• Title/Summary/Keyword: pavement repair

Search Result 73, Processing Time 0.018 seconds

Concept Development of Eco-friendly Pavement Cutting Machine through Overseas Technology Analysis (해외기술 분석을 통한 친환경 도로포장 절단기 개념 도출)

  • Kim, Kyoon-Tai;Jun, Young-Hum;Kim, Kyong-Hoon;Ok, Chi-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.242-243
    • /
    • 2019
  • In recent years, road cutting work has been frequently performed for the repair of old road pavement and the development of underground space. However, the existing pavement cutting machine in Korea generates a lot of noise and dust. In this study, it was found out that the pavement cutting machine that cuts off noise and sucks cutting dust is used in overseas. Therefore, in this study, the concept of eco - friendly pavement cutter suitable for domestic situation is derived. The results will be used in prototype modeling and experimentation.

  • PDF

Evaluation of Emergency Pothole Repair Materials using Polyurethane-Modified Asphalt Binder (폴리우레탄 개질 아스팔트 바인더를 사용한 포트홀 응급 보수재의 성능평가)

  • Kim, Yeong Min;Im, Jeong Hyuk;Hwang, Sung Do
    • International Journal of Highway Engineering
    • /
    • v.17 no.1
    • /
    • pp.43-49
    • /
    • 2015
  • PURPOSES : The objective of this study is to develop new pothole repair materials using polyurethane-modified asphalt binder, and to evaluate them relative to current pothole repair materials in order to improve the performance of repaired asphalt pavement. METHODS : In the laboratory, polyurethane-modified asphalt binder is developed, and then asphalt binder is added to produce pothole repair materials. In order to evaluate the properties of this new pothole repair material, both an indirect tension strength test and a direct tension strength test are performed to measure the material strength and bond strength, respectively. Additionally, the basic material properties are evaluated using the asphalt cold mix manual. The strength characteristics based on curing times are evaluated using a total of 7 types of materials (3 types of current materials, 2 types of new materials, and 2 types of moisture conditioned new materials). The indirect tension strength tests are conducted at 1, 2, 4, 8, 16, and 32 days of curing time. The bond strength between current HMA(Hot Mix Asphalt) and the new materials is evaluated by the direct tension strength test. RESULTS AND CONCLUSIONS : Overall, the new materials show better properties than current materials. Based on the test results, the new materials demonstrate less susceptibility to moisture, faster curing times, and an improved bond strength between HMA and the new materials. Therefore, the use of the new materials reported in this study may lead to enhanced performance of repairs made to asphalt pavement potholes.

Methodology of Field Investigation and Laboratory Test for Distresses of Old Concrete Pavements (노후 콘크리트 포장 파손에 대한 현장조사 및 실내시험 방법)

  • Lee, Ki Sang;Lee, Jun Hyeok;Kang, Min Soo;Cho, Nam Hyun;Jeong, Jin Hoon
    • International Journal of Highway Engineering
    • /
    • v.18 no.5
    • /
    • pp.21-29
    • /
    • 2016
  • PURPOSES : The purpose of this study is to suggest a specific investigation guideline to decide priority of repairing old concrete pavements that pile up substantially. METHODS : In this study, a principle of division of homogeneous sections was proposed to reflect the characteristics of the pavement reasonably in the specific investigation results. In addition, a checklist and guideline of field investigation were suggested for the old concrete pavement sections, which require inspection toward their durability and structural performance. Furthermore, the items of laboratory test necessary to the old concrete pavement were suggested based on the existing laboratory test considering characteristics of the old concrete pavement. The present condition of the old concrete pavement could be analyzed by the test results. RESULTS : A method of division of homogeneous sections suitable for the specific investigation of the old concrete pavement was suggested. The proportions of distress severity of pavement sections were compared by distress type to figure out the present state of the old concrete pavement. Scaling, durability cracking (or alkali-silica reaction), and longitudinal spalling were selected as the most severe distress types. The detailed positions of the sections were also suggested. The checklist of the specific investigation was categorized by field survey and laboratory test, and its evaluation criteria were proposed. The three types of the sections of durability cracking (or alkali-silica reaction), bridge connection, and asphalt overlay were selected as the sections of the field survey. The compressive strength, void structure, and chloride penetration depth were suggested as the items of the laboratory test. CONCLUSIONS : A fundamental level of the guideline was suggested in this study to resolve the problem of old concrete pavement. Appropriate guidelines related to the repair of the old concrete pavement should be provided by performing additional research efforts.

