• Title/Summary/Keyword: optimum operation

Search Result 1,183, Processing Time 0.034 seconds

International Standardization of Reliability Assessment for Wind Turbines and Wind Farms (풍력발전기 및 풍력발전단지 신뢰성 평가 국제 표준화)

  • Kim, Seokwoo
    • Journal of Wind Energy
    • /
    • v.9 no.4
    • /
    • pp.5-8
    • /
    • 2018
  • Optimum performance and reliable operation of wind turbines and/or wind farms are crucial parameters for stakeholders such as OEMs, operators, owners and investors. The efficiency and life time of wind power heavily depends on operation and maintenance efforts. Every manufacturer or owner wants to have wind turbines with high reliability, which can be defined as the probability that a wind turbine will perform its designed function for a certain period of time under stated conditions. In this regard, IEC WG26 is now developing a technical specification defining information categories from which reliability metrics can be identified and reported.

A Stochastic Linear Scheduling Method using Monte Carlo Simulation

  • Soderlund, Chase;Park, Borinara
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.169-173
    • /
    • 2015
  • The linear scheduling method or line-of-balance (LOB) is a popular choice for projects that involve repetitive tasks during project execution. The method, however, produces deterministic schedule that does not convey a range of potential project outcomes under uncertainty. This results from the fact the basic scheduling parameters such as crew production rates are estimated to be deterministic based on single-point value inputs. The current linear scheduling technique, therefore, lacks the capability of reflecting the fluctuating nature of the project operation. In this paper the authors address the issue of how the variability of operation and production rates affects schedule outcomes and show a more realistic description of what might be a realistic picture of typical projects. The authors provide a solution by providing a more effective and comprehensive way of incorporating the crew performance variability using a Monte Carlo simulation technique. The simulation outcomes are discussed in terms of how this stochastic approach can overcome the shortcomings of the conventional linear scheduling technique and provide optimum schedule solutions.

  • PDF

A STUDY ON SELECTING OPTIMAL HAUL ROUTES OF EARTHMOVING MACHINE

  • Han-Seong Gwak;Chang-Yong Yi;Chang-Baek Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.513-516
    • /
    • 2013
  • Earthmoving equipment's haul-route has a great influence on the productivity of the earth work operation. Haul-route grade is a critical factor in selecting the haul-route. The route that has low grade resistance contributes to increase machine travel speed and production. This study presents a mathematical model called "Hauling-Unit Optimal Routes Selecting system" (HUORS). The system identifies optimal path that maximize the earth-work productivity. It consists of 3 modules, i.e., (1) Module 1 which inputs site characteristic data and computes site location and elevation using GIS(Geographical Information System); (2) Module 2 which calculates haul time; (3) Module 3 which displays an optimum haul-route by considering the haul-route's gradient resistances (i.e., from the departure to the destination) and hauling time. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model.

  • PDF

Development of penetration rate model and optimum operational conditions of shield TBM for electricity transmission tunnels (터널식 전력구를 위한 순굴진율 모델 개발 및 이를 활용한 쉴드TBM 최적운전 조건 제안)

  • Kim, Jeong-Ju;Ryu, Hui-Hwan;Kim, Gyeong-Yeol;Hong, Seong-Yeon;Jeong, Ju-Hwan;Bae, Du-San
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.6
    • /
    • pp.623-641
    • /
    • 2020
  • About 5 km length of tunnels were constructed by mechanized tunnelling method using closed type shield TBM. In order to avoid construction delay problems for ensuring timely electricity transmission, it is necessary to increase the prediction accuracy of the excavation process involving machines according to rock mass types. This is important to corroborate the project duration and optimum operation for various considerations involved in the machine. So, full-scale tunnelling tests were performed for developing the advance rate model to be appropriately used for 3.6 m diameter shield TBM. About 100 test cases were established and performed using various operational parameters such as thrust force and rotational speed of cuttterhead in representative uniaxial compressive strengths. Accordingly, relationships between normal force and penetration depth and, between UCS and torque were suggested which consider UCS and thrust force conditions according to weathered, soft, hard rocks. Capacity analysis of cutterhead was performed and optimum operational conditions were also suggested based on the developed model. Based on this study, it can be expected that the project construction duration can be reduced and users can benefit from the provision of earlier service.

