• 제목/요약/키워드: peak power management

검색결과 170건 처리시간 0.018초

회생에너지를 이용한 도시철도 전력관리시스템 구축에 관한 연구 (Study for Power Management System using Regenerative Energy in Electric Railway Systems)

  • 이한상;조윤성;김형철;정호성
    • 전기학회논문지
    • /
    • 제63권1호
    • /
    • pp.191-196
    • /
    • 2014
  • For the large scale of electricity consumer, since the price for the electricity consumption depends on the peak power, the issue for peak power reduction have been being studied widely. Electric railway systems, which is one of the most representative large scale of loads, also has assignment to reduce the peak power since they have high peak power and low energy consumption load characteristics. In the aspect of the economic operation through reduction of peak power, this paper proposes a novel algorithm for power management system in electric railway systems using energy storage.

지그비 무선 통신기반의 피크전력 제어장치 개발 (Development of a Peak Power Control System based on Zigbee Wireless Communication)

  • 안서길;임익초;김성호;육의수
    • 제어로봇시스템학회논문지
    • /
    • 제21권5호
    • /
    • pp.442-446
    • /
    • 2015
  • As electricity consumption is increasing rapidly these days, an urgent. need exists to minimize consumption through smart and intelligent ways in order to prevent a future energy crisis. For this purpose, development of an intelligent peak power management system should be required. As the number of appliances and consumer electrical devices increase, power consumption in unit business tends to grow. Generally, electricity consumption can be minimized using a peak power management system capable of. effectively controlling the load power by continuously monitoring the power. In this work, a peak power management system which consists of arduino microprocessor equipped with ethernet and Zigbee shield is presented. To verify the feasibility of the proposed scheme, laboratory-scale experiments are carried out.

에어컨부하 직접제어시스템 실증시험 및 운용방안에 관한 연구 (The Study on the Field test and Operational Method of a Direct Load Control System for Air conditioner)

  • 강원구;김충환;김명수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 D
    • /
    • pp.2825-2827
    • /
    • 2000
  • In electric power industry. load balance has been one of the most fundamental and important management goals. Therefore. the strategy to achieve high quality load management now includes load balance besides the stabilization of electricity supply and quality management of electricity. Amongst many techniques of load management. direct load management has been actively studied and utilized to increase power facility and peak load suppression. Higher peak load situation is appeared during summer than during winter in Korea. and approximately 20% of the peak load is due to the load for air-conditioning. To cope with this peak load problem during summer KEPCO is performing a research project to develop a system to remotely control air-conditioning load using wireless communication. Currently, applicable facilities are limited to small-scale air-conditioning facility that has less than 2KW power capacity. This paper described the 1st year of efforts made in the study.

  • PDF

원격제어 에어컨 개발 보급현황 및 향후전망 (A development of direct load control system for air-conditioner)

  • 강원구;김충환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 D
    • /
    • pp.2446-2448
    • /
    • 2001
  • In addition to the stabilization of electricity supply and the quality management of electricity, load balance has been an important strategy for achieving high quality load management. Among many techniques for load management, direct load management has been actively studied and applied for increasing the efficiency of power facility and suppressing peak load. In Korea, the highest peak load is demanded in summer rather than in winter, and almost 50% of the peak load comes from cooling load. Currently, applicable systems are limited to air conditioners that have the cooling capacity less than 2kW. This paper describes the development of remote controlled air conditioners and the result of the field test of the new type air conditioner. The technical specification based on the test will be applied to the new model of the remote controlled air conditioner. The wide distribution of the air conditioners to the public will be helpful to control peak demand due to cooling load in summer time. Financial investment to generating, transmission, distribution facilities will be decreased from flatting the seasonal power load.

  • PDF

RPSMDSM: Residential Power Scheduling and Modelling for Demand Side Management

  • Ahmed, Sheeraz;Raza, Ali;Shafique, Shahryar;Ahmad, Mukhtar;Khan, Muhammad Yousaf Ali;Nawaz, Asif;Tariq, Rohi
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제14권6호
    • /
    • pp.2398-2421
    • /
    • 2020
  • In third world countries like Pakistan, the production of electricity has been quickly reduced in past years due to rely on the fossil fuel. According to a survey conducted in 2017, the overall electrical energy capacity was 22,797MW, since the electrical grids have gone too old, therefore the efficiency of grids, goes down to nearly 17000MW. Significant addition of fossil fuel, hydro and nuclear is 64.2%, 29% and 5.8% respectively in the total electricity production in Pakistan. In 2018, the demand crossed 20,223MW, compared to peak generation of 15,400 to 15,700MW as by the Ministry of Water and Power. Country faces a deficit of almost 4000MW to 5000MW for the duration of 2019 hot summer term. Focus on one aspect considering Demand Side Management (DSM) cannot oversea the reduction of gap between power demand and customer supply, which eventually leads to the issue of load shedding. Hence, a scheduling scheme is proposed in this paper called RPSMDSM that is based on selection of those appliances that need to be only Turned-On, on priority during peak hours consuming minimum energy. The Home Energy Management (HEM) system is integrated between consumer and utility and bidirectional flow is presented in the scheme. During peak hours of electricity, the RPSMDSM is capable to persuade less power consumption and accomplish productivity in load management. Simulations show that RPSMDSM scheme helps in scheduling the electricity loads from peak price to off-peak price hours. As a result, minimization in electricity cost as well as (Peak-to-Average Ratio) PAR are accomplished with sensible waiting time.

