• Title/Summary/Keyword: overlapped coverage

Search Result 20, Processing Time 0.027 seconds

Wake-up Algorithm of Wireless Sensor Node Using Geometric Probability (기하학적 확률을 이용한 무선 센서 노드의 웨이크 업 알고리즘 기법)

  • Choi, Sung-Yeol;Kim, Sang-Choon;Kim, Seong Kun;Lee, Je-Hoon
    • Journal of Sensor Science and Technology
    • /
    • v.22 no.4
    • /
    • pp.268-275
    • /
    • 2013
  • Efficient energy management becomes a critical design issue for complex WSN (Wireless Sensor Network). Most of complex WSN employ the sleep mode to reduce the energy dissipation. However, it should cause the reduction of sensing coverage. This paper presents new wake-up algorithm for reducing energy consumption in complex WSN. The proposed wake-up algorithm is devised using geometric probability. It determined which node will be waked-up among the nodes having overlapped sensing coverage. The only one sensor node will be waked-up and it is ready to sense the event occurred uniformly. The simulation results show that the lifetime is increased by 15% and the sensing coverage is increased by 20% compared to the other scheduling methods. Consequently, the proposed wake-up algorithm can eliminate the power dissipation in the overlapped sensing coverage. Thus, it can be applicable for the various WSN suffering from the limited power supply.

Reflectivity Mosaic of Two Radars Using a Height-weighted Method (고도 가중 방법을 이용한 레이더 반사도의 합성)

  • Lee, Jung-Hoon;Jung, Sung-Hwa;Heo, Bok-Haeng;Kim, Kyung-Eak
    • Korean Journal of Remote Sensing
    • /
    • v.26 no.4
    • /
    • pp.373-385
    • /
    • 2010
  • A new method to mosaic reflectivity over the overlapped coverage of two radars was developed. The method mosaics the radar reflectivity with weights after adjustment of reflectivity differences on overlapped coverage of neighboring two radars. Their weights are inverse proportion to the difference between the height of an interpolated reflectivity and the level of CAPPI (Constant Altitude PPI). The performance of this method was compared to different mosaic methods (Mosaics by maximum value, averaged value, nearest value and distance weighted value) using the reflectivity fields of a typhoon event observed by two radar. New method was better than any other methods either as a continuity and as a bias analysis of reflectivity at the boundaries in overlapped coverage by two radars.

Analysis of Women's Jacket Sizing Systems of RTW Brands and Development of Sizing Systems by Age Groups (여성복 브랜드의 연령집단별 상의치수체계 비교분석 및 성인 여성의 연령집단별 치수체계 설정)

  • Baek, Hye Yoon;Song, Hwa Kyung
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.42 no.6
    • /
    • pp.1056-1068
    • /
    • 2018
  • This study investigates whether women's wear brands' sizing systems reflect the body size and shape of their target age customers. This study classified 17 women's wear brands into three target age groups (20-30s, 30-40s, and 40-50s) and surveyed their body sizing systems for jacket items. The distribution of bust circumference and hip circumference of brands' sizing systems were compared with the size distribution of women in the 7th SizeKorea data. The brands targeting 20-30s fully produced five sizes which are the highest coverage rate, but the brands targeting 30-40s produced three sizes, and the brands targeting 40-50s produced one size. Regarding the body types, 60.0% of 20-30s target brands and 42.9% of 30-40s target brands reflected N type which is the average body type of each age group. However, the rest of the brands, including all 40-50s target brands, reflected A type which covered small portions of women. For each age group, 6 sizes with 24.0-29.0% coverage rates were proposed. With regard to the 88-94 size, three age groups overlapped: the 82-91 size was overlapped between the 20-30s and the 30-40s groups along with the 85-91 and 88-91 sizes that overlapped between the 30-40s and 40-50s groups.

Femto-Caching File Placement Technique for Overlapped Helper Coverage Without User Location Information (사용자 위치정보를 사용하지 않는 헬퍼 간 중첩 커버리지 영역을 위한 펨토-캐싱 파일 분배 기술)

  • Shim, Jae-Nam;Min, Byoung-Yoon;Kim, Dong Ku
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.39A no.11
    • /
    • pp.682-689
    • /
    • 2014
  • Due to explosive growth of mobile data traffic, many kind of techniques based on small cell is proposed as solution for phenomenon. However, those techniques essentially demands increase of backhaul capacity and causes performance degradation if not satisfied. Based on that, the approach applying the storage capacity in place of backhaul capacity, which is known as femto-caching, is proposed to reduce data downloading delay of users in system. In this paper, we expanded previous research by proposing file placement strategy with distribution of user position, which is more practical scenario. Simulation results verify that our proposed scheme has better performance gains mainly because when coverage of helpers are overlapped, users get more opportunity to connect various helpers which enables users to download a variety kind of files from helpers, not base station.

