• Title/Summary/Keyword: operation test

Search Result 5,241, Processing Time 0.035 seconds

An estimation method for the maintenance timing of the infiltration trench (침투도랑 시설의 유지관리 시점 산정방법에 관한 연구)

  • Lee, Seung Won;Cha, Sung Min
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.1
    • /
    • pp.29-35
    • /
    • 2020
  • To manage the non-point source pollution and restore the water circulation, many technologies including infiltration or reservoir systems were installed in the urban area. These facilities have many problems regarding maintenance as their operation period becomes lengthier. The purpose of this study was to estimate the optimal maintenance timing through a long-term load test on the infiltration trench as one of the low impact development techniques. An infiltration trench was installed in the demonstration test facility, and stormwater was manufactured by Manual on installation and operation of non-point pollution management facilities from the Ministry of Environment, Korea and entered into the infiltration trench. Particle size distribution (PSD), suspended solids (SS) removal efficiency, and infiltration rate change tests were performed on inflow and outflow water. In case of the PSD, the maximum particulate size in the outflow decreased from 64 ㎛ to 33 ㎛ as the operating duration elapsed. The SS removal efficiency improved from 97 % to 99 %. The infiltration rate changed from 0.113 L/sec to 0.015 L/sec during the operation duration. The maintenance timing was determined based on the stormwater runoff requirements with these changes in water quality and infiltration rate. The methodologies in this study could be used to estimate the timing of maintenance of other low impact development techniques.

A study on performance test of water heat storage type heat-pump system using cooling tower heat source (냉각탑을 이용한 축열식 히트펌프시스템의 성능측정에 관한 연구)

  • Lee, Sang-Hoon;Park, Hyo-Sik;Han, Woo-Yong;Kim, Uk-Jung
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1099-1104
    • /
    • 2008
  • Recent year, mean energy consumptions of a people are higher than other country. And international oil price became over 120 dollar. This energy environment as well as energy war. Maybe, the Meteorological Administration is going to enforce scorching heatwave special report system from that come summer. Besides, 2008 summer, maximum demand power is expected by 64,240,000kW. The electric power equipment reserve rate appeared in to keep 12.5% level. Chilled water storage system witch is one of electric load administration system. Heat pump system used cooling tower heat recovery is advantage that use is possible to summer in small a public bath building. In this paper, we suggest that heat pump system by heat recovery using cooling tower when it is heating operation of ambient air temperature. To apply cooling tower heat recovery heat pump to chilled water heat storage type and achieved performance evaluation about operation. As a result, performance of heat pump system that about 121% in cooling mode, 138% in heating mode higher than KEPCO standard. And heating operation possible to ambient air temperature about $23^{\circ}C$, which of appear cooling tower outlet temperature about $13^{\circ}C$.

  • PDF

Perception of Kindergarten Directors regarding the Prerequisite for Inclusive Education and its Improvement Plans (통합교육의 전제조건과 개선방안에 대한 유치원장의 인식)

  • JANG, Jin-Hee
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.6
    • /
    • pp.1683-1694
    • /
    • 2016
  • This study aims to investigate perception of kindergarten directors regarding prerequisites for inclusive education and its improvement plans, and to establish basic data required for future implementation of inclusive education in kindergartens. This study was carried out oriented to 116 kindergarten directors and inquired into the differences in background characteristics of age, education level, operation career, major, special/inclusive education training and operation of inclusive classes, based on SPSS 1.5 for Window, independent sample t-test and Chi-square test. The research results of this study are as follows: Firstly, as for the perception of kindergarten directors as prerequisite of inclusive education, they show active supports for inclusive education and recognize that classes composed of the same age and same ability are the advisable forms of inclusive education. As for class operations, they perceive that inclusive classes based on small group activities and full inclusive classes are suitable. Moreover, as qualified teachers for inclusive classes, they manifest that teachers who completed special/inclusive education training are appropriate. Secondly, as for the perception of kindergarten directors regarding improvement plans for inclusive education, this study suggests that they prioritize the training operation regarding inclusive education oriented to general infants and parents. As for vitalization of inclusive education, they find that financial supports at the national level and administrative supports for facilities are indispensable.