A Study on Economic Feasibility of Highway Maintenance Considering Carbon Amount by Using KPRP (Korea Pavement Research Program) (탄소량을 고려한 도로 유지보수 경제성에 관한 연구: KPRP (Korea Pavement Research Program) 활용)

  • Nguyen, Dinh Thanh;Choi, Jae-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.879-890
    • /
    • 2017
  • The US Pavement Design method (AASHTO) and HDM-4, a road pavement maintenance decision system, are not suitable for domestic pavement design, construction and maintenance. KPRP(Korea Pavement Research Program) has been developed to reflect Korea's environmental conditions and vehicle characteristics, thereby, extending pavement life. The main objective of this study is to select the best alternative through Life Cycle Cost $CO_2$ (LCCC) calculations among three representative maintenance strategies using KPRP design software since the environment cost resulting from the extended pavement life will also differ. The analysis of this study illustrates that cumulative carbon emissions for 40 years in alternative 2 (Cutting and Overlaying at Year 30) is the lowest option among them, and the basic cost of $CO_2$ emission by various road maintenance and repair work can be used for suggesting an optimal maintenance strategy for highway agency.

Behavior and Resistance to the Reflection Crack of Composite Pavement with Waterproof Membrane (접착식 방수층을 적용한 합성단면포장의 반사균열 저항특성 분석 연구)

  • Suh, Young-Chan;Lee, Yong-Mun;Kim, Jun-Hyung;Cho, Nam-Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.1-10
    • /
    • 2012
  • As old concrete pavements of over 20years in age are increasing in expressways, the repair and rehabilitation of concrete pavement have become an important issue. Although asphalt overlay is widely used as an alternative to rehabilitate the old concrete pavement, problems due to infiltrated water such as reflection crack and pothole are imposing a very serious threat to its performance. This study proposes waterproof membrane as a solution to minimize the damage due to reflection crack and infiltrated water, and accelerated pavement testing was carried out for the performance comparison of composite pavement with waterproof membrane and ordinary tack coating. The experiment used water spraying to simulate rainfall, and the behavior and moisture resistance characteristics of overlay pavement were analyzed. The experimental result indicated that the strain pattern of waterproof membrane section differed from ordinary tack coating section because waterproof membrane caused the asphalt pavement and concrete pavement to move together. Additionally, since waterproof membrane minimized the infiltration of water and delayed the occurrence of reflection crack by about 70% in comparison to ordinary tack coating method. Moreover, the damage due to infiltrated water also decreased.

Evaluation of Early age Performance of Geogrid-reinforced Asphalt Pavements (섬유그리드 보강 아스팔트 포장 초기 공용성 평가)

  • Yeo, Hyun-Dong;Kim, Gwang-Duk;Kwon, Soo-Ahn;Jeong, Jin-Hoon
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.53-60
    • /
    • 2010
  • Geogrid-reinforced asphalt pavement is a pavement type applicable to overlay for repair in addition to new construction. The geosynthetic materials are placed between the asphalt layers to stop or delay propagation of the cracking existing at lower layers and to reduce the rutting. In this study, the cracking, rutting, IRI, and deflection were investigated to compare the performance between geogrid-reinforced asphalt pavement and ordinary or polymer modified asphalt pavement. Based on field conditions, the 11 sections were classified into 3 groups; sections proper to compare, sections with restrictions to compare, sections with difficulties in comparing, and the data was statistically analyzed. Larger resistance to rutting and increased IRI were measured at the geogrid-reinforced asphalt pavement sections comparing to the ordinary or polymer modified asphalt pavement sections. However, the deflections of the pavements were similar and the resistance to the cracking could not be compared because of short pavement lives.