Improved Coordination Method for Back-up Protection Schemes Based on IEC 61850 (IEC 61850 기반 후비보호계전시스템 보호협조 개선방안)

  • Kim, Hyung-Kyu;Kang, Sang-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.1
    • /
    • pp.43-49
    • /
    • 2011
  • A distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, Zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome this problem clearly, this paper describes an improved backup protection coordination scheme using an IEC 61850-based distance relay for transformer backup protection. IEC 61850-based IED(Intelligent Electronic Device) and the network system based on the kernel 2.6 LINUX are realized to verify the proposed method. And laboratory tests to estimate the communication time show that the proposed coordination method is reliable enough for the improved backup protection scheme.

Distributed File Placement and Coverage Expansion Techniques for Network Throughput Enhancement in Small-cell Network (소형셀 네트워크 전송용량 향상을 위한 분산 파일저장 및 커버리지 확장 기법)

  • Hong, Jun-Pyo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.22 no.1
    • /
    • pp.183-189
    • /
    • 2018
  • This paper proposes distributed file placement and coverage expansion techniques for mitigating the traffic bottleneck in backhaul for small-cell networks. In order to minimize the backhaul load with limited memory space, the proposed scheme controls the coverage and file placement of base station according to file popularity distribution and memory space of base stations. In other words, since the cache hit ratio is low when there is small memory capacity or widespread file popularity distribution, the base stations expand its coverage and cache different set of files for the user located in overlapped area to exploit multiple cached file sets of base stations. Our simulation results show that the proposed scheme outperforms the conventional cache strategy in terms of network throughput when there is small memory capacity or widespread file popularity distribution.

A Node Positioning Method for Minimizing the Overlap of Sensing Areas in Wireless Sensor Networks with Adjustable Sensing Ranges (가변 감지영역을 갖는 센서노드로 구성된 무선 센서 네트워크에서 중첩영역 최소를 위한 노드의 위치 결정방법)

  • Seong, Ki-Taek;Song, Bong-Gi;Woo, Chong-Ho
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.44 no.1
    • /
    • pp.10-18
    • /
    • 2007
  • In this paper, we address the node positioning method for minimizing the overlap sensing areas in wireless sensor networks with adjustable sensing ranges. To find a optimal node position, we derive a optimal equations by using the overlapped areas, each node's radiuses and expended angles of opposite neighboring nodes. Based on it, we devise a new node positioning method, called as ASRC(Adjustable Sensing Ranges Control). Unlike existing condition based model, our proposed method is derived from mathematical formula, and we confirm its validity through various simulations.

Development of Asynchronous Blocking Algorithm through Asynchronous Case Study of Steam Turbine Generator (스팀터빈 발전기 비동기 투입 사례연구를 통한 비동기 방지 알고리즘 개발)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.10
    • /
    • pp.1542-1547
    • /
    • 2012
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. When calculation method of protection settings and logic for protection of generator asynchronization will be recommended, a distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection, this paper describes an improved backup protection coordination scheme using a new logic that will be suggested.

A Study on Protection of Generator Asynchronization by Impedance Relaying (임피던스 계전기를 이용한 발전기 비동기 투입 보호 연구)

  • Lee, Jong-Hweon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.2000-2006
    • /
    • 2011
  • Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. Where calculation method of protection settings and Logic for Protection of Generator Asynchronization will be recommended, A distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, Zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection this paper describes an improved backup protection coordination scheme using a new Logic that will be suggested.

Spontaneously Adsorbed Mo Layers on Pt(111) and Pt(100) Single Crystal Electrode Surfaces

  • Han, Yoon-gu;Jung, Chang-hoon;Rhee, Choong-Kyun
    • Bulletin of the Korean Chemical Society
    • /
    • v.23 no.3
    • /
    • pp.395-399
    • /
    • 2002
  • The voltammetric behavior of spontaneously adsorbing Mo layers on Pt(111) and Pt(100) electrodes has been studied to estimate the number of electrons involved in the electrochemical processes of spontaneously adsorbed Mo and the number of the bloc ked Pt sites for hydrogen adsorption. On Pt(111) and Pt(100) surfaces, the spontaneously adsorbed Mo layers showed redox peaks at 0.10 V and 0.15 V, respectively, and continuous current-potential waves in the conventional hydrogen region. Since the potential range of the Mo redox processes on both surfaces overlapped partially with the potential range of hydrogen adsorption, the variation in the ratio of the total charge of Mo and H ($Q_H$ +$Q_{MO}$) to the hydrogen charge of clean Pt electrode ($Q_H^0$) was analyzed. From the analysis, six electrons were estimated to be involved in the electrochemical processes of the spontaneously adsorbed Mo, and four Pt sites for hydrogen adsorption were calculated to be blocked by one adsorbed Mo atom. Based on these figures and the pH dependence of the Mo redox processes, we have proposed an electrochemical equation for the spontaneously adsorbed Mo. This electrochemical equation led us to conclude that the saturation coverage of the spontaneously adsorbed Mo is 0.25. The coverage of Mo less than 0.25, however, could not be determined voltammetrically due to the convolution of the charges of Mo and H.