• Title/Summary/Keyword: operation test

Search Result 5,241, Processing Time 0.039 seconds

A Thermal Performance Analysis on the Operation Modes of Radiant Floor Heating System Using SERI-RES (SERI-RES를 이용한 Radiant Floor Heating System의 열 성능 분석)

  • Chun, Won-Gee;Jeon, Myung-Seok;Auh, P.Chung-Moo
    • Solar Energy
    • /
    • v.11 no.2
    • /
    • pp.29-33
    • /
    • 1991
  • The present paper deals with two types of heating methods widely used for the Radiant Floor heating systems in Korea. Of these, one method circulates hot water according to the predefined schedule ("intermittent heating") while the other runs the system with the aid of thermostats ("continuous heating"). The standard version of SERI-RES has been modified for the numerical simulation of the problem. Preliminary results show relatively large temperature swings in the case of intermittent heating with solar availability. On the other hand, the case of continuous heating would avoid such undesirable temperature fluctuations. These results are also verified by experimental evaluations.

  • PDF

A Model for Real-time Reservoir Operations during Flood Period.II : Single Reservoir Operating Rules at Daecheong Dam (홍수기중의 실시간 저수지운영 모형(II) - 대청댑의 단일저수지 운영 방안 -)

  • 심명필;박인보
    • Water for future
    • /
    • v.23 no.4
    • /
    • pp.499-507
    • /
    • 1990
  • Real-time reservoir operation models during flood period require optimization of hourly releases from the input data through on-line system. And predicted values. An algorithm of the simulation model to resolve the problem has already been reported with formulation of objectives to minimize the flood damage in downstream reaches and to conserve water at the end of operation for the later use. This paper presents an application of the model to a single reservoir system at the Daecheong Dam during flood and the results are reviewed. This paper also reviews measured inflows and releases in the past. The model is applied to the flood hydrographs of several return periods assuming different reservoir levels at the beginning of the operation. Also it demonstrates the simulation of test run with inflow forecasts obtained by rainfall-runoff model and compares the results. As a result, the model can use efficiently the flood control capacity with consideration of risk factor for the uncertainties associated with inflow forecasts.

  • PDF

Optimal Cooling Operation of a Single Family House Model Equipped with Renewable Energy Facility by Linear Programming (신재생에너지 단독주택 모델 냉방운전의 선형계획법 기반 운전 최적화 연구)

  • Shin, Younggy;Kim, Eui-Jong;Lee, Kyoung-ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.12
    • /
    • pp.638-644
    • /
    • 2017
  • Optimal cooling operation algorithm was developed based on a simulation case of a single family house model equipped with renewable energy facility. EnergyPlus simulation results were used as virtual test data. The model contained three energy storage elements: thermal heat capacity of the living room, chilled water storage tank, and battery. Their charging and discharging schedules were optimized so that daily electricity bill became minimal. As an optimization tool, linear programming was considered because it was possible to obtain results in real time. For its adoption, EnergyPlus-based house model had to be linearly approximated. Results of this study revealed that dynamic cooling load of the living room could be approximated by a linear RC model. Scheduling based on the linear programming was then compared to that by a nonlinear optimization algorithm which was made using GenOpt developed by a national lab in USA. They showed quite similar performances. Therefore, linear programming can be a practical solution to optimal operation scheduling if linear dynamic models are tuned to simulate their real equivalents with reasonable accuracy.

Menopausal Symptoms and Associated Factors in Breast Cancer Patients Receiving Hormone Therapy (항호르몬요법을 받는 유방암 여성의 갱년기 증상과 연관 변인간의 분석)