Thin Bonded Concrete Overlay for Concrete Pavement Rehabilitation (콘크리트포장의 박층 콘크리트 덧씌우기공법)

  • 윤경구;이형준;엄주용;서영찬
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.635-642
    • /
    • 1997
  • This research focused on the development of concrete overlay and test, which was conducted at 88 Highway 105k, 2 lanes of 290 m. The field application test consists of 6 cm and 10 cm bonded concrete overlay and 25 cm unbonded concrete overlay, using the slag cement for opening lanes for traffic early. The overlay were placed in a day. The whole period of traffic closing wes 8 day and it was reopened to traffic after concrete overlay has cured for 3 day. 5 cracks were founded when the field test section was investigated after 1 month, but all these may not make significant problems to overlay because these initiated and growed at the same line of repair section. The rideability and skid resistance become much better like in the new pavement after overlay. The structural capacity against deflection was much. which were verified by FWD(Falling Weight Deflectometer). The field test section is being used in a good condition and the results of field application and pavement performance analysis are encouraging. This rehabilitation methods may be adopted in Korea after a more field performance verifications.

  • PDF

Analysis of Pavement Cutting Work for High Performance and Eco-friendly Equipment Development (고성능・친환경 장비 개발을 위한 도로포장 절단 작업 분석)

  • Kim, Kyoon-Tai;Jun, Young-Hum;Kim, Kyong-Hoon;Ok, Chi-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.122-123
    • /
    • 2019
  • Recently, road cutting works are frequently performed to repair aging underground utilities. However, the conventional road pavement cutting equipment in Korea generates a lot of noise and dust, and the development of high performance and eco-friendly equipment is required. This study classifies road cutting work and analyzes its work characteristics before improving road cutting machine. The classification and analysis results of this study will be used for the future productivity analysis and evaluation of road cutter developed.

  • PDF

Fundamental Study of Alkali Activated Cement Mortar for Evaluating Applicability of Partial-Depth Repair (도로포장 보수재 활용 가능성 평가를 위한 알칼리 활성 시멘트 모르타르 기초연구)

  • Jeon, Sung Il;An, Ji Hwan;Kwon, Soo Ahn;Yun, Kyung Ku
    • International Journal of Highway Engineering
    • /
    • v.15 no.3
    • /
    • pp.1-8
    • /
    • 2013
  • PURPOSES : This study is to evaluate the feasibility of using the alkali activated cement concrete for application of partial-depth repair in pavement. METHODS : This study analyzes the compressive strength of alkali activated cement mortar based on the changes in the amount/type/composition of binder(portland cement, fly ash, slag) and activator(NaOH, $Na_2SiO_3$, $Na_2CO_3$, $Na_2SO_4$). The mixture design is divided in case I of adding one kind-activator and case II of adding two kind-activators. RESULTS : The results of case I show that $Na_2SO_4$ based mixture has superior the long-term strength when compared to other mixtures, and that $Na_2CO_3$ based mixture has superior the early strength when compared to other mixtures. But the mixtures of case I is difficult to apply in the material for early-opening-to-traffic, because the strength of all mixtures isn't meet the criterion of traffic-opening. The results of case II show that NaOH-$Na_2SiO_3$ based mixtures has superior the early/long-term strength when compared to NaOH-$Na_2SiO_3$ based mixtures. In particular, the NaOH-$Na_2SiO_3$ based some mixtures turned out to pass the reference strength(1-day) of 21MPa as required for traffic-opening. CONCLUSIONS : With these results, it could be concluded that NaOH-$Na_2SiO_3$ based mixtures can be used as the material of pavement repair.