• Title/Summary/Keyword: optimal operation planning

Search Result 199, Processing Time 0.023 seconds

Development of the Empty Container Simulation Game (공 컨테이너 시뮬레이션 게임)

  • Goh, Jeong-Bun;Moon, Il-Kyeong
    • IE interfaces
    • /
    • v.23 no.2
    • /
    • pp.89-99
    • /
    • 2010
  • Containers are commonly used as an effective and relatively inexpensive method for transporting goods. Unfortunately, there are often imbalances between the number of import and export containers, and some ports have a surplus of empty containers while others have a deficit. The Empty Container Simulation Game was developed to address these problems. The game is a computer role playing simulation that simulates the distribution of empty containers in order to solve empty container imbalances among ports. An optimal solution is obtained by the computer using linear programming (LP). Upon completion of the game, a player's game results are displayed along with the LP solution. The game interface was designed to provide easy access and operation. This game will serve to provide an easy understanding and planning for empty container management.

Generation Mix Analysis based on the Screening Curve and WASP-IV Techniques (탐색곡선법과 WASP-IV 모형을 이용한 국내 적정 전원구성 분석)

  • Jang, Se-Hwan;Park, Jong-Bae;Roh, Jae-Hyung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.4
    • /
    • pp.534-541
    • /
    • 2012
  • This paper tries to elicit an optimal generation mix of Korea. Two approaches, using the screening curve method and taking advantage of a generation expansion planning tool, WASP-IV, are applied in getting the mix. The data used in this study is based on the 5th basic plan for long-term electricity supply and demand. The Load Duration Curve, that is needed for applying Screening Curve Method(SCM), is made based on the load profile in 2010. In our using SCM, the nuclear plant's operation characteristic, carbon emission cost and spinning reserve are considered. In using WASP-IV to get the adequate generation mix, the base and target demand forecasts in the 5th basic plan are used and the carbon emission cost is also considered. In this paper, It introduces the domestic adequacy generation mix in 2024 though SCM and WASP-IV.

Active and Reactive Power Control Model of Superconducting Magnetic Energy Storage (SMES) for the Improvement of Power System Stability

  • Ham, Wan-Kyun;Hwang, Sung-Wook;Kim, Jung-Hoon
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.1
    • /
    • pp.1-7
    • /
    • 2008
  • Superconducting Magnetic Energy Storage (SMES) can inject or absorb real and reactive power to or from a power system at a very fast rate on a repetitive basis. These characteristics make the application of SMES ideal for transmission grid control and stability enhancement. The purpose of this paper is to introduce the SMES model and scheme to control the active and reactive power through the power electronic device. Furthermore, an optimal priority scheme is proposed for the combination of active and reactive power control to be able to stabilize power transient swings.

Robustness for Scalable Autonomous UAV Operations

  • Jung, Sunghun;Ariyur, Kartik B.
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.18 no.4
    • /
    • pp.767-779
    • /
    • 2017
  • Automated mission planning for unmanned aerial vehicles (UAVs) is difficult because of the propagation of several sources of error into the solution, as for any large scale autonomous system. To ensure reliable system performance, we quantify all sources of error and their propagation through a mission planner for operation of UAVs in an obstacle rich environment we developed in prior work. In this sequel to that work, we show that the mission planner developed before can be made robust to errors arising from the mapping, sensing, actuation, and environmental disturbances through creating systematic buffers around obstacles using the calculations of uncertainty propagation. This robustness makes the mission planner truly autonomous and scalable to many UAVs without human intervention. We illustrate with simulation results for trajectory generation of multiple UAVs in a surveillance problem in an urban environment while optimizing for either maximal flight time or minimal fuel consumption. Our solution methods are suitable for any well-mapped region, and the final collision free paths are obtained through offline sub-optimal solution of an mTSP (multiple traveling salesman problem).

The Application of a Genetic Algorithm with a Chromosome Limites Life for the Distribution System Loss Minimization Re-Configuration Problem

  • Choi, Dai-Seub
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.1
    • /
    • pp.111-117
    • /
    • 2007
  • This paper presents a new approach to evaluate reliability indices of electric distribution systems using genetic Algorithm (GA). The use of reliability evaluation is an important aspect of distribution system planning and operation to adjust the reliability level of each area. In this paper, the reliability model is based on the optimal load transforming problem to minimize load generated load point outage in each sub-section. This approach is one of the most difficult procedures and become combination problems. A new approach using GA was developed for this problem. GA is a general purpose optimization technique based on principles inspired from the biological evolution using metaphors of mechanisms such as natural selection, genetic recombination and survival of the fittest. Test results for the model system with 24 nodes 29 branches are reported in the paper.

