• 제목/요약/키워드: permissible

검색결과 691건 처리시간 0.025초

건설기계 소음표시의무제도 연구 (A Study on Noise Marking Obligation System for Construction Equipments)

  • 이성호;박인선;장서일;오진우;권태우;박상규
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2004년도 춘계학술대회논문집
    • /
    • pp.554-558
    • /
    • 2004
  • With the improvement of living quality, people's desire for quiet living environment keeps increasing. In particular, complaints about the noise emission by constrcution equipments around residential areas take most part of the noise related complaints. In this study, noise marking obligation system for the high noise construction equipment have been proposed to reduce the noise level and protect the well-being of citizens. For this purpose, construction equipment used in the country were surveyed and compared with that of the European Directive/2000/14/EC. As results, 20 kinds of construction equipment were proposed for the obligated noise marking, while 13 kinds of construction equipment were proposed for the equipment subject to permissible noise level, thus the obligated noise marking and certification.

  • PDF

교각 세굴방지를 위한 섬유돌망태의 적용성 (Application of Fiber Stone for Bridge Pier Scour Protection)

  • 김성원
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2011년도 학술발표회
    • /
    • pp.337-340
    • /
    • 2011
  • In this study, qualitative and quantitative evaluations are performed using the hydraulic analysis of fiber stone for bridge pier scour protection. We can consider that the effective scour protection should be suggested from the side of hydraulic stability, structure stability, and permissible tractive force. The perfect verification, however, on the fiber stone for bridge pier scour protection is not sufficient because of short literatures and experiments on the field study. The continuous research, therefore, will be needed to establish reliable verification using literatures investigation and the various experiments on the fiber stone for bridge pier scour protection.

  • PDF

ACSR-OC 전선의 단시간 특성 평가 (Assessment of Short-Time Characteristic ACSR-OC Conductor)

  • 이중관;김동명;이수묵
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 C
    • /
    • pp.1446-1448
    • /
    • 2002
  • The short-time permissible temperature of an overhead distribution line conductor is determined by the softening characteristics of ACSR-OC, ACSR AW/OC 160, typical conductors employed in the overhead distribution line. Transient heat transfer equation and Newton's cooling law were applied to analyze the heating and cooling effects of the insulating conductors, respectively, and the error of co-relation was calibrated after simulating the softening test to assess the short-time characteristic of the insulating conductor. In order to verify the softening characteristic, the conductors were tested with heat cycle. The test was totally carried out 200 cycles, and 1 cycle was to heat and cool at 1.1 times permissible current of the conductor, 1.15 times for 120 minutes, respectively. After heating, the tensile strength and surface of the conductor were observed. In case of ACSR-OC, as the result of 100 hour heating test, the tensile strength of the insulator was 0.8 times the initial value. This is equivalent to the value of the conductors which are used for 10 years at sites.

  • PDF

중금속이 수생히야신스(부레옥잠)를 이용한 하수처리 공정에 미치는 영향 (Effects of Heavy Metals on the Beware Treatment Process by Water Hyacinth)

  • 정재욱;유홍일;유재근
    • 환경위생공학
    • /
    • 제9권2호
    • /
    • pp.110-119
    • /
    • 1994
  • The objective of the this study was to evaluate the effects of heavy metals on the sewage treatment process designed to remove organic material and nutrients using Water- hyacinth ( Eichhornia crassipes ). Batch experiments were carried out using domestic sewage spiked with different level of heavy metal mixtures ( Cd, Pb and Cu ). The specific growth rates of Water- hyacinth ranged from 0.0008 to 0.0015 1/day( operated at water temperatures of 22 ∼30$\circ $c ) and increased as the concentration of heavy metals decreased. The test result showed that the permissible maximum concentrations Cd, Pb and Cu for the growth of Water- hyacinth were 0.5, 1, and 6 mg/ℓ respectively. Under these maximum permissible heavy metal loads, removal rate of organic material, nitrogen and phosphorus were 85%,75% and 75% , respectively, during 40days of the test period.

