Journal of the Korea Society of Computer and Information
/
v.24
no.5
/
pp.41-47
/
2019
A BIS(Bus Information System) collects, processes and analyzes information such as real-time location and operation status during bus operation. And It is a system that provides valid information to citizens, drivers, traffic centers and bus companies. Transport information system sent by an each bus is collected through GPS(Global Positioning System), DSRC(Dedicated Short Range Communications), Beacon and passed to transport information center. BIS data by collected is handled and analyzed. Next, it is transmitted to citizen, drivers and bus companies in real time. The result of 5 times simulation satisfied the test criteria(error range ${\pm}10m$) with an average error range of 3.306m, and the reliability is increased. In this paper, we propose a improved location transfer component that can provide users to quicker and more accurate location information than existing BIS using GPS of smart phone. It can be seen that reliability is improved by securing improved bus position data.
The paper gives the results of the experiments with a model two-section REBCO solenoid cooled by either gaseous helium (GHe) or sub-cooled/solid nitrogen (SN2) in (50-77) K temperature range. The major cooling source was a single-stage cryocooler Sumitomo CH-110 with the cooling power of 175 W and 130 W at 77 K and 50 K respectively. The coil itself was not directly conduction cooled. We compare the time taken by both coolants to obtain the temperature of the magnet of about 50 K and the homogeneity of the temperature distribution within the cryostat. Test results for the coil operation in solid nitrogen together with the comparison of its critical properties in SN2 and GHe are also presented.
Journal of information and communication convergence engineering
/
v.20
no.4
/
pp.317-325
/
2022
In this study, we propose a technological system designed to provide machine vision-based automatic inspection and autonomous operation services for an entire process related to product inspection in wire harness manufacturing. The smart factory paradigm is a valuable and necessary goal, small companies may encounter steep barriers to entry. Therefore, the best approach is to develop towards this approach gradually in stages starting with the relatively simple improvement to manufacturing processes, such as replacing manual quality assurance stages with machine vision-based inspection. In this study, we consider design issues of a system based on the proposed technology and describe an experimental implementation. In addition, we evaluated the implementation of the proposed technology. The test results show that the adoption of the proposed machine vision-based automatic inspection and operation service system for multi-wire harness production may be considered justified, and the effectiveness of the proposed technology was verified.
International conference on construction engineering and project management
/
2009.05a
/
pp.388-392
/
2009
Operation of LNG (Liquefied Natural Gas) plants requires an effective maintenance strategy. To this end, the long-term and short-term trend of faults, such as mechanical and electrical troubles, should be identified so as to take proactive approach for ensuring the smooth and productive operation. However, it is not an easy task to predict the fault trend in LNG plants. Many variables and unexpected conditions make it quite difficult for the facility manager to be well prepared for future faulty conditions. This paper presents a model to predict the fault trend in a LNG plant. ARIMA (Auto-Regressive Integrated Moving Average) model is combined with Wavelet Transform to enhance the prediction capability of the proposed model. Test results show the potential of the proposed model for the preventive maintenance strategy.
Sin, Yong-No;Maeng, Seung-Jin;Go, Ik-Hwan;Lee, Hwan-Gi
Journal of Korea Water Resources Association
/
v.33
no.6
/
pp.745-755
/
2000
The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.
Kim, Yong-Joo;Lee, Dae-Hyun;Chung, Sun-Ok;Park, Seung-Jae;Choi, Chang-Hyun
Journal of Biosystems Engineering
/
v.36
no.4
/
pp.243-251
/
2011
Purpose of this study was to analyze power requirement of an agricultural tractor for baler operation. First, a power measurement system was developed and installed in a 75 kW agricultural tractor. Strain-gages with a telemetry system were used to measure torques of transmission and PTO input shafts. An engine tachometer was used to measure rotational speed of transmission and PTO input shafts. The measurement system also included pressure sensors to measure pressure of hydraulic pumps, an I/O interface to acquire the sensor signals, and an embedded system to determine power requirements. Second, field experiments were conducted at two PTO speed levels, and proportion of utilization ratio of rated engine power and power consumption of major parts (transmission input shaft, PTO input shaft, main hydraulic pump, and auxiliary hydraulic pump) were analyzed. Results of usage proportion of engine power for PTO speed level 1 and 2 were 4.1 and 2.2%, 31.5 and 16.3%, 49.6 and 59.7%, 14.4 and 20.8%, and 0.4 and 1.0%, respectively, for ratio of measured engine power to rated engine power of less than 25%, 25 ~ 50%, 50 ~ 75%, 75 ~ 100%, and greater than 100%. The results showed that the usage proportion increased in the range with the ratio of power requirement to rated engine power of over than 50% when the PTO gear was shifted from P1 to P2. Averaged engine power requirement for baling operation, tying and discharging operation, and total operation were 43.3, 37.3, and 42.0 kW and 49.0, 37.0, and 47.4 kW, respectively, for PTO speed level 1 and 2. Paired t-test showed significant difference in power consumption of engine, transmission input shaft, and PTO input shaft for different PTO speed levels. Therefore, the power consumption of engine for baler operation increased when the PTO gear was shifted from P1 to P2. It was indicated that the power requirement of tractor was affected by the PTO rotational speed for baler operation.
