• 제목/요약/키워드: optimum maintenance

검색결과 377건 처리시간 0.024초

수혜 인원을 고려한 농업용 저수지의 최적 정비 모델 개발 (Developing an Optimum Equipment Model for Agricultural Reservoir Considering Beneficiary)

  • 김시운;김종옥;박승기;정남수;장우석;이세희;최원
    • 한국농공학회논문집
    • /
    • 제50권6호
    • /
    • pp.75-81
    • /
    • 2008
  • The purpose of this study was to develop an optimum equipment model considering various objective functions and variables of agricultural reservoir. Traditional optimum function for feasibility assessment is based on economic benefit, but we tried new approach of feasibility assessment based on the number of beneficiary. The data of Yuraimi reservoir and Yongbong reservoir in Yesan-gun such as numbers of related people, construction costs, safe diagnosis have been gathered for applying developed model. Data are used for determining optimum strategy with restricted cost. For verifying results of optimum maintenance, real maintenance data of Yuraimi reservoir were compared with simulated strategy. Results show that simulated maintenance strategies are 3 times more effective than real maintenance data.

생애주기비용을 고려한 성능기반 교량 최적 유지관리 전략 수립 시스템 개발 (Development of the Performance-Based Bridge Maintenance System to Generate Optimum Maintenance Strategy Considering Life-Cycle Cost)

  • 박경훈;이상윤;황윤국;공정식;임종권
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제11권4호
    • /
    • pp.109-120
    • /
    • 2007
  • 본 연구에서는 생애주기비용을 고려한 성능기반 최적 유지관리 전략 수립 시스템을 개발하였다. 교량 수명동안 비용과 성능이라는 상반되는 목적을 균형있게 만족시킬 수 있는 유지관리 시나리오의 생성을 다중목적 조합최적화 문제로 정식화하고 유전자알고리즘을 적용하였다. 개발된 프로그램을 이용하여 국도 상 강거더 교량의 최적 유지관리 시나리오를 제공하는 과정을 제시하였다. 개발된 시스템은 현재의 교량 유지관리 전략 수립의 방법을 개선하여 교량 관리주체에게 다양한 제약 및 요구조건에 부합하는 최적의 교량 유지관리 시나리오를 제공할 수 있는 효율적인 도구로 활용될 수 있을 것으로 판단된다.

강교량의 최적 유지관리 시나리오 선정 모델 (The Model to Generate Optimum Maintenance Scenario for Steel Bridges considering Life-Cycle Cost and Performance)

  • 박경훈;이상윤;김정호;조효남;공정식
    • 한국강구조학회 논문집
    • /
    • 제18권6호
    • /
    • pp.677-686
    • /
    • 2006
  • 본 논문에서는 생애주기비용뿐만 아니라 생애주기성능 조건을 함께 고려하여 열화되는 교량의 최적 유지관리 전략 수립을 위한 보다 실제적이고 현실적인 방법을 제안하였다. 교량의 성능 및 비용과 관련된 다중목적 조합 최적화 문제인 교량 유지관리 시나리오 집합의 생성을 위해 유전자 알고리즘을 적용하였으며, 다중목적함수에 대한 최적의 균형 잡힌 유지관리 시나리오의 선정이 가능한 기법을 제안하였다. 최적 유지관리 시나리오는 부재수준뿐만 아니라 교량 시스템 수준에서도 생성 가능하도록 하였다. 실제 공용중인 교량에 적용하여 제안된 방법의 실 적용성을 검증하고 분석하였다. 제안된 방법은 기존의 유지관리방법의 한계를 극복하고, 실질적인 예방유지관리체계의 도입을 위한 교량 유지관리 의사결정에 활용될 수 있을 것으로 기대된다.

불완전보전을 고려한 시스템의 최적 정기 예방보전 시기 (Optimum Periodic Preventive Maintenance Time for a System with Imperfect Maintenance)

  • 정영배
    • 산업경영시스템학회지
    • /
    • 제17권32호
    • /
    • pp.221-226
    • /
    • 1994
  • Almost preventive maintenance policies assumed that the system after pm has failure rate as before pm with probability p and as good as new with probability 1-p. This paper considers the s-expected cost of the model with imperfect periodic preventive maintenance that increasing minimal repair costs at failure and obtains the optimum periodic preventive maintenance time. Numerical example are shown in which the failure time of the system has gamma distribution.

  • PDF

다구찌의 피드백 제어시스템 내 다수 함수 품질특성 고찰 (Evaluation of Quality Levels with Multiple Probability Distributions Under the Taguchi's Feedback Control System)

  • 송도현;이상헌
    • 경영과학
    • /
    • 제24권1호
    • /
    • pp.77-90
    • /
    • 2007
  • Taguchi assumed that a product characteristic has the uniform distribution in its preventive maintenance limit when deriving the expected loss generated by the quality deviation. But it is reasonable to assume that a product characteristic has the normal distribution than the uniform distribution. On this paper, we first find the optimum inspection interval and the optimum preventive maintenance limit under the truncated triangular distribution. Secondly we use the beta-general distribution and compare with the truncated triangular distribution. By using the numerical examples, we find the optimum inspection interval and the optimum preventive maintenance limit under their distributions. As a result, we find that the beta-general distribution gives the best solution and easy calculation.