  • PDF

강성회전체의 평형특성 요구조건 - 허용 잔류불평형량의 결정 (ISO 1940-1) (ISO/TC/108/SCl 1940-1(Mechanical vibration - Balance quality requirements of rigid rotors- Determination of permissible residual unbalance))

  • 최상규;전오성
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2002년도 춘계학술대회논문집
    • /
    • pp.889-898
    • /
    • 2002
  • This part of ISO 1940 gives recommendations for determining unbalance and for specifying related quality requirements of rigid rotors; it specifies a) a representation of unbalance in one or two planes; b) methods for determining permissible residual unbalance; c) methods for allocating it to the correction planes; d) methods for identifying he residual unbalance state of a rotor by measurement; e) a summary of errors associated with the residual unbalance identification. This part of ISO 1940 is also intended to facilitate the relations between manufacturer and user of machines. Detailed consideration of errors associated with the determination of residual unbalance is covered in the 2nd part of ISO 1940 (ISO 1940-2 will deal with these errors).

  • PDF

웨이브렛 변환을 이용한 저주파에서 짧은 잔향 시간을 갖는 실음향에서의 잔향시간 측정에 관한 연구 (Measurement of Short Reverberation Times of an Acoustic Room at Low Frequencies Using Wavelet Transform)

  • 이상권
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2002년도 춘계학술대회논문집
    • /
    • pp.1077-1080
    • /
    • 2002
  • In building acoustics, reverberation time is an important acoustic parameter. However, it is often difficult to measure short reverberation times at low frequencies using the traditional band pass filter bank if the product of bandwidth (B) and reverberation time (T) is small. It is well known that the minimum permissible product of bandwidth and reverberation time of the traditional band pass filter is at least 16 [F. Jacobsen, J. Sound Vib. 115, 163-170 (1987)]. This strict requirement makes it difficult to measure short reverberation times of an acoustic room at low frequencies exactly. In order to reduce this strict requirement, recently, the wavelet filter bank is developed and the minimum permissible product of bandwidth and reverberation time is replaced with 4 [S. K. Lee, J, Sound Vib. 252, 141-153 (2002)]. In the present paper, it is demonstrated how the short reverberation times at low frequencies are successfully measured by using the wavelet filter bank. In order to present this job, two synthetic signals and one measured signal are used for impulse responses of an acoustic room.

  • PDF

관로 부설 송전 케이블의 허용전류 계산 프로그램 개발 (Development of the Permissible Current-Carrying Capability Calculation Program of Transmission Power Cables Installed in Ducts)

  • 정성환;김대경;최상봉;이동일;강지원;곽방명;탁의균;윤형희;김재승;박준호;김형수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.340-342
    • /
    • 2001
  • This paper introduces the program of calculating the permissible current-carrying capability of underground power cables. Its program is developed the KEPCO's standard based on IEC 287.

  • PDF

지중 송배전 전력케이블 병행구간에 대한 허용전류 계산 (A Study on the Analysis of an Permissible Current-Carrying Capability of Transmission and Distribution Power Cables Buried in Ducts)

  • 정성환;김대경;최상봉;이동일;강지원;김형수;박준호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.263-265
    • /
    • 2001
  • This paper proposes an analysis of an permissible current-carrying capability of being installed transsmission power cables and distribution power cables simultaneously.

  • PDF

배전계통에서의 분산전원 도입운용 관리방법 : LDC 운전을 하지 않을 경우 (A Control Method of Distributed Generation System Which is Connected to Power Distribution System : Without LDC Operation)

  • 정원재;김태응;김재언
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.231-233
    • /
    • 2001
  • Nowadays, small scale DGS(Distributed Generation System), as a wind power generation or photovoltaic generation, becomes to be introduced into the power distribution system. But in that case, it is difficult to properly maintain the terminal voltage of low voltage customers. So, it is necessary to determine the permissible operation limit of the introduced DGS for proper voltage in distribution system. In this paper computes permissible operation limit of DGS when the DGS is connected to power distribution system using fixed tap(without LDC operation). For this simulation, KEPCO distribution system is used.

  • PDF