• Title/Summary/Keyword: pier

Search Result 887, Processing Time 0.03 seconds

Performance assessment of precast concrete pier cap system

  • Kim, T.H.;Kim, Y.J.;Shin, H.M.
    • Computers and Concrete
    • /
    • v.13 no.4
    • /
    • pp.501-516
    • /
    • 2014
  • The purpose of this study was to investigate the performance of precast concrete pier cap system. The proposed precast pier cap provides an alternative to current cast-in-place systems, particularly for projects in which a reduced construction time is desired. Five large-scale pier cap specimens were constructed and tested under quasistatic monotonic loading. The computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology) was used for the analysis of reinforced concrete structures. A bonded tendon element is used based on the finite element method, and can represent the interaction between the tendon and concrete of a prestressed concrete member. A joint element is used in order to predict the inelastic behaviors of segmental joints with a shear key. This study documents the testing of the precast concrete pier cap system under monotonic loading and presents conclusions and design recommendations based on the experimental and analytical findings. Additional full-scale experimental research is needed to refine and confirm design details, especially for actual detailing employed in the field.

Effect Analysis according to the Reduction of Traffic when General Pier and Jasungdae Pier are Re-developed - Focused on the Social Cost Analysis - (일반부두와 자성대부두의 재개발에 따른 통행량감소 효과분석 - 사회적 비용 분석을 중심으로 -)

  • Song, Yong-Seok;Kang, Dal-Won;Nam, Ki-Chan;Hur, Yun-Su
    • Journal of Navigation and Port Research
    • /
    • v.30 no.10 s.116
    • /
    • pp.819-823
    • /
    • 2006
  • Since the north port in Busan started to operate in general pier (1, 2, central, 3 and 4), the business area had been expanded to Jasungdae, Shinsundae, Gamman zone and so on However, these zones adjoin the Busan city and have caused problems to both logistics and city activities. The operation of Off-Dock Container Yard (ODCY) is a representative example due to the limited sphere of Container Yard in this city. It increases logistics costs and causes serious social problems as a result of increasing traffic in the trunk roads such as Uam and Chungjang roads. This paper aims to analyze the effects of the reduction in traffic of trunk roads in Chungjan, Uam roads and so on, when General Pier and Jasungdae Pier are Re-developed. The effects of the reduction in social cost from traffic congestion are also analyzed. Finally, we predict and evaluate the effects according to the re-development of two piers, north pier and Jasungdae pier.

Study on the Sediment and Velocity Characteristics around Bridge Based on Shape of the Piers (교각의 기하학적 형상에 따른 유사 및 유속의 변화 특성)

  • Ahn, Seung-Seop;Lee, Hyo-Jung;Seo, Myung-Joon;Lee, Jeung-Seok
    • Journal of Environmental Science International
    • /
    • v.18 no.2
    • /
    • pp.221-230
    • /
    • 2009
  • In this study, a river basin with a lot of measured data such as water level, flow rate, current speed, and sediment rate from the past to now was selected and geometrical shape of a pier was re-analyzed, in order to study the effects of the flow around the pier area as well as the riverbed alternation characteristics. A finite element mesh of the entire river was prepared, and via parameter revision, the section that the pier has influence on was decided, to analyze the shape of the pier using RMA-2 and SED2D-WES models. With regards to the section that the pier has influence on, analysis was done on the four pier shapes, namely circle, square, rectangle, and octagon. The results showed that the shape with the least influence around the pier around is the octagon, followed by circle, rectangle, and square, showing the different geometrical effects that the shapes have on the pier. Furthermore, it was shown that the distribution of sediment concentration had effect from about (+) 110 m of the upstream to about (-) 130 m of the downstream, from the pier installation point. Also, it was shown after analyzing drag forces for different sediment particle distributions that the shape with the greatest drag is the octagon, followed by circle, square, and rectangle.

