• 제목/요약/키워드: payback

검색결과 176건 처리시간 0.029초

그린홈사업을 위한 신재생에너지 기술의 경제적 타당성 평가 (Economic Feasibiltiy Analysis of Renewable Energy of Green Home Policy)

  • 안형준;허은녕
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2009년도 춘계학술대회 논문집
    • /
    • pp.196-199
    • /
    • 2009
  • Korean government decided to give a subsidy for renewable energy system of green home. This policy will make an appeal to consumers. But For success of this policy, Economic benefit of consumer is essential. In this study, benefit and cost is seperated to consumer part and government part, respectively. consumer's benefit is energy saving and asset value increment. Consumer's cost is real input money except government's subsidy. Government's benefit is consist of energy import reduction, carbon discharge reduction and new production increment, As a result, the government subsidy will not so enough to activate the green home. PV system for the korean general apartment has the payback period of 19 years. So, For the dissemination of renewable energy of green home, more strong subsidy policy and more economic technoloy development is requested.

  • PDF

An Economic Feasibility Analysis of the HAPS Services in Korea

  • 안재경;김종화;이덕두;안도섭;구본준
    • 위성통신과 우주산업
    • /
    • 제13권1호통권28호
    • /
    • pp.118-124
    • /
    • 2006
  • HAPS(High Altitude Platform Station) which is defined as a station located on an object at an altitude of 20 to 50 km and at a specified, nominal, fixed point relative to the earth is promising technology capable of providing broadband multimedia services. In this study, economical aspects of HAPS service are analyzed by estimating the revenue and costs incurred by the service. To evaluate the profitability of HAPS service, the number of subscribers is estimated and then the net present value (NPV), payback period, and the rate of return on investment (ROI) are calculated under various scenarios

  • PDF

불확실한 탐험을 촉진하는 방법 : 사례연구 (Promoting Uncertain Exploration : A Case Study)

  • 하성욱
    • 지식경영연구
    • /
    • 제10권1호
    • /
    • pp.53-70
    • /
    • 2009
  • This study empirically explored what promotes exploration, through a case analysis of a Korean SME (small and medium sized enterprise), based on the research framework which focuses on the identification and the selection of exploratory NPD (new product development) alternatives, and the accumulation of novel capabilities in new technology domains. The learning process of the exploratory NPD project described is as follows. The identification barrier of exploratory NPD project is relatively low. Constructive crisis is germane to selecting exploratory NPD alternatives and to enduring the long payback period. New separated R&D unit is likely to implement the exploratory NPD project. The length of the gestation period of the exploratory NPD project is related with the level of the conflict between old members and new members. This study identified several antecedents of the exploratory NPD project. Prior success promotes the identification process of the exploratory NPD projects. Constructive crisis is related with CEO's personal characteristics such as future oriented and proactive personality. The proactive involvement and persuasion of CEO are germane to reducing the conflict between old and new members and to the success of the exploratory NPD project. Based on the results, this study discusses several implications and future research directions.

  • PDF

목재산업용(木材産業用) 태양열(太陽熱) 건조장치(乾燥裝置)의 개발(開發)과 경제성분석(經濟性分析)에 관한 연구(硏究) (Study on The Development and Economic Evaluation of Solar Drying System for Wood Industry)

  • 이형우
    • Journal of the Korean Wood Science and Technology
    • /
    • 제20권1호
    • /
    • pp.5-14
    • /
    • 1992
  • Experimental external collector type solar lumber dryer of $1m^3$ of maximum capacity with $1.6m^3$ of collector area was designed and constructed. The seasonal performance of solar dryer, including air-conditions, energy efficiency, and drying characteristics of 3cm-thick red pine and douglas-fir lumber was investigated. Also, the economic analysis was carried out. Annual average solar drying rate was about 2 times faster than air-drying rate with no significant difference in the amount of drying defects. But in initial drying stage air-drying rate in winter was much faster and those in spring and autumn were slightly slower than solar drying rate in each season. Annual average energy efficiency of solar-dryer and-collector was 25% and 57%, respectively. Fuel savings were over 50% at 15% of energy inflation rate and the payback period was estimated as 6.10 years at 30% of energy inflation rate.

