• Title/Summary/Keyword: peak discharge

Search Result 624, Processing Time 0.025 seconds

Estimation of Design Flood Considering Time Distribution of Rainfall (강우 시간분포를 고려한 설계홍수량산정)

  • Park, Jae-Hyun;Ahn, Sang-Jin;Hahm, Chang-Hahk;Choi, Min-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1191-1195
    • /
    • 2006
  • Now days, heavy storm occur to be continue. It is hard to use before frequency based on flood discharge for decision that design water pocket structure. We need to estimation of frequency based on flood discharge on the important basin likely city or basin that damage caused by flood recurrence. In this paper flood discharge calculated by Clark watershed method and SCS synthetic unit hydrograph method about upside during each minute of among time distribution method of rainfall, Huff method choosing Bocheong Stream basin that is representative basin of International Hydrologic Project (IHP) about time distribution of rainfall that exert big effect at flood discharge estimate to research target basin because of and the result is as following. Relation between probability flood discharge that is calculated through frequency analysis about flood discharge data and rainfall - runoff that is calculated through outward flow model was assumed about $48.1{\sim}95.9%$ in the case of $55.8{\sim}104.0%$, SCS synthetic unit hydrograph method in case of Clark watershed method, and Clark watershed method has big value overly in case of than SCS synthetic unit hydrograph method in case of basin that see, but branch of except appeared little more similarly with frequency flood discharge that calculate using survey data. In the case of Critical duration, could know that change is big area of basin is decrescent. When decide time distribution type of rainfall, apply upside during most Huff 1-ST because heavy rain phenomenon of upsides appears by the most things during result 1-ST about observation recording of target area about Huff method to be method to use most in business, but maximum value of peak flood discharge appeared on Huff 3-RD too in the case of upside, SCS synthetic unit hydrograph method during Huff 3-RD incidental of this research and case of Clark watershed method. That is, in the case of Huff method, latitude is decide that it is decision method of reasonable design floods that calculate applying during all $1-ST{\sim}4-TH$.

  • PDF

Estimation of Runoff Depth and Peak Discharge by SCS Curve Numbers and Time Variation of curve Numbers (SCS곡선번호에 의한 유출고 및 첨두유량의 산정과 곡선번호의 시변성)

  • 윤태훈
    • Water for future
    • /
    • v.25 no.4
    • /
    • pp.87-95
    • /
    • 1992
  • The validity of the estimate of runoff depth and peak runoff by the basin runoff curve numbers(CN-II for AMC-II condition and CN-III for AMC-III condition) obtained from hydrologic soil-cover complexs is investigated by making use of the observed curve numbers(median curve number and optimum curve number) computed from rainfall-runoff records. For gaged basins the median curve numbers are recommended for the estimation of runoff depth and peak runoff. For ungaged basins, found is that for the estimate of runoff depth CN-III is adequate and for the peak runoff CN-II is adequate. Also investigated is the variation of curve numbers during rainfall, which is turned out to improve the estimates of both depth and peak of runoff.

  • PDF

Study on Analysis for Power Consumption and Charge/Discharge Effect with BESS in AC High-Speed Electric Railway System (교류 고속철도계통에서 BESS의 도입을 위한 전력소비 및 충·방전효과 분석에 관한 연구)

  • Jeon, Yong-Joo;Kang, Byoung-Wook;Chai, Hui-Seok;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.20-27
    • /
    • 2014
  • The power consumption pattern of high-speed railway has rarely during night time. But, during service time, the power is consumed irregularly related to train operation. Especially certain unusual about 1-2 days of service time interval to indicate the power consumption is rapidly growing phenomenon, which causes the capacity of the power contract is the annual electricity bill to rise rapidly as the cause. Normally, amount of peak power consumption bill rate at railway substation is over 20% of total electrical bill. Therefore, high-speed railway substation is expected to be considerably larger savings by reducing the peak power of the default charge(demand power).

Seasonal Variation of Phytoplankton Biomass in the Very Low Salinity Region of the James River Estuary, Virginia, U. S. A. (James 강 하구 저염분 지역에서의 식물 부유생물 현존량의 계절적 변화)

  • MOON Chang Ho
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.22 no.6
    • /
    • pp.397-407
    • /
    • 1990
  • Surface phytoplankton biomass was measured at approxinately one month intervals from July 1986 to August 1987. There was a peak phytoplankton biomass in the very low salinity region during summer and autumn when river discharge was low. The peak biomass occurred independent of the tidal state, location of nutrient input, nutrient concentration and temperature. The peak biomass are probably caused by the hydrodynamic trapping, density-seletive retention of particles by esturarine circulation.

  • PDF

Small Watershed Peak Flow Prediction

  • Jun, Byong-Ho;Oh, Kyoung-Doo;Park, Young-Ha
    • Korean Journal of Hydrosciences
    • /
    • v.2
    • /
    • pp.1-12
    • /
    • 1991
  • To estimate the peak discharge from the small rural watersheds, 53 storm events of seven small watersheds from 1972 to 1989 were selected and were analyzed by the multiple regression technique. The peak values by the new prediction method developed in this study were also compared to the real data of Banwol Basins and the estimated peaks of the several watersheds which were analyzed by the Korean engineering companies. These values were also compared to the results from the other method, i.e. the Rational Method, the Kajiyama Method, the Nakayasu Unit Hydrograph companies. Through Method, the Area Routing Method, etc., which are favored by the Korean engineering companies. Through these comparisons, it is proved that the proposed method may be used for day-to-day use without any problem. However, there should be some modifications and improvements as more data are available in the future.

