• Title/Summary/Keyword: outrigger system

Search Result 78, Processing Time 0.024 seconds

Corner Steel plate-Reinforced Core Wall System

  • Park, Hong-Gun;Kim, Hyeon-Jin;Park, Jin-Young
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.193-199
    • /
    • 2019
  • For better structural performance and constructability, a new composite core wall system using steel plate columns at the corners of the core section was developed. Using the proposed core wall, nonlinear section analysis and 3-dimensional structural analysis were performed for the prototype core wall section and super high-rise building, respectively. The analysis results showed that, when compared to traditional RC core wall case, the use of the corner steel plate columns provided better structural capacity, which allows less wall thickness and re-bars. Further, due to such effects, the construction cost and time can be reduced despite the use of steel plate columns.

Hull Form Optimization of a Small Trimar:an by Model Testing

  • Oh Se-Myun;Lee Seung-Hee;Lee Young-Gill
    • Journal of Ship and Ocean Technology
    • /
    • v.9 no.3
    • /
    • pp.14-22
    • /
    • 2005
  • A 12 m long G/T 4.99 Class Trimaran is now under development at the Center for Transportation System of the Yellow Sea (CTYS) before deployed as a pleasure fishing boat along the west coast of Korean peninsula. The boats will be made of fiber reinforced plastics and equipped with a 360 hp diesel engine and a water jet propulsion system to propel the ship to reach maximum speed of 25knots after fully loaded. Model tests for hull form development of the Trimaran have been done at the towing tank of the Inha University. The influence of the spacing between main hull and outriggers and the longitudinal location of the outriggers have been carefully examined to find the optimal size and locations of the outriggers to improve both the resistance characteristics, and the results are reported in the present paper.

A Study on the History of Technology in Korean Modern Architecture (한국 현대건축의 기술역사에 관한 연구)

  • Jung, In-Ha;Kim, Jin
    • Journal of architectural history
    • /
    • v.9 no.3 s.24
    • /
    • pp.51-69
    • /
    • 2000
  • This study tries to analyze the development of architectural technologies appeared in several tall buildings and large spatial structures from 1955 to 1999 in Korea. We suppose that these buildings represent the development of technology in Korean modern architecture. By the detailed analysis of these buildings, we can arrive at a conclusion as such; During the years 1955-1999, there existed a great changement in the eighties. We can find this fact very well in the domain of structural system and curtain wall system. In large spatial structures, the structural-system of shell and steel truss dome was replaced by that of space frame, space truss and cable truss with membrane. In tall building, the structural system of rigid frame and shear wall was replaced by tubular system, core and outrigger system. Korean architects introduced the aluminum curtain wall in the sixties, but its low technological level caused many problems in reality. Therefore, precast concrete curtain wall appeared from seventies as the main method for an outer wall in tall building. With the augmentation of height after 1980, PC curtain wall was replaced by the aluminum curtain wall of unit type and structural glass wall system. These systems help to stress the transparency in a tall building.

  • PDF

Evaluation of Progressive Collapse Resisting Capacity ofMegacolumn and Outrigger System (초대형 기둥-아웃리거 시스템의 연쇄붕괴 저항성능 평가)

  • Park, Jun-Hee;Kim, Jin-Koo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.484-487
    • /
    • 2009
  • 초고층구조물의 경우 중저층 구조물과 다르게 설계시 중력하중과 풍하중의 크기가 매우 크므로 이를 제어하는 구조물의 코어에 강성이 큰 전단벽을 설치하고 최상층에 아웃리거나 벨트트러스를 설치하는 방법을 많이 적용한다. 그리고 홍콩의 IFC와 같이 초대형기둥과 아웃리거를 설치하여 횡하중에 저항하는 구조시스템도 제시되고 있다. 이러한 초고층구조물에서 연쇄붕괴가 발생할 경우 세계무역센터의 붕괴에서 나타나듯이 상상을 초월하는 피해를 초래할 수 있다. 따라서 본 연구에서는 이러한 초고층 구조시스템의 연쇄붕괴저항능력을 Pushdown해석을 이용하여 평가하였다.

  • PDF

Challenges in Structural Design of W-Project

  • Kim, Jong Soo
    • International Journal of High-Rise Buildings
    • /
    • v.3 no.3
    • /
    • pp.199-204
    • /
    • 2014
  • W-Project is 70-story mixed-use residential building complex project in Busan, the second biggest city in South Korea. As it is a high rise building complex located at the coast, the residents have great ocean view from the height. Though, there were many difficult challenges to be solved to secure structural safety and meet the serviceability requirements. As it is located on the reclaimed land, securing the foundation bearing capacity on soft soil is the first issue to be solved for the stable structure. W-Project. Busan on the way usual track of typhoon, wind load on structure is also critical for structural safety and serviceability for occupants due to wind vibration. This paper will address process of lateral load resisting structural system of W-Project.

