• Title/Summary/Keyword: operation time restriction

Search Result 40, Processing Time 0.034 seconds

Study on Solar Constraint in the Operation of COMS Meteorological Imager

  • Cho Young-Min
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.382-385
    • /
    • 2004
  • Communication Ocean Meteorological Satellite (COMS) for the hybrid mission of meteorological observation, ocean monitoring, and telecommunication service is planned to be launched onto Geostationary Earth Orbit in 2008 according to the Korea national space program. A feasibility study on the solar constraint in the operation of the COMS meteorological imager (MI) is performed using the GOES imager hardware operation characteristics. The Earth observation areas of the MI are introduced and the observation time of the MI observation area is calculated. The sun light can enter into the MI optical system around the local midnight and impinge on the performance of the MI. The solar eclipse viewed from the satellite occurs near local midnight around the equinox. This study discusses the restriction of imaging operation time that should be considered in order to avoid the solar intrusion about local midnight and to keep acceptable image quality for the MI observation areas. This study could be useful to build the operation concept of the MI during the development of the MI.

  • PDF

Development of Real-Time Decision Support System for the Efficient Berth Operation of Inchon Port (인천항의 효율적 선석운영을 위한 실시간 의사결정지원시스템 구축)

  • 유재성
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1998.10a
    • /
    • pp.12-16
    • /
    • 1998
  • The purpose of this paper is to develop a knowledge-based real-time decision support system to support decision makers for efficient berth operation of Inchon Port. In these days, the efficient berth operation has been many studied. The berth operation rules differ from port to port and the problem is highly dependent on natural, geographical and operational environment of port. In Inchon Port, the ship's entrance into port and departure from port is extremely affected by the status of dock and berth because of capacity restriction. First, we analyzed the specific characteristics of Inchon Port such as dock based on the data of 1997. And then, we construct the database of experts knowledge for berth utilization. Finally, we build the real-time decision support system for the efficient berth operation of Inchon Port to make the better berth allocation in case of not only regular scheduling but also dynamic scheduling such as delay in berth operation and exchange of ship between berths. The DSS is developed with graphic user interface(GUI) concept to help the user determining user interactive updating of the port status. Then this DSS will be provide decision maker with an efficient and fast way to berth allocation, and reduce wastes of time, space, and manpower in Inchon Port operation.

  • PDF

A study of the relationship between the subjective symptoms of VDT syndrome and occupational factors in VDT operators (VDT작업자의 작업조건과 다발하는 자각증상과의 관련성에 관한 연구)

  • Kim Kap-Sung;Lee Seung-Deok
    • Journal of Acupuncture Research
    • /
    • v.18 no.6
    • /
    • pp.70-83
    • /
    • 2001
  • Objective : In order to investigate symptoms prevalence related to visual display terminal(VDT) syndrome, and to evaluate the variables affecting the development of the VDT syndrome. Methods : a questionnaire survey was conducted on 127(81 men and 46 women) VDT operators who had been studied in Soongsil University graduated school in Seoul. Result : As a result of analysis with data collected by questionnaire, l. Variables affecting the level of general symptoms were sex, the total time of VDT operation per day, type of typewriting, location of keyboard, illumination, VDT working duration, the time of VDT operation without rest. 2. Variables affecting the level of eye symptoms were sex, the total time of VDT operation per day, type of typewriting, VDT working duration, illumination, method of eye-resting. 3. Variables affecting the level of musculoskeletal symptoms were sex, the total time of VDT operation per day, the time of VDT operation without rest, illumination. Conculsions : In order to protect workers from VDT syndrome, it is urgently required to implement standard management recommendations including restriction of VDT working hours and allowance of more sufficient resting time for VDT workers.

