of ethical institution and the development of commercial economy. Firstly, the central place of the Kaifeng area is encircled with triple walls. This emphasise the authority of emperor located on the summit in the hierarchical ethic system succeeding to the main capital city plan of the late phase of ancient China. Secondly, the location of Dongjing Walled Town was decided by the transport network and the commercial function and defence function. Thirdly, this site shows the change of city structure and landscape of the Northern Song Dynasty. The closed Fengri (坊里: block) system transferred the open Jiexiang (街巷: road) system. Fourthly, the capital city was characterised by the free market trade and the diversification of market place. Fifthly, a convenient transport network in the Bian River, a centre of the Grand Canals, enabled to construct the Kaifeng Walled Town. Therefore, the Northern Song Dynasty continuously accomplished the developed water system as concerning about the utilisation of waterways after the construction of city.

A Study on the Structure and the owners of the Royal Tombs of the Goryeo Dynasty (고려왕릉의 구조 및 능주(陵主) 검토)

  • Lee, Sang June
    • Korean Journal of Heritage: History & Science
    • /
    • v.45 no.2
    • /
    • pp.4-19
    • /
    • 2012
  • There remain many royal tombs of the Goryeo Dynasty in Gaeseong and Ganghwa. During the Goryeo Dynasty, these royal tombs were taken over tradition of tomb construction style from previous generation, and they completed their own inventive style. Furthermore they handed down those style to the Joseon Dynasty. The area of tomb was divided into 3 or 4 steps, and stone figures and T-shaped houses for sacrifice were arranged on each steps. It was the stone chamber of lateral opening style which had an entrance to southward, and it was formed as a rectangular box-shaped with a pile of stone walls and a flat ceiling. There was a coffin stand in the middle of floor, and traditional bricks were around them. The wall side and ceiling had been whitewashed and painted pictures. These are general characteristics for the tomb construction style of the Goryeo Dynasty. By the way, we can notice a number of features except those general things with inspection in detail. In early days, we confirmed 1step-parallel fulcrum ceiling, coffin stand of all in one stone, bier of burial artifact, and mural of plant material as a set, but they were changed as flat ceiling, Red-stone wall with rectangular stone, coffin stand set as stone pillar through the period of transitional form as of in the late 12th century. In case of several royal tombs, the fragments of king's epitaph which were confirmed from tombs could be defined owners clearly, and there were considerable timing difference between the large numbers of celadons which were excavated with the fragments of king's epitaph and recording chronologically of stone chamber structure. The reason for timing difference is that posterity artifacts were buried through repairing courses by occasion of destruction caused by robbing of the royal tombs. Meanwhile I inferred the existing hypothesis about owners of royal tombs and autonym ones in comparison the burial spot direction of hypothesis ones and outcomes of excavation. Therethrough, some hypothesis about owners of royal tombs such as Myung-neung which was assumed as tomb of the King Choongmok were not correct.