• Title/Summary/Keyword: parallel construction

Search Result 431, Processing Time 0.039 seconds

An Efficient Parallel Construction Scheme of An R-Tree using Hadoop (Hadoop을 이용한 R-트리의 효율적인 병렬 구축 기법)

  • Cong, Viet-Ngu Huynh;Kim, Jongmin;Kwon, Oh-Heum;Song, Ha-Joo
    • Journal of Korea Multimedia Society
    • /
    • v.22 no.2
    • /
    • pp.231-241
    • /
    • 2019
  • Bulk-loading an R-tree can be a good approach to build an efficient one. However, it takes a lot of time to bulk-load an R-tree for huge amount of data. In this paper, we propose a parallel R-tree construction scheme based on a Hadoop framework. The proposed scheme divides the data set into a number of partitions for which local R-trees are built in parallel via Map-Reduce operations. Then the local R-trees are merged into an global R-tree that covers the whole data set. While generating the partitions, it considers the spatial distribution of the data into account so that each partition has nearly equal amounts of data. Therefore, the proposed scheme gives an efficient index structure while reducing the construction time. Experimental tests show that the proposed scheme builds an R-tree more efficiently than the existing approaches.

A Study of Voltage Control for Lower Side Parallel Transformer (병렬운전 변압기 전압제어 및 저압축 모선보호방식연구)

  • Yun, Gi-Seob;Baek, Seung-Do;Choi, Hyuck-Jong
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.233-236
    • /
    • 2001
  • Parallel operation scheme to several transformers is adopted because of the load increase, economic problem, or load shedding. For the transformer's parallel operation, loads proportional to each transformer's capacity must be allotted, and circulation currents must be limited as much as without causing any problem in a real operation. But, both transformers in parallel operation can be tripped when either faults at lower voltage side of a transformer or faults in a bus occurs. Therefore, parallel operation scheme to distribution transformers in Korea is not adopted in a normal state but only when loaded or load-shedded. These are due to the insufficiency of the construction in communication network and AVR scheme. Besides that, those are because bus bar protection scheme to lower voltage side of a transformer is not applied. In spite of enormous initial investment costs, advanced countries take so much account of power system reliability and stable supply that they adopt the parallel operation scheme in a normal state. One of the problems in parallel operation is the overheat of transformers due to the excessive circulation currents. This paper presents the scheme that controls voltages between both transformers using circulation currents that occurs in parallel operation.

  • PDF

Parallel Transmission and Recovery Methods of Images Using the Two Dimensional Fiber-Optic Code-Division Multiple-Access System (2차원 광부호분할 다중접속 시스템에 의한 영상의 병렬 전송과 복원법)

  • Lee, Tae-Hoon;Park, Young-Jae;Seo, Ik-Su;Park, Jin-Bae
    • The Transactions of the Korean Institute of Electrical Engineers D
    • /
    • v.49 no.12
    • /
    • pp.683-689
    • /
    • 2000
  • Two-dimensional(2-D) fiber-optic code-division multiple-access(FO-CDMA) system utilizes the optical orthogonal signature pattern code(OOSPC) to encode and decode 2-D data. Encoded 2-D data are spatially multiplexed and transmitted through an image fiber and receiver recovers the intended data by means of thresholding process. OOSPC's construction methods based on expansion of the optical orthogonal code, which is used in one-dimensional(1-D) FO-CDMA system, are introduced. Each OOSPC's performances are compared by using the bit error rate(BER) of interfering OOSPC's of other users. From the results we verify that a balanced incomplete block design(BIBD) construction has the best performance among other mehtods. We also propose a decomposed bit-plane method for parallel transmission and recovery of 256 gray-scale images using OOSPC's constructed by the BIBD method. The simulation result encourages the feasibility of parallel transmission and recovery of multiuser's images.

  • PDF

Review of Mechanical Behaviors of Pillar in Large Parallel Tunnel (대단면 근접병설터널에서의 필러부 거동특성 검토)

  • Sin, Young-Wan;Kim, Young-Geun
    • Tunnel and Underground Space
    • /
    • v.20 no.3
    • /
    • pp.131-144
    • /
    • 2010
  • The design and construction of tunnels has been followed an large parallel tunnels with a small clearance because of the various conditions. Rock pillar between each single tunnel is supposed to be under heavy load by rock mass. The stability of pillar is very important for the ensure the stability of the large parallel tunnels. In this study, the analysis of stress state of pillar at various construction cases is reviewed to investigate the mechanical behaviour of tunnels and stability of the pillar.

