• Title/Summary/Keyword: peak flood discharge

Search Result 157, Processing Time 0.023 seconds

Runoff Estimation for Small Watershed by Interactive Program (Interactive program에 의한 소유역의 유출량 산정)

  • 안상진;김종섭
    • Water for future
    • /
    • v.25 no.4
    • /
    • pp.97-107
    • /
    • 1992
  • The purpose of this study is to estimate the flood hydrograph and runoff at ungaged small watershed by using interactive program with geomorphologic and climatic data obtained from the topographic maps following the law of stream classification and ordering by Horton and Strahler. The present model is modified from Allam's interactive program which derives the geomorphologic instantaneous unit hydrograph(GIUH). This program uses the results of Laplace transformation and convolution integral of probability density function in travel time at each station, This program is used to estimate the time to peak, the flood discharge and the direct runoff at San seong station in Bocheong Stream.

  • PDF

Determination of Flood Hydrograph by Remote Sensing Techniques in a Small Watershed (원격탐사 기법에 의한 소유역의 홍수 수문곡선 결정)

  • 남현옥;박경윤;조성익
    • Korean Journal of Remote Sensing
    • /
    • v.5 no.1
    • /
    • pp.13-27
    • /
    • 1989
  • In recent years satellite data have been increasingly used for the analysis of floodprone areas. This study was carried out to demonstrate the usefulness of repetitive satellite imagery in monitoring flood levels of the Pyungchang watershed. Runoff characteristics parameters were analyzed by Soil Conservation Service(SCS) Runoff Curve Number(RCN) based on Landsat imagery and Digital Terrain Model data. The RCN average within the watershed was calculated from RCN estimates for all the pixels(picture elements) and adjusted by antecedent precipitation conditions. The direct runoff hydrograph was derived from the unit hydrograph using SCS dimensionless unit hydrograph and effective rainfalls estimated by the SCS method. In comparsion of the direct runoff hydrograph with the measured rating curve their peak times differ by one hour and peak discharges differ by 5.9 percents of the discharge from each other. It was shown that repetitive satellite image could be very useful in timely estimating watershed runoffs and evaluating ever-changing surface conditions of a river basin.

Impact of Parameters of Nonlinear Breach Progression Curve on Outflow Rate (저수지 붕괴함수의 매개변수 결정이 유량과 침수범위에 미치는 영향)

  • Lee, Khil-Ha
    • Journal of Environmental Science International
    • /
    • v.28 no.2
    • /
    • pp.211-217
    • /
    • 2019
  • A Numerical modeling approach is usually applied to reproduce the physical phenomena of a fill dam-break. The accuracy of the dam-break model depends on the physical structure that defines input variables such as the storage volume, breach formation and progress, and the parameters of the model, which are subjective as they are prescribed by users. In this study, a sensitivity analysis was performed for the nonlinear breach progression curve that was already developed, which includes four parameters. The study focuses on the two of the parameters which control the breach forming time and peak discharge. The model is coupled with a two-dimensional flood simulation model (FLO-2D) to examine flood coverage and depth. It is generally observed that the parameter ${\beta}$ controls only the breach forming time, the parameter ${\gamma}$ is particularly sensitive to the peak flow.

A Study on Channel Flood Routing Using Nonlinear Regression Equation for the Travel Time (비선형 유하시간 곡선식을 이용한 하도 홍수추적에 관한 연구)

  • Kim, Sang Ho;Lee, Chang Hee
    • Journal of Wetlands Research
    • /
    • v.18 no.2
    • /
    • pp.148-153
    • /
    • 2016
  • Hydraulic and hydrological flood routing methods are commonly used to analyze temporal and spatial flood influences of flood wave through a river reach. Hydrological flood routing method has relatively more simple and reasonable performance accuracy compared to the hydraulic method. Storage constant used in Muskingum method widely applied in hydrological flood routing is very similar to the travel time. Focusing on this point, in this study, we estimate the travel time from HEC-RAS results to estimate storage constant, and develop a non-linear regression equation for the travel time using reach length, channel slope, and discharge. The estimated flow by Muskingum model with storage constant of nonlinear equation is compared with the flow calculated by applying the HEC-RAS 1-D unsteady flow simulation. In addition, this study examines the effect on the weighting factor changes and interval reach divisions; peak discharge increases with the bigger weighting factor, and RMSE decreases with the fragmented division.

Flood Runoff Simulation Using Physical Based Distributed Model for Imjin-River Basin (물리적기반의 분포형모형을 활용한 임진강유역 홍수유출모의)

  • Park, Jin-Hyeog;Hur, Young-Teck
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.1
    • /
    • pp.51-60
    • /
    • 2009
  • 2/3 of the Imjin River Basin area is located in North Korea, so it was hard to acquire reliable rainfall and hydrological information. This point is one of the factors that has added to flood damage. In this study, flood runoff for the river basin was simulated using hydrological radar, which is installed in an effort to reduce flood damage in the Imjin River Basin, which habitually suffers from flood damage. The feasibility of the distributed flood model was reviewed for the river basin, which is lacking in hydrological data such as rainfall and recent soil data. Based on the hydrograph, observed value was not consistent partially because of insufficient data, but peak discharge and the overall pattern showed relatively precise runoff results which can be applied in actual work.