Development of a Tele-Rehabilitation System for Outcome Evaluation of Physical Therapy

  • Park, Hyung-Soon;Lee, Jeong-Wan
    • Journal of Biomedical Engineering Research
    • /
    • v.29 no.3
    • /
    • pp.179-186
    • /
    • 2008
  • This paper presents a portable tele-assessment system designed for remote evaluation of the hypertonic elbow joint of neurologically impaired patients. A patient's upper limb was securely strapped to a portable limb-stretching device which is connected through Internet to a portable haptic device by which a clinician remotely moved the patient's elbow joint and felt the resistance from the patient. Elbow flexion angle and joint torques were measured from both master and slave devices and bilaterally fed back to their counterparts. In order to overcome problems associated with the network latency, two different tele-operation schemes were proposed depending on relative speed of tasks compared to the amount of time delay. For slow movement tasks, the bilateral tele-operation was achieved in real-time by designing control architectures after causality analysis. For fast movement tasks, we used a semi-real-time tele-operation scheme which provided the clinicians with stable and transparent feeling. The tele-assessment system was verified experimentally on patients with stroke. The devices were made portable and low cost, which makes it potentially more accessible to patients in remote areas.

Factors Influencing Body Temperature in Elderly Surgical Patients (가온요법을 받은 노인 수술 환자의 체온과 영향요인)

  • Kwon, Mi Hee;Byeon, Young Soon
    • Journal of Korean Academy of Fundamentals of Nursing
    • /
    • v.20 no.2
    • /
    • pp.108-117
    • /
    • 2013
  • Purpose: The purpose of this study was to identify the factors that affect body temperature in elderly operation patients using a warming method and to examine differences in post operative body temperature by characteristics of the patients. Methods: Data were collected from 200 patients, aged 65 years or more undergoing surgery with a warming method. The data were analyzed using descriptive statistics, t-test, ANOVA, Scheffe's test and multiple regression with the SPSS 18.0 Program. Results: The mean score for body temperature of elderly operation patients using a warming method after surgery was $36.1{\pm}0.6^{\circ}C$ including 74 patients with hypothermia and 126 patients with normal body temperature. The body temperature according to general characteristics differed by age and whether the surgery was emergency surgery or not. The body temperature according to surgery-related factors differed by anesthesia type, length of operation, anesthesia time, magnitude of surgical procedure, amount of fluid, transfusion requirements, and preoperative body temperature. Factors influencing body temperature were age, BMI, transfusion requirements and preoperative body temperature. Conclusion: The results indicate that age, BMI, transfusion requirements and preoperative body temperature significantly influenced on body temperature after surgery. Thus preoperative body temperature needs to be maintained through pre-warming as a nursing intervention.

Effect of the Mixture of Thrombin Powder and Gelfoam Powder on Control of Exposed Cancellous Bone Bleeding (Thrombin Powder와 Gelfoam Powder의 혼합물을 이용한 노출된 망상골면 출혈의 지혈효과)

  • Park, Sung Wan;Cho, Ha Young;Lee, Seung Myoung;Jeong, Seong Hun;Song, Jin Kyu;Jang, Suk Jung;Shin, Ho
    • Journal of Korean Neurosurgical Society
    • /
    • v.29 no.5
    • /
    • pp.664-667
    • /
    • 2000
  • Objective : Excessive bleeding from the exposed cancellous bone surface may cause serious problem such as hematoma formation, infection, transfusion reaction during operation and postoperative period. There are several kinds of bleeding control agent on the cancellous bone surface including bone wax, gelatin sponge ($Gelfoam^{(R)}$), oxidized cellulose($Oxycel^{(R)}$, $Surgicel^{(R)}$), thrombin, microfibrillar collagen($Avitene^{(R)}$) etc. In the past, bone wax was used to control bone bleeding but it is associated with increased infection rate and fusion failure. Recently, gelfoam paste has been used to control cancellous bone bleeding. We controlled the cancellous bone bleeding with the mixture of gelfoam powder and thrombin powder. Material and Methods : Seventeen patients of posterior fusion on the 4 motion segments of thoracolumbar spine were selected to compare the result of bone bleeding control. In the test group of 9 patients, the cancellous bone bleeding was controlled with the mixture of Gelfoam and thrombin powder during operation. In the control group of 8 cases, no chemical hemostatic agent was used to manage the bone bleeding during operation. We calculated the total amount of bleeding from cancellous bone surface during and after operation in the two groups and compared their statistic significance of the result which was judged by student t-test. Results : The average amount of intraoperative bleeding was 1825ml in control group, 811ml in test group(p<0.01). The amount of postoperative bleeding was 943ml in control group and 812ml in test group, there were no significant difference in the amount of bleeding during postoperative period between two groups(p>0.5). Total amount of blood was decreased in as much as 1150ml in test group(p<0.01). Conclusion : We concluded that the application of the mixture of thrombin and gelfoam powder on the cancellous bone surface is the effective control method of cancellous bone bleeding for multilevel posterior spinal fusion.