Peak부하(負荷) 억제(抑制)를 위한 전력부하관리(電力負荷管理) (전력부하(電力負荷) 직접제어방식(直接制御方式)) (POWER LOAD MANAGEMENT FOR PEAK LOAD CLIPPING (POWER LOAD DIRECT CONTROL METHOD))

  • 김영한;이효상;김재영
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1989년도 하계종합학술대회 논문집
    • /
    • pp.246-250
    • /
    • 1989
  • Owing to the rapid development of economy and the higher living standard of people, electricity demands have growth and the peak load has been increased rapidly. To cope with this impacts and to reduce the cost of service,utilities are conserned about power load management program. This paper shows a scheme of power load control and the basic structure of direct load control system. And also radio control method using the public pager which is one of the best economical and serviceable method in techniques will be introduced briefly.

  • PDF

심야전력을 이용한 에너지 저장 및 부하율 향상에 대한 연구 (Development of an Electrical Load Management System)

  • 박석인;정봉만;한수빈;정학근;김규덕;유승원
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1999년도 전력전자학술대회 논문집
    • /
    • pp.226-229
    • /
    • 1999
  • The recent problems such as the rapid increase o electricity consumption, the large variation of electrical loads, and the sitting difficulty for new power plants could become a barrier to stable electrical power supply. Consequently, an electrical load management technology has become important, by which an electricity can be stored during off-peak time and efficiently used during peak time. The technology provides a variety of direct or indirect benefits which include, for utilities, reduction of new power plants, economical electricity production, and improved efficiency and reliability of power system and for consumers, low prices o electricity. The study is to develop a proto-type load management system and its application technology for a peak shaving. In the system, conventional batteries are used as energy storage device.

  • PDF

Group Building Based Power Consumption Scheduling for the Electricity Cost Minimization with Peak Load Reduction

  • Oh, Eunsung;Park, Jong-Bae;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권6호
    • /
    • pp.1843-1850
    • /
    • 2014
  • In this paper, we investigate a group building based power consumption scheduling to minimize the electricity cost. We consider the demand shift to reduce the peak load and suggest the compensation function reflecting the relationship between the change of the building demand and the occupants' comfort. Using that, the electricity cost minimization problem satisfied the convexity is formulated, and the optimal power consumption scheduling algorithm is proposed based on the iterative method. Extensive simulations show that the proposed algorithm achieves the group management gain compared to the individual building operation by increasing the degree of freedom for the operation.

전력계통 Peak-Shaving 성능향상을 위한 1일 부하곡선 생성 (Generation of Daily Load Curves for Performance Improvement of Power System Peak-Shaving)

  • 손수빈;송화창
    • 한국지능시스템학회논문지
    • /
    • 제24권2호
    • /
    • pp.141-146
    • /
    • 2014
  • 본 논문은 Peak Shaving 알고리즘의 성능 향상을 위한 예측 부하 곡선의 생성의 한 방법을 제시한다. 여기서 논하는 Peak Shaving 알고리즘은 대용량의 배터리 에너지 저장시스템 (BESS, Battery Energy Storage System)을 위한 PMS (Power Management System)의 장주기 스케쥴링 알고리즘을 의미한다. 위의 PMS는 주로 배터리에서 에너지의 입출력을 제어하는 데에 주목적이 있다. 이를 위해서 Peak Shaving 알고리즘이 사용되는데, 여기서 예측 부하곡선과 실제 부하곡선 사이의 불확실성이 나타난다. 원활한 에너지의 충,방전을 위하여 본 논문에서는 주 단위의 표준화 방법과 계절별 부하의 특성을 고려한 예측 부하 곡선 생성 방법을 제안한다.

Optimal unidirectional grid tied hybrid power system for peak demand management

  • Vineetha, C.P.;Babu, C.A.
    • Advances in Energy Research
    • /
    • 제4권1호
    • /
    • pp.47-68
    • /
    • 2016
  • A well designed hybrid power system (HPS) can deliver electrical energy in a cost effective way. In this paper, model for HPS consisting of photo voltaic (PV) module and wind mill as renewable energy sources (RES) and solar lead acid battery as storage device connected to unidirectional grid is developed for peak demand reduction. Life time energy cost of the system is evaluated. One year hourly site condition and load pattern are taken into account for analysing the HPS. The optimal HPS is determined for least life time energy cost subject to the constraints like state of charge of the battery bank, dump load, renewable energy (RE) generation etc. Optimal solutions are also found out individually for PV module and wind mill. These three systems are compared to find out the most feasible combination. The results show that the HPS can deliver energy in an acceptable cost with reduced peak consumption from the grid. The proposed optimization algorithm is suitable for determining optimal HPS for desired location and load with least energy cost.