  • Kim, Younglan;Min, Yul Ha
    • Journal of Korean Clinical Nursing Research
    • /
    • v.23 no.1
    • /
    • pp.120-129
    • /
    • 2017
  • Purpose: The purpose of this study was to identify the degree of menopause symptoms and associated factors in patients with breast cancer who were receiving hormone therapy. Methods: Data were collected with questionnaires from 150 patients with breast cancer who had been on hormone therapy at a hospital in Seoul. Data were analyzed with the t-test, ANOVA, and Pearson correlation coefficient to compare the degree of menopause symptoms by demographic, clinical and psychological factors. Results: The mean menopause symptoms score was $13.39{\pm}7.97$. Most participants reported having hot flushes and sweating (75.3%), physical and mental exhaustion (82.7%) and sexual problems (64.7%). Menopause symptoms and depression were correlated with each other (p<.01). Somato-vegetative symptoms were different significantly by age, menopausal status at time of operation, occupation and tumor. Psychological symptoms were different significantly by marital status, operation type and chemotherapy. Urogenital symptoms were different significantly by prior history of cancer, occupation, operation type and radiation therapy. Conclusion: These findings can be used to provide tailored nursing interventions by identifying high risk groups for menopausal symptom among breast cancer patients receiving hormone therapy.

Development of Non-Electric and Delay-Type Explosive Bolt (비전기식 지연형 폭발볼트 개발)

  • Lee YeungJo;Kim DongJin
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.9 no.3
    • /
    • pp.60-65
    • /
    • 2005
  • The present work has developed non-electric and delay-type explosive bolt that does not need electric power supply device and has the delay function in the operation. Non-electric power supply system enables separation device system to be minimized. In order to prove the mechanism of the operation, the power of air resistance caused from aviation object used to ignite the initiator. we can be founded from the present work that the changes in the operation load influence directly the ignition of the initiator. The design of non-electric and delay type of explosive bolt is the most suitable for the separation system that is necessary to reduce the velocity of aviation object and safe landing of parachute system.

Mechanical and Electrical Performance of Anode-Supported Solid Oxide Fuel Cells during Thermal Cyclic Operation (열 사이클에 따른 고체산화물 연료전지의 기계적 및 전기적 특성)

  • Yang, Su-Yong;Park, Jae-Keun;Lee, Tae-Hee;Yu, Jung-Dae;Yoo, Young-Sung;Park, Jin-Woo
    • Journal of the Korean Ceramic Society
    • /
    • v.43 no.12 s.295
    • /
    • pp.775-780
    • /
    • 2006
  • Mechanical and electrical performance of anode-supported SOFC single cells were analyzed after thermal cyclic operation. The experiments of thermal cyclic cell-operation were carried out four times and performance of each cell was measured at different temperatures of 650, 700, and $750^{\circ}C$, respectively. As increasing the number of thermal cycle test, single cells showed poor I-V characteristics and lower 4-point bending strength. The anode polarization was also measured by AC-impedance analysis. The observation of the microstructure of the anodes in single cells proved that the average particle size of Ni decreased and the porosity of anode increased. It is thought that the thermal cycle caused the degradation of performance of single cells by reducing the density of three-phase boundary region.

Prediction and Measurement of Induction Phenomena in the 765 kV Double Circuit Transmission Line operated with two voltage grades (765 kV 송전선로에서의 이종 전압등급 병행 운전시의 유도현상 예측 및 실측 결과)

  • Kwak, J.S.;Kang, Y.W.;Shim, E.B.;Jeon, M.R.;Woo, J.W.;Bang, H.G.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.208-211
    • /
    • 2003
  • The western route of KEPCO's 765 kV transmission line has been tentatively operating as 345 kV voltage before commercial operation. KEPCO decided to operate the 765 kV line for commercial operation after completing the test operation of 765 kV substation in 2002. In the process of energizing the line as 765 kV voltage, double circuit transmission line will be operated with two voltage grades of 765 kV and 345 kV. As the earthing switches are installed on both ends of the line, electrostatic induction voltage and electromagnetic induction current were calculated prior to the line energizing in order to confirm the ratings. The induced voltage and current are important for the maintenance of the parallel circuit. This paper presents the simulation results of electrical phenomena such as electrostatic induction voltage and electromagnetic induction current from the parallel line. The transmission line was modeled by EMTP (Electro-Magnetic Transient Program). The simulation results were compared with the measured results at the field.