  • PDF

시범 새우양식장의 경제적 타당성 연구 (Economic Feasibility of a Hypothetical Shrimp Farm a Combination of Semi-Closed Raceways and Ponds)

  • 이재후
    • 수산경영론집
    • /
    • 제13권1호
    • /
    • pp.85-97
    • /
    • 1982
  • This study involves a blending of intensive and extensive shrimp culture techniques for a hypothetical shrimp farm which uses a combination of heated raceway nurseries and extensive grow-out ponds per year. The present value method of economic analysis is used to determine economic feasibility. The biological data in this reports were obtained from published or personal communications from leaders in the field of shrimp aquaculture. The proposed system showed economic feasibility using the present value method with discount rates of 10% and 12%. The most profitable scenario, the culture of three crops of Penaeus vannamei showed a 1.26 year payback period and 120% annual average rate of return. The breakeven price was $1.25/1b., which is $1.52 less than the market price of $2.77. Breakeven production was 724 1bs/acre, which is 8761bs. less than the assumed 1,600 1bs/acre. All other scenarios 1.2 and 3 crops for P. stylirostris and P. setiferus showed economic feasibility also.

  • PDF

농업인후계자 육성사업의 개선방안에 관한 연구 (A Study on the Development Directions for Upbringing Young Success Farmers)

  • 양승춘;김진화;최창욱
    • 농촌지도와개발
    • /
    • 제5권2호
    • /
    • pp.133-142
    • /
    • 1998
  • The purpose of this study was to investigate development derections for upbringing young success farmers. The study was carried out through literature review and questionnarie survey. Total of 400 young success farmers were surveyed to collect data, and 394 responded. For deveolpment directions of upbringing young success farmers, this study suggests; 1) to increase investment of agricultural management and marketing, 2) to postpone the time to payback and to lower the loan rates, 3) to enlarge consulting service in agricultural extension organizations.

  • PDF

하수열원을 이용한 지역난방 적용성 검토 (A Study on the Application of District Heating System using Sewage Source)

  • 김상훈;김동진;최동규
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.928-933
    • /
    • 2009
  • The purpose of this study is to examine the energy consumption, carbon dioxide emission & energy cost of district heating using sewage source. The annual TOE of heat pump using sewage source save 37.1 percent than city gas boiler. And annual carbon dioxide emission of heat pump cut down 41.3 percent than city gas boiler. If it charges the rate schedule for district heating to apartment resident, collected amount are 3,127,170 thousand won. As energy cost of heat pump & circulation pump are 1,378,072 thousand won. the profits are 1,749,098 thousand won. As payback period is 8.97years, applicability is low level. However, it has advantages in energy consumption, carbon dioxide emission & energy cost. Therefore, it needs to proceed through government assistance.

  • PDF

소수력발전소의 건설 타당성분석 기법 (Methodology of Feasibility Assessment for Small Hydropower Plant)

  • 박완순;이철형;정상만
    • 태양에너지
    • /
    • 제18권3호
    • /
    • pp.153-160
    • /
    • 1998
  • The methodology and feasibility analysis model for small hydropower plant has been studied and developed. It consists of two main part, the performance prediction model to estimate the performance characteristics and economics anaysis model to evaluate economical characteristics for surveyed sites. The performance characteristics and feasibility assessment for surveyed sites were analyzed, using developed models. Also, primary design specifications such as design flowrate, capacity, load factor were estimated and discussed for surveyed sites in Dan-yang and feasibility was suggested through analyzing the investment, unit cost and payback period.

  • PDF

농업용 보를 이용한 소수력발전소의 타당성 분석 (Feasibility Assessment of Small Hydro Power Plants Using Diversion Weirs for Agricultural Purpose)

  • 이철형;박완순
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2011년도 춘계학술발표대회 논문집
    • /
    • pp.229-234
    • /
    • 2011
  • Feasibility assessment for small hydropower plants using diversion weirs located in stream for agricultural purpose has been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the inflow caused from rainfall. And another model to predict hydrologic performance for small hydropower plants is established. Preliminary survey was performed identifying several candidate sites, and two sites were selected finally for actual site reconnaissance. During the course of site survey, generating capacity, construction and equipment cost, and payback through life time of each sites were calculated for economical feasibility analysis. The results of this study have estimated that the small hydropower plants using diversion weirs for agricultural purpose may offer better opportunities in future with increasing fuel cost and nation's energy policy.

  • PDF

제주시 폐기물환경사업소의 미활용에너지 활용방안 연구 (A Study on Unused Energy Management of Jeju City Waste Environment Center)

  • 김상혁;권기린;박윤철
    • 동력기계공학회지
    • /
    • 제8권1호
    • /
    • pp.48-54
    • /
    • 2004
  • In this study, waste heat of Jeju City Waste Environment Center is investigated and the utilization method is suggested with economical analysis of additional investment that needed for new facility. Energy balance of the typical facilities is considered in this study such as incineration plant and LFG power plant. The payback period of the investment which is used for the LFG power plant waste heat utilization facility is about 2.4 years and the economic profit of the facility during 10 years operation is up to 926 million won.

  • PDF