Kim, Sang-Hwan;Oh, Tae-Sang;Park, Soo-Hwan;Lee, Choong-Yeoul;Park, Jong-Kwan
Journal of Korean Tunnelling and Underground Space Association
/
v.16
no.2
/
pp.193-201
/
2014
This paper presents the development of simulation system on EPB shield TBM Hood operation. In recent, EPB shield TBM is widely used in the tunnel construction. Since the hood system of the EPB shield TBM is most important to excavate the tunnel, it is necessary to perform the simulation of hood system to investigate the design and operation parameters prior to tunnel construction. In order to carry out this study, the scaled simulation system was designed and developed. The model tests were performed to verify the developed system. During the simulation, the earth pressures developed in the chamber during tunnelling were measured to evaluate the operation technique. The test results obtained by the developed simulation system show clearly the similar behaviour of TBM hood compared with the field data. It was also found that the ground loss during tunnelling is dependent on the change of earth pressure in chamber. Therefore, the simulation system developed in this study will be very useful to evaluate the operation technique of the TBM hood prior to tunnel construction. In addition, this system will be applied in a various condition of ground to get the operating information.
Journal of the Institute of Electronics Engineers of Korea SD
/
v.46
no.5
/
pp.1-8
/
2009
Since scan based testing is very efficient and widely used for testing large sequential circuits. However, since test patterns are serially injected through long scan chains, scan based testing requires very long test application time. Also, compared to the normal operations, scan shifting operations drastically increase power consumption. In order to solve these problems, this paper presents a new scan architecture for both test application time and test power reduction. The proposed scan architecture partitions scan chains into several segments and bypasses some segments which do not include any specified bit. Since bypassed segments are excluded from the scan shifting operation, the test application time and test power can be significantly reduced.
CHOI, Seung-Hyun;KIM, Juntae;Park, Kaemyoung;JANG, Tae Hun;KIM, Pu Reum;JEONG, Woojin;SONG, Jae Min
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2019.11a
/
pp.259-260
/
2019
Through Korean Smart-Navigation Project we are tasking with a VDES test network construction and service solution development. In this task, we design a structure that interoperates the VDES network with the service host/client simulator which is communication framework for efficient and reliable and seamless service. The proposed structure includes interface design between VDES test equipments which is VDES shore station, mobile station, gate way, service host and client. And detailed design includes message definition, interface design, operation scenario, equipment design and implementation for VDES test network. After implementing these test equipments with proposed design, we will firstly proceed the test equipment integration and interface test indoors for VDES test network. After fully verifing the VDES test network through indoor tests, we will construct the VDES shore station and mobile station and conduct the sea area tests by 2020.
Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
Transactions of the Korean Society of Mechanical Engineers B
/
v.34
no.5
/
pp.563-568
/
2010
Turbopump-gas generator open-loop coupled tests are performed during the development of a 30tonf-LOx/Kerosene rocket engine. In the turbopump-gas generator open-loop tests, the propellants to gas generator are supplied from the outlets of turbopump, while the gas exhausted from the gas generator is vented out to the atmosphere, instead of being used to turbine driving. This paper presents the objectives, procedure, and results of the open-loop coupled test, in addition to a schematic representation of the test apparatus and the operating conditions for the test facility system and control system. The results of turbopump-gas generator open-loop coupled test confirm chill-down procedure, startup characteristics, nominal operability and smooth shutdown of the open-loop coupled Test Plant in test conditions simulating engine system operation environment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.