Evaluation of Pilot scale Coagulation system Design for CSOs treatment (CSOs 처리를 위한 실증규모 응집침전시스템의 설계평가)

  • Lee, Seung-Chul;Ha, Sung-Ryong
    • Journal of Wetlands Research
    • /
    • v.15 no.1
    • /
    • pp.1-8
    • /
    • 2013
  • A pilot scale coagulation system, which has a function of physicochemical treatment, was developed to treat Combined sewer overflows(CSOs). This coagulation system requires evaluation of optimum design factors whether it has reflected those of lab scale system, moreover, the pilot scale system can be evaluated differently according to the characteristics of influent CSOs even though it has reflected lab scale's design factors. We conducted an experiment using lab scale system that could treat $1m^3$ of CSOs in a day, and also pilot-scale system with $100m^3/day$ CSOs flowed into the Cheongju sewage treatment plant. Therefore the aim of this study is to evaluate a hydraulic similarity between the design factors of pilot scale and those of lab scale coagulation system, and to evaluate feasibility of the coagulation system for the CSOs treatment with optimum operation conditions. From the result of pilot-test, we drew the optimum operation factors of in line mixer and flocculator having similarities with those of lab scale system as well as the optimum coagulant dose. Finally we confirmed that the coagulation system has feasibility to treat the CSOs with high removal efficiency.

A study on the Optimal Economic Vessel in the South-East Asian Trade Route (동남아 항로의 최적 경제선박에 관한 연구)

  • Lee, Dong-Gon
    • 한국기계연구소 소보
    • /
    • s.14
    • /
    • pp.145-155
    • /
    • 1985
  • The recent trend in shipbuilding technology is toward development of highly economical vessels of which construction and operation costs are minimized, whereas cargo transport capacity is maximized. But, most of the vessel which are now operated by some of the nation's shipping companies are uneconomical ones built before oil crisis and consequently the companies are suffering from long-lasted deficit problem. In this paper, derivation study of optimum vessel for multi purpose cargo vessel on south-East Asian trade route is carried out to solve this problem. The Required Freight Rate is used as a measure of merits.

  • PDF

A New Valley-fill Circuit for Improving Power Factor (밸리-필 정류 회로의 역률 개선)

  • 최남열;안찬권;이치환
    • Proceedings of the IEEK Conference
    • /
    • 2003.07c
    • /
    • pp.2935-2938
    • /
    • 2003
  • A new Valley-fill circuit for improving PF(power factor) is proposed in this paper. The proposed topology combines Valley-fill rectifier and an additional inductor for boosting. In the proposed circuit, a shapc of input current is related to the PWM duty cycle. The boosting inductor makes improve PF by the electric charge transfer action. The operation principle and the shape of input current arc analyzed as applied the boosting inductor. The optimum value of boosting inductor is determined. A 100W single-stage converter has been designed and tested. Experimental results are presented to verify the validity of the proposed converter.

  • PDF

4인자(因子) 이상(以上)의 EVOP법(法)에 관한 연구

  • Gang, Eun-Mi
    • Journal of Korean Society for Quality Management
    • /
    • v.11 no.1
    • /
    • pp.30-43
    • /
    • 1983
  • Evolutionary Operation was proposed by Box(1957) as an operating procedure for nudging a plant toward optimum conditions without causing dramatic disturbances and catastrophic cutbacks in production. In case two or three operating variables are monitored, Box and Hunter (1959) show how the EVOP is facilitated by using simplified calculations and emphasizing graphical presentation. Now, in this artical we develope EVOP when four operating variables are monitored and suggest more extended EVOP in general case.

  • PDF

Treatment of Wastewater containing Cu and Ni by Electrolysis (전기분해를 이용한 동과 니켈함유 폐수처리)

  • 김재용;이상희
    • Journal of environmental and Sanitary engineering
    • /
    • v.16 no.2
    • /
    • pp.47-55
    • /
    • 2001
  • We investigated to find the optimum operation condition of electrolysis which have an influence on removal efficiency of heavy metals. When we experimented the testing wastewaters containing each 250mg/L of Cu and Ni ions, we got the variables like as pH, amount of electrolyte(NaCl), different species of electrode, electrode gap, electric strength, the number of electrodes, after fastening positive electrode plate with Al, Fe, Ti and negative electrode plate with Stainless Steel plate.

  • PDF