DC-OPF Algorithm using Relative-Contribution Index in Generators (송전선에 흐르는 전력조류의 발전기별 상대 기여도를 이용한 DC-OPF 알고리듬)

  • Bang, Young-Sun;Ko, Dong-Wook;Chun, Yeong-Han
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.390-391
    • /
    • 2006
  • The economic dispatch problem is important in both power system planning and operation, although there have been major advances in defining and solving more complete Optimal Power Flow(OPF) problems, there exists a need for constrained economic dispatch techniques which, though not as rigorous or as exact an OPF, are fast enough to be used on desktop computers. This paper presents a DC-OPF algorithm that is based upon Relative-Contribution Index in Generators. The transmission constraints are modeled as linear constraint based on a DC-Power-Flow model. An detailed illustrative example is presented.

  • PDF

Intelligent Agent-based Open Architecture Cell Controller (지능에이전트를 이용한 개방형 셀 제어기 개발)

  • 황지현;최경현;이석희
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2001.04a
    • /
    • pp.393-397
    • /
    • 2001
  • This paper addresses an Intelligent Agent-based Open Architecture Cell Controller for Intelligent Manufacturing System(IMS). With an Intelligent Agent approach, the IMS will be a independent, autonomous, distributed system and achieve a adaptability to change of manufacturing environment. As the development methodology of Open Architecture Cell Controller, an object-oriented modeling technique is employed for building models associated with IMS operation, such as resource model, product model, and control model. Intelligent Agent-based Open Architecture Cell Controller consists of two kinds of dependant agents, that are the active agent and the coordinator agent. The Active agent is contributed to control components of IMS in real-time. The coordinator agent has great role in scheduling and planning of IMS. It communicates with other active agents to get information about status on system and generates the next optimal task through the making-decision logic and dispatch it to other active agent.

  • PDF

Optimal Production Cost Evaluation Using Karmarkar Algorithm (Karmarkar 알고리듬을 이용한 최적 발전시뮬레이션)

  • Song, K.Y.;Kim, Y.H.;Oh, K.H.
    • Proceedings of the KIEE Conference
    • /
    • 1995.11a
    • /
    • pp.113-116
    • /
    • 1995
  • In this study, we formulate production costing problem with environmental and operational constraints into an optimization problem of LP form. In the process of formulation, auxiliary constraints on which reflect unit loading order are constructed to reduce the size of optimization problem by economic operation rules. As a solution of the optimization problem in LP form, we use Karmarkar's method which performs much faster than simplex method in solving large scale LP problem. The proposed production costing algorithm is applied to IEEE Reliability Test System, and performs production simulation under environmental and operational constraints. Test and computer results are given to show the accuracy and usefulness of the proposed algorithm in the field of power system planning.

  • PDF

Agent-Based Scheduling for Semiconductor Wafer Fabrication Facilities (반도체 웨이퍼 팹의 에이전트 기반 스케쥴링 방법)

  • Yoon, Hyun Joong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.11 s.242
    • /
    • pp.1463-1471
    • /
    • 2005
  • This paper proposes an agent-based scheduling method fur semiconductor wafer fabrication facilities with hard inter-operation temporal constraints. The scheduling problem is to find the feasible schedules that guarantee both logical and temporal correctness. A proposed multi-agent based architecture is composed of scheduling agents, workcell agents, and machine agents. A scheduling agent computes optimal schedules through bidding mechanisms with a subset or entire set of the workcell agents. A dynamic planning-based approach is adopted for the scheduling mechanism so that the dynamic behaviors such as aperiodic job arrivals and reconfiguration can be taken into consideration.

A Dynamic Inventory Scheduling Method in Multi-Echelon Distribution Systems (다단계분배시스템에서의 동적 발주계획 수립방안)

  • Yoo, Yeong-Joon;Rhee, Jong-Tae
    • IE interfaces
    • /
    • v.11 no.2
    • /
    • pp.13-24
    • /
    • 1998
  • A distribution system is composed of multiple levels from a producer to customers, and it's objective is to supply customers with goods timely with a prescribed level of quality at a minimum cost. For the installation and operation of multi-echelon distribution system, DRP(Distribution Resource Planning) is widely used. However, because of the characteristic difference of material flow dynamic of each distribution center, it is almost impossible to get the optimal distribution scheduling. In this paper, an improved DRP method to schedule multi-echelon distribution network is proposed so that the lot-size and order point is dynamically obtained to meet the change of demand rate and timing. The experiment is done with various demand pattern, forecast errors of demand and lead times of central distribution center. The proposed method is compared with traditional statistical approach.

  • PDF