The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.9
/
pp.1398-1405
/
2015
Domestic railway communication in Korea has been introduced for mutual communications among control center, operation staffs, and maintenance staffs. It has been mainly used as railway disaster and safety functions from VHF and UHF from 1980’s and TRS-Astro and TRS-Tetra from the 2000’s. Recently for urban railways communications, 18GHz and 2.4GHz ranges have been utilized for image transmissions and control command communications, respectively. This paper analyzes technical development of LTE-R, LTE communication for Railways, that has been designed as a single integrated railway wireless network in order to merge the current various communication systems. In this paper, we present the details of the examination of the LTE-R test-bed using 2.6GHz test frequency in Daebul test line through CW test and optimization test.
Park, Kang-Kyun;Choi, Hyun-Chul;Kim, Dong-Man;Kim, Dong-Hyun;Ahn, Oh-Sung
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2009.04a
/
pp.593-598
/
2009
In this study we present results for the design of ground test system for 4 degree of freedom(DOF) control test is one of the smart UAV ground test. This system is equipped with real smart UAV and Z direction DOF and 3 direction rotation DOF, Ensuring safe operation of the Smart UAV is a top priority. To this end, it is required to do structure analysis and test verification to confirm the design margin and safety. Based on the analysis, the ground test system has been redesigned to meet the structural conditions.
Seo, Seok-Bae;Kim, Su-Jin;Koo, In-Hoi;Ahn, Sang-Il
Proceedings of the KSRS Conference
/
2007.10a
/
pp.544-547
/
2007
Because data processing systems in recent years are more complicated, main function of the data processing is divided as several sub-functions which are implemented and verified in each subsystem of the data processing system. For the verification of data processing system, many interface tests among subsystems are required and also a lot of simulation systems are demanded. This paper proposes CTHS (Common Test Harness System) for satellite ground segment development which has all of functions for interface test of the data processing system in one PC. Main functions of the CTHS software are data interface, system log generation, and system information display. For the interface test of the data processing system, all of actions of the CTHS are executed by a pre-defined operation scenario which is written by purpose of the data processing system test.
The cryogenic test facility is developed for test of deep groove ball bearings, floating ring seals, materials (steel & copper) for High Pressure Turbopump of liquid rocket engine (LRE). The cryogenic bearing test is performed to evaluate the flow rate of cooling water and the load-carrying capacity of bearings. The cryogenic seal test is performed to evaluate the determination of magnitude of leakages through the seal, a time variation of this magnitude. The test of the materials Pair is performed to evaluate its fitness for operation in the liquid oxygen medium.
The 150 gal Ion EFT(External Fuel Tank) used to enlarge the aircraft operation range was adopted an import equipment in T-50 FSD phase. But in Production phase the EFT was planed to develop for the stable ILS(Integrated Logistics Support) and technical ability improvement by using the composite materials. The design for configuration and fuel system is intended to maintain compatibility with aircraft systems and the development test is performed on component, assembly and aircraft. This study is conducted to provide the technology of design and test for the 150 gallon composite EFT in LRU level. The test results show that the composite EFT is satisfied with structural, functional and environment requirements which are described in specification.
International Journal of Reliability and Applications
/
v.11
no.1
/
pp.55-67
/
2010
There has been a recent upsurge in demand for the improvement of car reliability in the Northern American which is the primary market of South Korea automobile industry. It has been required that the warranty for transmission control unit for passenger cars directly related to passenger safety or security should be extended for 10 years and 160,000 km. In this paper, the test method for reliability and evaluation criteria is presented to evaluate the reliability on the automatic transmission controller. Reliability certification test can be roughly divided into two types: a quality test and life assessment test and a quality test can be subdivided into a basic performance test and environmental resistance test. There are 3 types of tests on the performance test for automatic transmission controller and environmental resistance test is composed of 14 items. Life test is performed with only the product passed this quality test. In this study, operation limit test at the high-temperatures, accelerated life test under specific temperature and accelerated life test for 2 or 3 stress levels are shown as a way for life test.
Superconducting fault current limiter (SFCL) is an power device of a novel concept. While SFCLs generate no ohmic loss during the operation carrying normal currents, they can limit fault currents very fast making large impedance by their quench characteristics. In 2006, KEPCO has developed a distribution class hybrid type SFCL by a collaborative research project with LS industrial systems. The SFCL has merits in practical and economical points of view. In the SFCL, the superconductor just plays a role of a fault detector and the current limiting is completed by the other current limiting element made of normal metals throu호 the line commutation. As a result, the required amounts of superconductors can be reduced considerably. Consequently, the hybrid SFCL can be fabricated with small size and cost, maintaining perfect current limiting performance. Currently, KEPCO is carrying out a research project at Gochang power test center for the purpose of the verification test of the 22.9 kV/ 630 A class SFCL for the practical application in real grid. Through the project, a long term operational test and fault current test will be done. In this paper, the back ground of development and installation of the SFCL will be explained and the operation plan of the SFCL for the verification test is also introduced.
In this study, in order to understand contents and ranges of design for the EGR Valve test system for improving quality and performance of EGR Valve, engine performance and exhaust gas characteristic of 3L-class diesel engine was analyzed. Experimental operation of engine performance test was performed with 50% engine load and 20% and 100% opening ratio of EGR Valve. From test of performance and exhaust gas characteristic of engine, torque output of engine and temperature and pressure of inlet and outlet of EGR Valve were measured. As a result, for design of EGR Valve test system, input fluid flow of EGR Valve must be set the same amount with exhaust gas flow that was below of engine speed of 2,500 rpm, and temperature of inlet of EGR Valve must be set under about $510^{\circ}C$. And the difference of temperature between inlet and outlet of EGR Valve must be over than about $200^{\circ}C$. Exhaust gas of inlet and outlet of EGR Valve were under 1 bar that was not considerable, and the difference of pressure between inlet and outlet of EGR Valve were under 1 bar that could not effect on mechanical operation of EGR Valve.
The Transactions of the Korea Information Processing Society
/
v.4
no.7
/
pp.1900-1906
/
1997
In this paper, the efficient BILBO(named EBILBO) is designed for BIST that is able to batch the testing when circuit is designed on FPGA. The proposed algorithm of batch testing is able to test the normal operation speed with one-pin-count that can control all part of large and complex circuit. PRTPG is used for the test pattern and MISR is used for PSA. The proposed algorithm of batch testing is VHDL coding on behavioral description, so it is easily modified the model of test pattern generation, signature analysis and compression. The EBILBO's area and the performance of designed BIST are evaluated with ISCAS89 benchmark circuit on FPGA. In circuit with above 600 cells, it is shown that area is reduced below 30%, test pattern is flexibly generated about 500K and the fault coverage is from 88.3% to 100%. EBILBO for the proposed batch testing BIST is able to execute concurrently normal and test mode operation in real time to the number of $s+n+(2^s/2^p-1)$ clock(where, in CUT, # of PI;n, # of register, p is order # of polynomial). The proposed algorithm coded with VHDL is made of library, then it well be widely applied to DFT that satisfy the design and test field on sme time.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.