  • PDF

Comparative Economic Analysis on SOx Scrubber Operation for ECA Sailing Vessel

  • Jee, Jae-hoon
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.26 no.3
    • /
    • pp.262-268
    • /
    • 2020
  • The IMO (International Maritime Organization) has mandated the restriction of SOx emissions to 0.5 % for all international sailing vessels since January 2020. And, a number of countries have designated emission control areas for stricter environmental regulations. Three representative methods have been suggested to cope with these regulations; using low-sulphur oil, installing a scrubber, or using LNG (Liquefied Natural Gas) as fuel. In this paper, economic analysis was performed by comparing the method of installing a scrubber with the method of using low-sulphur oil without installing additional equipment. We suggested plausible layouts and compared the pros and cons of dif erent scrubber types for retrofitting. We selected an international sailing ship as the target vessel and estimated payback time and benefits based on navigation route, fuel consumption, and installation and operation costs. Two case of oil prices were analyzed considering the uncertainty of fuel oil price fluctuation. We found that the expected payback time of investment varies from 1 year to 3.5 years depending on the operation ratio of emission control areas and the fuel oil price change.

Prognostic Factors of Orbital Fractures with Muscle Incarceration

  • Lee, Seung Chan;Park, Seung-Ha;Han, Seung-Kyu;Yoon, Eul-Sik;Dhong, Eun-Sang;Jung, Sung-Ho;You, Hi-Jin;Kim, Deok-Woo
    • Archives of Plastic Surgery
    • /
    • v.44 no.5
    • /
    • pp.407-412
    • /
    • 2017
  • Background Among the various signs and symptoms of orbital fractures, certain clinical findings warrant immediate surgical exploration, including gaze restriction, computed tomographic (CT) evidence of entrapment, and prolonged oculocardiac reflex. Despite proper surgical reconstruction, prolonged complications such as diplopia and gaze restriction can occur. This article evaluated the prognostic factors associated with prolonged complications of orbital fractures with muscle incarceration. Methods The medical records of 37 patients (37 orbits) with an orbital fracture with muscle incarceration from January 2001 to January 2015 were reviewed. The presence of Incarcerated muscle was confirmed via CT, as well as by intraoperative findings. Various factors potentially contributing to complications lasting for over 1 year after the injury were categorized and analyzed, including age, cause of injury, injury-to-operation time, operative time, fracture type, nausea, vomiting and other concomitant symptoms and injuries. Results All patients who presented with extraocular muscle limitations, positive CT findings, and/or a positive forced duction test underwent surgery. Of the 37 patients, 9 (24%) exhibited lasting complications, such as diplopia and gaze restriction. The mean follow-up period was 18.4 months (range, 1-108 months), while that of patients who experienced prolonged complications was 30.1 months (range, 13-36 months). Two factors were significantly associated with prolonged complications: injury-to-operation time and nausea/vomiting. Loss of vision, worsening of motility, and implant complication did not occur. Conclusions Patients who present with gaze limitations, with or without other signs of a blow-out fracture, require a thorough evaluation and emergent surgery. A better prognosis is expected with a shorter injury-to-operation time and lack of nausea and vomiting at the initial presentation.

The Development of a Remote User Interface for the Manipulator using the Ethernet (이더넷을 이용한 매니퓰레이터의 원격 유저 인터페이스 개발)

  • Lee, Jong-Soo;Ryoo, Sung-Yop;Lee, Ki-Ju
    • Proceedings of the KIEE Conference
    • /
    • 1998.11b
    • /
    • pp.558-560
    • /
    • 1998
  • The operation of robot manipulators has a restriction that the operator must reside at the factory, where the manipulator is used. To overcome this restriction, we propose a remote control system using the internet, the system which runs on the Window 95 environment is composed of the remote client which transfers commands to the server which control and manage the manipulator in the factory. In the control of Hong-ik Direct Drive Arm, it is necessary to consider the complex nonlinear parameters causing the mutual interaction between joints, so we use two TMS320C31 DSP chips in the controller for the real time dynamic control algorithms. For the test of system integrity and the verification of the mathematical modeling, we apply CTM, PD and VSS control algorithms and the simulation results are satisfactory.