  • PDF

Performance Optimization of High Specific Speed Pump-Turbines by Means of Numerical Flow Simulation (CFD) and Model Testing

  • Kerschberger, Peter;Gehrer, Arno
    • International Journal of Fluid Machinery and Systems
    • /
    • v.3 no.4
    • /
    • pp.352-359
    • /
    • 2010
  • In recent years, the market has shown increasing interest in pump-turbines. The prompt availability of pumped storage plants and the benefits to the power system achieved by peak lopping, providing reserve capacity, and rapid response in frequency control are providing a growing advantage. In this context, there is a need to develop pumpturbines that can reliably withstand dynamic operation modes, fast changes of discharge rate by adjusting the variable diffuser vanes, as well as fast changes from pumping to turbine operation. In the first part of the present study, various flow patterns linked to operation of a pump-turbine system are discussed. In this context, pump and turbine modes are presented separately and different load cases are shown in each operating mode. In order to create modern, competitive pump-turbine designs, this study further explains what design challenges should be considered in defining the geometry of a pump-turbine impeller. The second part of the paper describes an innovative, staggered approach to impeller development, applied to a low head pump-turbine project. The first level of the process consists of optimization strategies based on evolutionary algorithms together with 3D in-viscid flow analysis. In the next stage, the hydraulic behavior of both pump mode and turbine mode is evaluated by solving the full 3D Navier-Stokes equations in combination with a robust turbulence model. Finally, the progress in hydraulic design is demonstrated by model test results that show a significant improvement in hydraulic performance compared to an existing reference design.

Operational Strategy for a BESS-based Microgrid (BESS 기반 마이크로그리드 운영전략)

  • Lee, Ha-Lim;Chun, Yeong-Han
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.12
    • /
    • pp.1666-1672
    • /
    • 2015
  • Small islands are quite adequate places where microgrid system with renewable sources can replace diesel engines as operation costs of diesel engine in most small islands are very high. To get the large amount of renewable energy, the microgrid system has very large capacity of renewable sources. The system with large capacity of renewable sources can meet the case when supplied energy is greater than the load and the fluctuation of source output is very large. The battery energy storage system can be a solution to stabilize the system with large capacity of renewable sources. In this case, BESS can be utilized as a master source for the synchronous operation of all sources including diesel engine, wind turbine and PV. The diesel generators can be used as a backup in case the BESS SOC goes below a certain level. In this paper, we suggest a novel unit commitment of diesel generators and operation schedule of pump for water supply service with the information of wind forecast, PV forecast, and load forecast. The proposed methods has been implemented and tested at the test bed in Gasa-Island.

Current overshoot operation of a REBCO magnet to mitigate SCF

  • Lee, Changhyung;Hahn, Seungyong;Bang, Jeseok;Cho, Jeonwook;Kim, Seokho
    • Progress in Superconductivity and Cryogenics
    • /
    • v.20 no.4
    • /
    • pp.65-69
    • /
    • 2018
  • Due to large in-field current carrying capacity and strong mechanical strength, a REBCO wire has been regarded as a viable high temperature superconductor (HTS) option for high field MRI and > 1 GHz (>23.5 T) NMR magnets. However, a REBCO magnet is well known to have an inherent problem of field inhomogeneity, so-called 'Screening Current induced magnetic Field (SCF)'. Recently, 'field shaking' and 'current overshoot operation' techniques have been successfully demonstrated to mitigate the SCF and enhance the field homogeneity by experiments. To investigate the effectiveness of current overshooting operation technique, a numerical simulation is conducted for a test REBCO magnet composed of a stack of double pancake coils using '2D edge-element magnetic field formulation' combined with 'domain homogenization' scheme. The simulation result demonstrates that an appropriate amount of current overshoot can negate the SCF. To verify the simulation results, current overshoot experiments are conducted for the REBCO magnet in liquid nitrogen. Experimental results also demonstrate the possible application of current overshoot technique to mitigate the SCF and enhance the field homogeneity.