Optimal Maintenance Scheduling in a Two Identical Component Parallel Redundant System Subject to Exponential Power Hazards

  • El-Damcese, M.A.;Helmy, A.N.
    • International Journal of Reliability and Applications
    • /
    • 제9권2호
    • /
    • pp.141-152
    • /
    • 2008
  • This paper presents equations, which can be used to evaluate the failure frequency and the failure rate of a two identical component parallel redundant system in which each component can operate in its wear out period, and the failure rate of each component is exponential power distribution. The optimum maintenance interval for a two identical component parallel redundant system can be obtained using these equations. The proposed approach is presented and illustrated using several numerical examples. The optimum maintenance interval for each component in a two identical parallel redundant system will depend on factors such as: failure rate, repair and maintenance times of each component in the parallel redundant systems.

  • PDF

다수의 고장유형을 갖는 제철설비의 최적 정비주기 산출 (Determining the Optimum Maintenance Period of the Steel Making Equipment Having Multiple Failure Types)

  • 송홍준;전치혁
    • 산업공학
    • /
    • 제16권1호
    • /
    • pp.27-33
    • /
    • 2003
  • The maintenance cost in K Steelworks has been continuously increased in proportion to the production cost. However, there seems to be a possibility of reducing cost through the optimization of maintenance actions. The failure types of the equipment in steelworks ate various with different failure cost. Thus the failure rate and cost of each type of failures should be considered simultaneously when the optimum maintenance period is to be determined. It is considered that the equipment undergoes periodic replacement and a specified number of incomplete preventive maintenance actions are performed during a replacement period. Assuming that the time to failure follows a Weibull distribution, the parameters of the failure rate are estimated using the maximum likelihood estimation. The optimal replacement period is determined to minimize the average cost per unit time. As the result of analysis it is suggested that the existing maintenance period for a hot-rolling equipment can be extended significantly.

수도사업자의 경영환경을 고려한 상수도관망 적정 유지관리비 산정 모델 개발 연구 (The developing optimum maintenance cost model for water pipe network by waterworks business characteristics)

  • 김기범;김창환;신휘수;서지원;형진석;구자용
    • 상하수도학회지
    • /
    • 제31권1호
    • /
    • pp.51-62
    • /
    • 2017
  • For the asset management of a water pipe network, it would be necessary to understand the extent of the maintenance cost required for the water pipe network for the future. This study would develop a method to draw the optimum cost required for the maintenance of the water pipe network in waterworks facilities to maintain the aim revenue water ratio and to achieve the target revenue water ratio, considering the water service providers' waterworks condition and revenue water ratio comprehensively. This study conducted a survey with 96 water service providers as of the early 2015 and developed models to estimate the optimum maintenance cost of the water pipe network, considering the characteristics of the water service providers. Since the correlation coefficient of all the developed models was higher than 0.95, it turned out that it had significant reliability, which was statistically significant. As a result of applying the developed models to the actual water service providers, it was drawn that increasing revenue water ratio to more than a certain level can reduce the maintenance cost of the water pipe network by a great deal. In other words, it is judged that it would be the most efficient to secure the reliability of waterworks management by increasing the short-term revenue water ratio to more than a certain level and gradually increase the revenue water ratio from the long-term perspective. It is expected that the proposed methodology proposed in this study and the results of the study will be used as a basic research for planning the maintenance of water pipe network or establishing a plan for waterworks facilities asset management.

Optimum maintenance scenario generation for existing steel-girder bridges based on lifetime performance and cost

  • Park, Kyung Hoon;Lee, Sang Yoon;Yoon, Jung Hyun;Cho, Hyo Nam;Kong, Jung Sik
    • Smart Structures and Systems
    • /
    • 제4권5호
    • /
    • pp.641-653
    • /
    • 2008
  • This paper proposes a practical and realistic method to establish an optimal lifetime maintenance strategy for deteriorating bridges by considering the life-cycle performance as well as the life-cycle cost. The proposed method offers a set of optimal tradeoff maintenance scenarios among other conflicting objectives, such as minimizing cost and maximizing performance. A genetic algorithm is used to generate a set of maintenance scenarios that is a multi-objective combinatorial optimization problem related to the lifetime performance and the life-cycle cost as separate objective functions. A computer program, which generates optimal maintenance scenarios, was developed based on the proposed method using the life-cycle costs and the performance of bridges. The subordinate relation between bridge members has been considered to decide optimal maintenance sequence and a corresponding algorithm has been implemented into the program. The developed program has been used to present a procedure for finding an optimal maintenance scenario for steel-girder bridges on the Korean National Road. Through this bridge maintenance scenario analysis, it is expected that the developed method and program can be effectively used to allow bridge managers an optimal maintenance strategy satisfying various constraints and requirements.

객차용 차륜 최적관리 연구 (A Study on the Optimum Control of Wheel for Coach Car)

  • 이찬우;허현무
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 춘계학술대회 논문집
    • /
    • pp.404-410
    • /
    • 2002
  • In this study, we have analyzed the optimum control of wheel for coach car in maintenance process to grasp the problem relating to this coach's wheel exchanged. So, these problems brought about decrement maintenance cost. This study were deliberated to solve problems concerning maintenance process of wheel exchanged and wheel specification in rolling stock workshops of KNR. Here, we describe some results.

  • PDF