  • PDF

[Retracted]Case Study of Microseismic Monitoring System Installation based on Underground Mine Communication System ([논문철회]지하광산 갱내통신 기반 미소진동 모니터링 체계 구축 사례)

  • Heo, Seung;Choi, Yongkun
    • Tunnel and Underground Space
    • /
    • v.32 no.2
    • /
    • pp.120-130
    • /
    • 2022
  • In this study, the applicability of the microseismic monitoring system based on the underground mine communication system has been verified by operation test in the domestic underground mine. The microseismic data consists of wavelet data and meta-data for mine safety management, and both data should be transferred, stored, analyzed and managed with proper method according to the purpose and size of each data. In order to select the optimal communication system for the microseismic monitoring system considering the underground environment as well as properties of data, various types of communication system have been tested and compared during operation test after installing the optical cable communication system, 2.4 GHz and 900 MHz wireless communication system through the underground mine tunnel and overground area of the test site. The integrated microseismic monitoring software, which was developed to secure the stability of data management and ease of use, has been updated according to findings from operation test. Through the operation test of the microseismic monitoring system including the communication system and the monitoring software, the technical basis was established corresponding to various requirements of the domestic mine for adoption of the microseismic monitoring system.

The measurement and evaluation of catenary system by using electric rolling stock on Honam-Line electrified (전철화된 호남선에서의 전기차량에 의한 전차선로 측정 및 평가)

  • Ahn Young-Hoon;Hyun Chung-il
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1286-1291
    • /
    • 2004
  • This paper was showed evaluation method and technical items for measurement test of new catenary system of Honam(Daejeon - Mokpo) conventional railway electrified. This line have tested by three type new electric rolling stocks in order to test construction quality and operation safety of a new catenary system with speed-up than conventional speed. We have some important experiences through measurement test of catenary system by new device installed on train roof.

  • PDF

A Development of DC-DC Converter for the Reading Lamp of TGV-Korea (고속 철도(TGV-Korea) 조명용 DC-DC 컨버터의 개발)

  • 김성일;김희준;김희일
    • Proceedings of the KIPE Conference
    • /
    • 1999.07a
    • /
    • pp.635-638
    • /
    • 1999
  • Manufacturing TGV-Korea, international standards and TGV-standards should be strictly applied in order to insure the normal operation and the safety of passengers in a train service. This paper presents a development of 800W DC-DC converter for the reading lamp of TGV-korea. The converter is designed for satisfying the regulations of international standards and TGV-standards regarding the burning-in test, the vibration test, the electro-magnetic emissions test, etc. As an experimental result, the maximum efficiency is obtained as 92.3[%] at normal input voltage and output power.

  • PDF

The countermeasure for the Vibration Problem of Turbo Chiller (300RT) (300RT급 터보냉동기 진동원인 분석 및 해결방안)

  • 김관영;홍제민;배종국
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.184-188
    • /
    • 2001
  • Severe vibration was detected during test operation in motor frame of the Turbo Chiller (300RT). To identify the vibration problem, vibration measurement and modal test were carried out. From the test results, it is concluded that the severe vibration occurred due to the resonance between the motor frame horizontal mode and the motor excitation frequency. Therefore the horizontal mode of the frame could be controlled by the sensitivity analysis results for the length of the supporting plate.

  • PDF