A Study on the Outlet Drain Discharge from Paddy Field (논의 배수물꼬의 유량에 관한 기초연구)

  • 최진규;김현영;손재권
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.39 no.2
    • /
    • pp.134-142
    • /
    • 1997
  • This study was performed to evaluate the drain runoff characteristics from one paddy field, and to provide the basic data required for the determination of flood discharge and unit drainage water for drainage improvement and farmland consolidation. For this purpose, under the assumption that drain discharge from paddy field was similar to outflow of reservoir, runoff model based on storage equation was applied to the experimental field, and simulated results were compared to the measured discharge at weir point. To estimate effective storage volume of paddy field with water depth, 4 regression formula were examined such as linear, exponential, power, and combined. From the observed runoff characteristics, it was shown to be 3.3~16.3${\ell}$/sec in weir discharge, 57.2~98% in runoff ratio, and relative error of simulated result was 3.0~39.4%, 8.5 ~56.0 % for peak flow and runoff ratio, respectively. Curve number by SCS method was calculated as mean value of 96.4 using measured rainfall and runoff data, it was considered relatively high because paddy field has generally flooding depth contrary to the upland watershed area.

  • PDF

Assessment of Human Impact on Mekong River Flood by Using Satellite Nightlight Image

  • Try, Sophal;Lee, Giha;Lee, Daeeop;Thuy, HoangThu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.187-187
    • /
    • 2016
  • High intensity of population distribution in deltaic setting especially in Asia tends to have increased and causes coastal flood risk due to lower elevations and significant subsidence. Maximum or peak discharge of flood always causes numerous deaths and huge economic losses. New technology of spatial satellite image has been applied to analyze flood damage. In this research, the relationship of nightlight intensity associated with flood damages has been determined during 1992-2013 with spatial resolution of 30 arc sec ($0.0083^{\circ}$) which is nearly one kilometer at the equator in whole six countries along the Mekong River (i.e., China, Myanmar, Lao PDR, Thailand, Cambodia and Vietnam). ArcGIS Hydrological Flow Length Tool has been used to determine the distance of each pixel areas from the rivers and streams. Statistical analysis results highlight the significant correlation R = 0.47 between nightlight digital number and economic damages per unit area (US$/km2) and R = 0.62 for number of affected people for unit area ($people/km^2$). The areas near by the Mekong River and its tributaries correspond to high flood damage. This spatial analysis result is going to be prestigious key information to the regions and all related stakeholders for decisions and mitigation strategies.

  • PDF

Development of Reservoir Operation Model using Simulation Technique in Flood Season (I) (모의기법에 의한 홍수기 저수지 운영 모형 개발 (I))

  • Sin, Yong-No;Maeng, Seung-Jin;Go, Ik-Hwan;Lee, Hwan-Gi
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.745-755
    • /
    • 2000
  • The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.

  • PDF

A Study of Flood Runoff Variation by Travel Times Estimation Methods (도달시간 산정방법에 따른 홍수유출특성 변화에 관한 연구)

  • Park, Ki-Bum;Ko, Jin-Seuk;Jee, Hong-Gee
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.1
    • /
    • pp.34-45
    • /
    • 2006
  • In this study comparison estimates travel times with observed travel time. In generally, peak flood discharges decrease become travel times longer. It is closely related to storage constant for the watershed routing of a flood. There are so many empirical formulas available for the estimation of travel time, storage coefficients and lag time but results computed generally show great different depending on individual formulas. When calculated flood discharge depend on the travel times varying the discharge. In this study the Wichun travel time shorter optimization travel time than observed travel time for the rusa and memi. There are showed good results for flood discharges, water level and velocity of the memi at the Younggok.

  • PDF

Discharge Equation Related to a Levee-Break for a Flood Hazard Map (홍수위험지도 작성을 위한 하천 제방 붕괴 유량공식 제안)

  • Lee, Khil-Ha;Kim, Sung-Wook;Choi, Bong-Hyuck
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.623-627
    • /
    • 2015
  • To compile a flood hazard map it is essential to identify the potential risk areas. A scenario-based numerical modeling approach is commonly used to build a flood hazard map in the case of a levee-break. The model parameters that capture peak discharge, including breach formation and progress, are important in the modeling method. In this study an earth-levee-break model is constructed under the assumption that the failure mechanism and hydraulic processes are identical for all levee-break river activities. Estimation of the hydrograph at the outlet as a function of time is highlighted. The constructed hydrograph can then serve as an upper boundary condition in running the flood routing model downstream, although flood routing is not considered in this study.