Shaking Table Test and Seismic Performance Evaluation of Shanghai Tower

  • Chunyu, Tian;Congzhen, Xiao;Hong, Zhang;Jinzhe, Cao
    • International Journal of High-Rise Buildings
    • /
    • v.1 no.3
    • /
    • pp.221-228
    • /
    • 2012
  • Shanghai Tower is a super high-rise building of 632 m height with 'mega frame-core- outrigger truss' structure system. Due to the complexity and irregularity of structure, shaking table test was carried out to investigate its seismic performance. A 1/40 scaled test model was designed, built and tested on shaking table under earthquake of small, moderate and large levels. The experimental results showed that the structure can meet the requirements of Chinese codes and reach scheduled performance objectives. Elastic and plastic time-history analysis on the structure were carried out and the results were compared to experimental results. Based on the research results some suggestions were proposed to contribute favorable effect on the seismic capacity of the structure.

Design and Applications of Buckling-Restrained Braces

  • Watanabe, Atsushi
    • International Journal of High-Rise Buildings
    • /
    • v.7 no.3
    • /
    • pp.215-221
    • /
    • 2018
  • Buckling-Restrained Braces (BRBs) have been widely applied to tall buildings in seismic areas in the world. In this paper the author summarizes representative types of BRB compositions and shows two cases of special applications of BRBs. In the first case, BRB diagonals for tall building were used to provide stable cyclic nonlinear hysteresis and also used to limit forces generated at columns, connections and walls. The top outriggers are pre-loaded by jacks to resolve long-term differential shortenings between the concrete core wall and concrete-filled steel box columns. The second case is the retrofit work for a communication tower by replacing the insufficiently strong members with BRBs in Japan.

Optimizing the Exhaustion of Inventory for Design Changes: Focusing on Concrete Pump Truck Outrigger Process (설계변경 재고 소진 최적화: E사(社) 펌프카 아우트리거 공정 중심으로)

  • Chan-Woong Park
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.4
    • /
    • pp.174-179
    • /
    • 2022
  • Companies are making design changes by improving product quality and function to succeed while meeting customer requirements continuously. Design changes are changing the product BOM's amount, item, specification, and shape while causing a change in the product's structure. At this time, the problem of inventory exhaustion of parts before design change is a big topic. If the inventory exhaustion fails, the pieces before the design change become unused and are discarded, resulting in a decrease in asset value, and the quality cost of the design change affects the company's profits. Therefore, it is necessary to decide to minimize quality costs while minimizing waste inventory costs at the time of application of design changes. According to the analysis, priorities should be prioritized according to urgency because the quantity of items before the design change affects the applied lead time.

Effects of Perimeter to Core Connectivity on Tall Building Behavior

  • Besjak, Charles;Biswas, Preetam;Petrov, Georgi I.;Streeter, Matthew;Devin, Austin
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.1
    • /
    • pp.1-9
    • /
    • 2017
  • The Pertamina Energy Tower (PET) and Manhattan West North Tower (MWNT) are two supertall towers recently designed and engineered by Skidmore, Owings & Merrill (SOM). The structural system for both buildings consists of an interior reinforced concrete core and a perimeter moment frame system, which is primarily structural steel. As is typical for tall towers with both concrete and steel elements, staged construction analysis was performed in order to account for the long term effects of creep and shrinkage, which result in differential shortening between the interior concrete core and steel perimeter frame. The particular design of each tower represents two extremes of behavior; PET has a robust connection between the perimeter and core in the form of three sets of outriggers, while the perimeter columns of MWNT do not reach the ground, but are transferred to the core above the base. This paper will present a comparison of the techniques used during the analysis and construction stages of the design process with the goal of understanding the differences in structural behavior of these two building systems in response to the long term effects of creep and shrinkage. This paper will also discuss the design and construction techniques implemented in order to minimize the differential shortening between the interior and exterior over the lifespan of these towers.

Real-scale field testing for the applicability examination of an improved modular underground arch culvert with vertical walls

  • Tae-Yun Kwon;Jin-Hee Ahn;Hong-duk Moon;Kwang-Il Cho;Jungwon Huh
    • Advances in concrete construction
    • /
    • v.15 no.6
    • /
    • pp.377-389
    • /
    • 2023
  • In this study, an improved modular arch system with the lower arch space composed of a precast arch block and an outrigger was proposed as an underground culvert, and its applicability and structural behaviors were confirmed. This modular arch culvert structure with vertical walls was designed using precast blocks and by adjusting the placement spacing of concrete blocks to the upper part form an arch shape and the lower part form a vertical wall shape, based on previously researched modular arch systems. Owing to the vertical wall of the proposed modular arch system, it is possible to secure a load-carrying capacity and an arch space that can sufficiently resist the earth pressure generated from the backfill soil and loading on the arch system. To verify the structural characteristics, and applicability of the proposed modular precast arch culvert structure, a full-scale modular culvert specimen was fabricated, and a loading test was conducted. By examining its construction process and loading test results, the applicability and constructability of the proposed structure were analyzed along with its structural characteristics. In addition, its the structural predictability and safety for the applicability were evaluated by comparing the construction process and loading test results with the FE analysis results.