  • PDF

ASIC design of high speed CAM for connectionless server of ATM network (ATM망의 비연결형 서버를 위한 고속 CAM ASIC 설계)

  • 백덕수;김형균;이완범
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.22 no.7
    • /
    • pp.1403-1410
    • /
    • 1997
  • Because streaming mode connection server suitable to wide area ATM networks performs transmission, reception and lookup with time restriction for the transmission time of a cell, it has demerits of large cell loss incase that burst traffic occurs. Therefore, in this paper to decrease cell loss we propose a high speed CAM (Content Addressable Memory) which is capable of processing data of streaming mode connections server at a high speed. the proposed CAM is applied to forwarding table VPC map which performs function to output connection numbers about input VPI(Virtual Path Identifier)/VCI(Virtual Channel Identifier). The designed high speed CAM consist of DBL(Dual Bit Line) CAM structure performed independently write operation and match operation and two-port SRAM structure. Also, its simulation verification and full-custom layout is performed by Hspice and Composs tools in 0.8 .$\mu$m design rule.

  • PDF

Automatic Work Time Evaluation Based on a Verification of Disassemblability and Assembly Configuration (분해도 및 조립형상 정보를 이용한 작업시간 산정에 관한 연구)

  • Shin, Chul Kyun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.3
    • /
    • pp.355-363
    • /
    • 2007
  • This paper presents a method of an automatic work time evaluation based on the verification of a disassemblability and assembly configuration. Even though a work time evaluation is an important field of concern for planning assembly lay-out, there are some limitations using cumbersome user query or approximated work time data without considering assembly condition. To overcome such restriction, this paper presents a method to mathematically verify assembly conditions based on the disassemblability, which is defined by the separability and stability cost. The separability cost represents a facility of the part disassembly operation, and the stability cost which represents a degree of the stability for the base assembly motion. Based upon the results, we propose a new approach of evaluating work time using neural networks. The proposed method provides an effective means of solving the work time evaluation problem and gives a design guidance of planning assembly lay-out in flexible manufacturing application. Example study is given to illustrate the concepts and procedure of the proposed schemes.

A Study on the Annealing of High Tensile Strength Steel for Automobile (자동차용 고장력 강판의 열처리에 관한 연구)

  • 박범식
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1999.10a
    • /
    • pp.530-535
    • /
    • 1999
  • In recently, annealing process of cold rolled sheet tend to change to continuous annealing process for improving quality, saving yield. In the meantime as demand for various kind and small lot of products has been increasing, batch annealing has been appreciated for its small restriction for the operation. So, we tested on the effect for the proper heating temperatures, heating time of cycle, cooling time and total cycle time in this annealing process of hi tensile strength steel for automobile. As a result of several investigation. we confirmed for the following characteristics; In this process, we knew that 68$0^{\circ}C$ is suitable for this heating temp. cycle heating time of 38 Hr, cooling time of 31 Hr and total cycle time of 70 Hr. Still more, we could know that it is proper for cold rolling before annealing to be managed by 7 pass because of the act on high pressure.

  • PDF

RESEARCH OF COMMUNICATION SCHEDULING BETWEEN COMPUTER I/O AND S/W FOR ACQUISITION OF SATELLITE SENSORED DATA

  • Koo, Cheol-Hea;Park, Su-Hyun;Kang, Soo-Yeon;Yang, Koon-Ho;Choi, Sung-Bong
    • Proceedings of the KSRS Conference
    • /
    • v.1
    • /
    • pp.196-199
    • /
    • 2006
  • Various communication mechanisms have been developed to acquire a meaningful data from sensors. The key requirement during the sensor data acquisition is determinism and reduction of time dependency. It is a fundermental level of satellite data management for controlling satellite operation software data acquisition from sensors or subsystem. Satellite operation software has various software modules to be operated in addition to data acquisition. Therefore, unnecessary time delay shall be minimized to perform the data acquisition. As the result, interrupt method might be prefered than polling method because the former can decrease the restriction of design during implementation of data acquisition logic. The possible problems while using interrupt method like as interrupt latency caused by delaying of interrupt processing time are analyzed. In this paper, communication mechanism which can be used to interface with satellite computer and subsidary subsystem by using interrupt is presented. As well, time dependency between software scheduling and data acquisition is analyzed.

  • PDF