A Eco-friendly Construction Plan of bridge cross over and parallel to rivers (하천 병행 및 횡단교량의 친환경 건설계획)

  • Kim, Young-Sang;Ko, Seung-Young;Kim, Hyoung-Su;Min, Young-Taek
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.131-132
    • /
    • 2009
  • A road construction From Gyegok to Shinduk, korea was ordered for the alternative design by Jeollabuk-do, 2008. The propose of study is to introduce the planning process for a optimal eco-friendly design and construction of bridge cross over and parallel to rivers.

  • PDF

Construction and Performance Test of a Supercomputing PC System using PC-clustering and Parallel Virtual Machine (PC-Clustering과 병렬가상장치에 의한 수치계산용 슈퍼컴퓨팅 PC 시스템 구축과 성능 테스트)

  • Hong, Woo-Pyo;Kim, Jong-Jae;Oh, Kwang-Sik
    • Journal of the Korean Data and Information Science Society
    • /
    • v.10 no.2
    • /
    • pp.473-483
    • /
    • 1999
  • We introduce a way to construct a supercomputing capable system with some networked PCs, running the Linux operating system and computing power comparable with expensive commercial workstations, and with the Parallel Virtual Machine (PVM) software which enables one to control the total CPUs and memories of the networked PCs. By benchmarking the system using a PVM parallel program, we find that the system's parallel efficiency is close to 90 %.

  • PDF

A Cooperative Parallel Tabu Search and Its Experimental Evaluation

  • Matsumura, Takashi;Nakamura, Morikazu;Tamaki, Shiro;Onaga, Kenji
    • Proceedings of the IEEK Conference
    • /
    • 2000.07a
    • /
    • pp.245-248
    • /
    • 2000
  • This paper proposes a cooperative parallel tabu search which incorporates with the historical information exchange among processors in addition to its own searching of each processor. We investigate the influence of our proposed cooperative parallel tabu search by comparison with a serial tabu search. We also propose two extensions of the cooperative parallel tabu search which are the cooperative construction of tabu memory and the selection of cooperative partner. Through computational experiment, we observe the improvement of solutions by our proposed method.

  • PDF

Shear Strength of Nailed Connection of Domestic Plywood as a Substitute for OSB (OSB 대체용 국내산 합판의 못 접합부 전단내력 성능)

  • Suh, Jin-Suk;Hwang, Sung-Wook;Hwang, Kweon-Hwan;Jeong, Gi-Young;Joung, Ha-Hyun
    • Journal of the Korean Wood Science and Technology
    • /
    • v.40 no.4
    • /
    • pp.287-293
    • /
    • 2012
  • This study was carried out in order to compare nail shear strength between domestic plywood and imported OSB for structural sheathing members as infill wall of wooden construction. The differences of nail shear strength between parallel-to-grain direction and perpendicular-to-grain direction of sheathing material to frame material were distinct at the plywood composition. The shear strengths of plywood and OSB with nail met current design values. The plywood of P-4 type, which uses MLH at surface layer and constructs 7 ply, showed greater than OSB regardless of grain direction of sheathing material to frame material. When the plywood as sheathing material to frame material was used, it was found out that the overall construction of perpendicular-to-grain direction of plywood had greater nail shear strengths than the construction of parallel-to-grain.

Development of Sensorless Hydraulic Servo System for Underwater Harbor Construction (수중항만공사용 로봇의 센서리스 유압 서보 시스템 개발)

  • Kim, T.S.;Kim, C.H.;Park, K.W.;Lee, M.K.
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.708-713
    • /
    • 2004
  • This research develops a sensorless hydraulic servo system of Parallel-Typed robot for harbour construction. Purpose of the robot is to mechanize the construction, which is accomplished through a joystick's operating by a stoneworker (or diver). The robot is attached on the end of an excavator as its attachment or transported by a crane to reach the desired place. The embedded compact controller is installed on the robot body and controlled by wireless telecommunication. For underwater work, it is necessary to waterproof the robot and its sensors. Especially, a sensor waterproof is a main drawback for the underwater robot. This leads us to develop a hydraulic robot position controller using an observer which gives the position information without any position sensor. We design a neural network to identify the displacement change according to the command voltage to servo valve. To verify the sensorless controller, this paper presents the performance of the sensorless control for which the position is given by the observer comparing with that of the sensor control for which the position is measured by LVDT sensors.

  • PDF