  • PDF

Comparison and analysis of peak flow by Areal Reduction Factor (면적감소계수에 따른 첨두유량의 비교연구)

  • Baek, Hyo-Sun;Lee, De-Young;Kang, Young-Buk;Choi, Han-Kuy
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1798-1802
    • /
    • 2007
  • The practice of business estimate flood discharge by rainfall-flow relation that is easy collection of observation data. The important factor is rainfall, coefficient of runoff, and drainage area for analysis of runoff-flow relation.The practice of business usually use probability rainfall that use a weighted average value after each observation post estimate probability of non-same time. It has more error than same time probability rainfall, and it can excess of estimation because it can't consider space distribution of rainfall.The study of result showed similar aspect with existing ARF but width of coefficient become smaller. And the comparison of peak flow did not different what used by ARF and same time probability rainfall(A group). But non-same time probability rainfall is bigger 25% more than another(B group). Between A group and B group of the difference increased with the lapse of time.

  • PDF

Comparison and analysis of peak flow by Areal Reduction Factor (면적감소계수에 따른 첨두유량의 비교 분석)

  • Lee, Dae-Young;Choi, Han-Kuy
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.95-102
    • /
    • 2007
  • The practice of business estimate flood discharge by rainfall-flow relation that is easy collection of observation data. The important factor is rainfall, coefficient of runoff, and drainage area for analysis of runoff-flow relation. The practice of business usually use probability rainfall that use a weighted average value after each observation post estimate probability of non-same time. It has more error than same time probability rainfall, and it can excess of estimation because it can't consider space distribution of rainfall. The study of result showed similar aspect with existing ARF but width of coefficient become smaller. And the comparison of peak flow did not different what used by ARF and same time probability rainfall(A group). But non-same time probability rainfall is bigger 25% more than another(B group). Between A group and B group of the difference increased with the lapse of time.

  • PDF

Slotted type copper ion laser (Slot형 구리 이온 레이저)

  • 송순달;홍남관
    • Korean Journal of Optics and Photonics
    • /
    • v.8 no.4
    • /
    • pp.291-296
    • /
    • 1997
  • The slotted type of hollow copper cathode was constructed and tested for its geometric stability and usability for laser operation at 780nm. The peak output power of copper ion laser emission was measured for different operating conditions. The IR-laser power was dependent on the parameters of the geometry of the hollow cathodes, discharge current and gas fillings. The peak power decreased with increasing neon pressure over 60%. One reason for this decrease in output power may be conjectured as hier due to the decreasing population of the upper laser level. The copper ion laser transition at 780 nm populated at the 5p level. The hollow cathode copper ion laser is operated in He and Ne mixture by electric discharge excitation and could be operated for more than 100 hours with only a 35% drop in the output power(2.8mW cw for 9.6cm active length).

  • PDF

A Study on ESS Optimal Operation Strategy Using Two Stage Hybrid Optimization (Two Stage Hybrid Optimization을 사용한 ESS 최적 운전 전략에 대한 연구)

  • Gong, Eun-Kyoung;Sohn, Jin-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.7
    • /
    • pp.833-839
    • /
    • 2018
  • This paper presents an analysis and the methodology of optimal operation strategy of the ESS(Energy Storage System) for reduce electricity charges. Electricity charges consist of a basic charge based on the contract capacity and energy charge according to the power usage. In order to use electrical energy at minimal charge, these two factors are required to be reduced at the same time. QP(Quadratic Programming) is appropriate for minimization of the basic charge and LP(Linear Programmin) is adequate to minimize the energy charge. However, the integer variable have to be introduced for modelling of different charge and discharge efficiency of ESS PCS(Power Conversion System), where MILP(Mixed Integer Linear Programming) can be used. In this case, the extent to which the peak load savings is accomplished should be assumed before the energy charge is minimized. So, to minimize the electricity charge exactly, optimization is sequentially performed in this paper, so-called the Two Stage Hybird optimization, where the extent to which the peak load savings is firstly accomplished through optimization of basic charge and then the optimization of energy charge is performed with different charge and discharge efficiency of ESS PCS. Finally, the proposed method is analyzed quantitatively with other optimization methods.

An Analysis of Flood Mitigation Effect Applying to LID in Mokgamcheon Watershed using SWMM Model (SWMM 모형을 이용한 목감천 유역의 LID 시설 적용 홍수저감효과 분석)

  • Jang, Yeongsun;Mun, Sungho;Yang, Sunglin
    • International Journal of Highway Engineering
    • /
    • v.15 no.3
    • /
    • pp.75-83
    • /
    • 2013
  • PURPOSES: In this study, flood mitigation effect of drainage asphalt concrete pavement were analyzed by a SWMM 5.0 program in order to evaluate the low impact development (LID) based on the drainage asphalt concrete pavements. METHODS: In order to determine the porosity parameters of drainage asphalt concretes, the specimen mixtures were manufactured using the conditions presented in the previous study. The numerical simulation was conducted using the SWMM 5.0 program considering the flood mitigation effect of drainage asphalt concrete pavements. The effect of flood reduction can be observed when drainage asphalt concrete pavements were applied to Mokgamcheon watershed. The flood mitigation effect analysis of Mokgamcheon watershed as well as continuous simulation of subwatershed runoff were performed through this study. RESULTS : The analysis of drainage asphalt concrete pavements was carried out for evaluating the effect on runoff, resulting in: the peak flow decreases up to 1.26~9.53% after drainage asphalt concrete pavements applied in the SWMM 5.0 program furthermore, the discharge decreases up to 0.55~4.11%. CONCLUSIONS: As a result, the reduced peak flow and discharge were found through the SWMM 5.0 program. It can be concluded that the flood is effectively reduced when the drainage asphalt concrete pavements are used.