Effect Analysis according to the Reduction of Traffic when General Pier and Jasungdae Pier are Re-developed -Focused on the Social Cost Analysis- (일반부두 및 자성대부두 재개발시 통행량 감소에 따른 효과 분석 -사회적 비용분석을 중심으로-)

  • Song, Yong-Seok;Kang, Dal-Won;Nam, Ki-Chan;Hur, Yun-Su
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.275-279
    • /
    • 2006
  • Since the North port in Busan started to operate in general pier (1, 2, central, 3 and 4), the business area had been expanded to Jasungdae, Shinsundae, Gamman zone and so on. However, these zones adjoin the Busan city and have caused problems to both logistics and city activities. The operation of Off-Dock Container Yard (ODCY) is a good representative example due to the limited sphere of Container Yard in this city. It increases logistics costs and causes serious social problems as a result of increasing traffic in the truck roads such as Uam and Chungjang roads. This paper aims to analyze the effects of the reduction in traffic of trunk roads in Chungjan, Uam roads and so on, when General Pier and Jasungdae Pier are Re-developed. The effects of the reduction in social cost from traffic congestion are also analyzed. Finally, we predict and evaluate the effects according to the re-development of two piers, north pier and Jasungdae pier.

  • PDF

Seismic responses of composite bridge piers with CFT columns embedded inside

  • Qiu, Wenliang;Jiang, Meng;Pan, Shengshan;Zhang, Zhe
    • Steel and Composite Structures
    • /
    • v.15 no.3
    • /
    • pp.343-355
    • /
    • 2013
  • Shear failure and core concrete crushing at plastic hinge region are the two main failure modes of bridge piers, which can make repair impossible and cause the collapse of bridge. To avoid the two types of failure of pier, a composite pier was proposed, which was formed by embedding high strength concrete filled steel tubular (CFT) column in reinforced concrete (RC) pier. Through cyclic loading tests, the seismic performances of the composite pier were studied. The experimental results show that the CFT column embedded in composite pier can increase the flexural strength, displacement ductility and energy dissipation capacity, and decrease the residual displacement after undergoing large deformation. The analytical analysis is performed to simulate the hysteretic behavior of the composite pier subjected to cyclic loading, and the numerical results agree well with the experimental results. Using the analytical model and time-history analysis method, seismic responses of a continuous girder bridge using composite piers is investigated, and the results show that the bridge using composite piers can resist much stronger earthquake than the bridge using RC piers.

Behaviors of Internally Confined Hollow Reinforced Concrete Piers by Thickness of Internal Steel Tube (내부 강관 두께에 따른 내부 구속 중공 RC 교각의 거동)

  • Choi, Jun-Ho;Han, Taek-Hee;Yi, Gyu-Sei;Yoon, Ki-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.2
    • /
    • pp.333-338
    • /
    • 2007
  • An infernally confined hollow reinforced concrete pier (ICH RC pier) is hollow RC pier which has a internal steel tube to enhance its ductility and stiffness by internal confinement. In this study, the internal steel tube were changed to investigate the behavior of ICH RC pier. The behavior of internally confined hollow reinforced concrete piers were evaluated with safety ratio, ductility, total material cost, the total weight of the pier, etc. As a result of analytical study, the usage of a minimum necessary thickness of the internal steel tube the most effective. The ICH RC pier has decrease of weight compare to Solid RC pier.

  • PDF

Seismic performance and design of bridge piers with rocking isolation

  • Chen, Xingchong;Xia, Xiushen;Zhang, Xiyin;Gao, Jianqiang
    • Structural Engineering and Mechanics
    • /
    • v.73 no.4
    • /
    • pp.447-454
    • /
    • 2020
  • Seismic isolation technology has a wide application to protect bridges from earthquake damage, a new designed bridge pier with seismic isolation are provided for railways in seismic regions of China. The pier with rocking isolation is a self-centering system under small and moderate earthquakes, and the unbonded prestressed tendons are used to prevent overturning under strong earthquakes. A numerical model based on pseudo-static testing results is presented to evaluate the seismic performance of isolation bridge piers, and is validated by the shaking table test. It is found that the rocking response and the loss of prestressing for the bridge pier increase with the increase of earthquake intensity. Besides, the intensity and spectral characteristics of input ground motion have great influence on displacement of the top and bottom of the bridge pier, while have less influence on the bending moment of the pier bottom. Experimental and numerical results show that the rocking-isolated piers presented in this study have good seismic performance, and it provides an alternative way for the railway bridge in the regions with high occurrence of earthquakes. Therefore, we provide the detailed procedures for seismic design of the rocking-isolated bridge pier, and a case study of the seismic isolation design with rocking piers is carried out to popularize the seismic isolation methods.

Vibration analysis of train-bridge system with a damaged pier by flotilla collision and running safety of high-speed train

  • Xia, Chaoyi;Wang, Kunpeng;Huang, Jiacheng;Xia, He;Qi, Lin;Wu, Xuan
    • Structural Engineering and Mechanics
    • /
    • v.81 no.1
    • /
    • pp.69-79
    • /
    • 2022
  • The dynamic responses of a pier-pile-soil system subjected to a barge/flotilla collision are analyzed. A coupled high-speed train and bridge system with a damaged pier after barge/flotilla collision is established by taking the additional unevenness of the track induced by the damaged pier as the self-excitation of the system. The whole process of a CRH2 high-speed train running on the 6×32 m simply-supported PC (prestressed concrete) box-girder bridge with a damaged pier is simulated as a case study. The results show that the lateral displacements and accelerations of the bridge with a damaged pier are much greater than the ones before the collision. The running safety indices of the train increase with the train speed as well as with the number of barges in the flotilla. In flotilla collision, the lateral wheel/rail forces of the train exceed the allowable values at a certain speed, which influences the running safety of the trains.

Mapped relationships between pier settlement and rail deformation of bridges with CRTS III SBT

  • Jiang, Lizhong;Liu, Lili;Zhou, Wangbao;Liu, Xiang;Liu, Chao;Xiang, Ping
    • Steel and Composite Structures
    • /
    • v.36 no.4
    • /
    • pp.481-492
    • /
    • 2020
  • To study the rail mapped deformation caused by the pier settlement of simply - supported bridges with China Railway Track System III (CRTS III) slab ballastless track (SBT) system under the mode of non-longitudinal connection ballastless track slab, this study derived an analytical solution to the mapped relationships between pier settlement and rail deformation based on the interlayer interaction mechanism of rail-pier and principle of stationary potential energy. The analytical calculation results were compared with the numerical results obtained by ANSYS finite element calculation, thus verifying the accuracy of analytical method. A parameter analysis was conducted on the key factors in rail mapped deformation such as pier settlement, fastener stiffness, and self-compacting concrete (SCC) stiffness of filling layer. The results indicate that rail deformation is approximately proportional to pier settlement. The smaller the fastener stiffness, the smoother the rail deformation curve and the longer the rail deformation area is. With the increase in the stiffness of SCC filling layer, the maximum positive deformation of rail gradually decreases, and the maximum negative deformation gradually increases. The deformation of rail caused by the pier settlement of common-span bridge structures will generate low-frequency excitation on high-speed trains.

Test for the influence of socket connection structure on the seismic performance of RC prefabricated bridge piers

  • Yan Han;Shicong Ding;Yuxiang Qin;Shilong Zhang
    • Earthquakes and Structures
    • /
    • v.25 no.2
    • /
    • pp.89-97
    • /
    • 2023
  • In order to obtain the impact of socket connection interface forms and socket gap sizes on the seismic performance of reinforced concrete (RC) socket prefabricated bridge piers, quasi-static tests for three socket prefabricated piers with different column-foundation connection interface forms and reserved socket gap sizes, as well as to the corresponding cast-in-situ reinforced concrete piers, were carried out. The influence of socket connection structure on various seismic performance indexes of socket prefabricated piers was studied by comparing and analyzing the hysteresis curve and skeleton curve obtained through the experiment. Results showed that the ultimate failure mode of the socket prefabricated pier with circumferential corrugated treatment at the connection interface was the closest to that of the monolithic pier, the maximum bearing capacity was slightly less than that of the cast-in-situ pier but larger than that of the socket pier with roughened connection interface, and the displacement ductility and accumulated energy consumption capacity were smaller than those of socket piers with roughened connection interface. The connection interface treatment form had less influence on the residual deformation of socket prefabricated bridge piers. With the increase in the reserved socket gap size between the precast pier column and the precast foundation, the bearing capacity of the prefabricated socket bridge pier component, as well as the ductility and residual displacement of the component, would be reduced and had unfavorable effect on the energy dissipation property of the bridge pier component.