• Title/Summary/Keyword: operation test

Search Result 5,241, Processing Time 0.033 seconds

A Study on Advanced Location Awareness Component using Smart Phone GPS in BIS

  • Lee, Hwajeong;Koh, Jingwang;Lim, Gyugeun;Lee, Seookcheol
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.5
    • /
    • pp.41-47
    • /
    • 2019
  • A BIS(Bus Information System) collects, processes and analyzes information such as real-time location and operation status during bus operation. And It is a system that provides valid information to citizens, drivers, traffic centers and bus companies. Transport information system sent by an each bus is collected through GPS(Global Positioning System), DSRC(Dedicated Short Range Communications), Beacon and passed to transport information center. BIS data by collected is handled and analyzed. Next, it is transmitted to citizen, drivers and bus companies in real time. The result of 5 times simulation satisfied the test criteria(error range ${\pm}10m$) with an average error range of 3.306m, and the reliability is increased. In this paper, we propose a improved location transfer component that can provide users to quicker and more accurate location information than existing BIS using GPS of smart phone. It can be seen that reliability is improved by securing improved bus position data.

REBCO coil operation in gaseous helium and solid nitrogen

  • Diev, D.N.;Makarenko, M.N.;Naumov, A.V.;Polyakov, A.V.;Shcherbakov, V.I.;Shutova, D.I.;Surin, M.I.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.21 no.3
    • /
    • pp.47-50
    • /
    • 2019
  • The paper gives the results of the experiments with a model two-section REBCO solenoid cooled by either gaseous helium (GHe) or sub-cooled/solid nitrogen (SN2) in (50-77) K temperature range. The major cooling source was a single-stage cryocooler Sumitomo CH-110 with the cooling power of 175 W and 130 W at 77 K and 50 K respectively. The coil itself was not directly conduction cooled. We compare the time taken by both coolants to obtain the temperature of the magnet of about 50 K and the homogeneity of the temperature distribution within the cryostat. Test results for the coil operation in solid nitrogen together with the comparison of its critical properties in SN2 and GHe are also presented.

An Autonomous Operational Service System for Machine Vision-based Inspection towards Smart Factory of Manufacturing Multi-wire Harnesses

  • Seung Beom, Hong;Kyou Ho, Lee
    • Journal of information and communication convergence engineering
    • /
    • v.20 no.4
    • /
    • pp.317-325
    • /
    • 2022
  • In this study, we propose a technological system designed to provide machine vision-based automatic inspection and autonomous operation services for an entire process related to product inspection in wire harness manufacturing. The smart factory paradigm is a valuable and necessary goal, small companies may encounter steep barriers to entry. Therefore, the best approach is to develop towards this approach gradually in stages starting with the relatively simple improvement to manufacturing processes, such as replacing manual quality assurance stages with machine vision-based inspection. In this study, we consider design issues of a system based on the proposed technology and describe an experimental implementation. In addition, we evaluated the implementation of the proposed technology. The test results show that the adoption of the proposed machine vision-based automatic inspection and operation service system for multi-wire harness production may be considered justified, and the effectiveness of the proposed technology was verified.

PREDICTION OF FAULT TREND IN A LNG PLANT USING WAVELET TRANSFORM AND ARIMA MODEL

  • Yeonjong Ju;Changyoon Kim;Hyoungkwan Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.388-392
    • /
    • 2009
  • Operation of LNG (Liquefied Natural Gas) plants requires an effective maintenance strategy. To this end, the long-term and short-term trend of faults, such as mechanical and electrical troubles, should be identified so as to take proactive approach for ensuring the smooth and productive operation. However, it is not an easy task to predict the fault trend in LNG plants. Many variables and unexpected conditions make it quite difficult for the facility manager to be well prepared for future faulty conditions. This paper presents a model to predict the fault trend in a LNG plant. ARIMA (Auto-Regressive Integrated Moving Average) model is combined with Wavelet Transform to enhance the prediction capability of the proposed model. Test results show the potential of the proposed model for the preventive maintenance strategy.

  • PDF

Development of Reservoir Operation Model using Simulation Technique in Flood Season (I) (모의기법에 의한 홍수기 저수지 운영 모형 개발 (I))

  • Sin, Yong-No;Maeng, Seung-Jin;Go, Ik-Hwan;Lee, Hwan-Gi
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.745-755
    • /
    • 2000
  • The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.

  • PDF

Analysis of Power Requirement of Agricultural Tractor during Baler Operation (베일러 작업 시 트랙터 소요동력 분석)

  • Kim, Yong-Joo;Lee, Dae-Hyun;Chung, Sun-Ok;Park, Seung-Jae;Choi, Chang-Hyun
    • Journal of Biosystems Engineering
    • /
    • v.36 no.4
    • /
    • pp.243-251
    • /
    • 2011
  • Purpose of this study was to analyze power requirement of an agricultural tractor for baler operation. First, a power measurement system was developed and installed in a 75 kW agricultural tractor. Strain-gages with a telemetry system were used to measure torques of transmission and PTO input shafts. An engine tachometer was used to measure rotational speed of transmission and PTO input shafts. The measurement system also included pressure sensors to measure pressure of hydraulic pumps, an I/O interface to acquire the sensor signals, and an embedded system to determine power requirements. Second, field experiments were conducted at two PTO speed levels, and proportion of utilization ratio of rated engine power and power consumption of major parts (transmission input shaft, PTO input shaft, main hydraulic pump, and auxiliary hydraulic pump) were analyzed. Results of usage proportion of engine power for PTO speed level 1 and 2 were 4.1 and 2.2%, 31.5 and 16.3%, 49.6 and 59.7%, 14.4 and 20.8%, and 0.4 and 1.0%, respectively, for ratio of measured engine power to rated engine power of less than 25%, 25 ~ 50%, 50 ~ 75%, 75 ~ 100%, and greater than 100%. The results showed that the usage proportion increased in the range with the ratio of power requirement to rated engine power of over than 50% when the PTO gear was shifted from P1 to P2. Averaged engine power requirement for baling operation, tying and discharging operation, and total operation were 43.3, 37.3, and 42.0 kW and 49.0, 37.0, and 47.4 kW, respectively, for PTO speed level 1 and 2. Paired t-test showed significant difference in power consumption of engine, transmission input shaft, and PTO input shaft for different PTO speed levels. Therefore, the power consumption of engine for baler operation increased when the PTO gear was shifted from P1 to P2. It was indicated that the power requirement of tractor was affected by the PTO rotational speed for baler operation.

Development of simulation equipment system on EPB shield TBM hood operation (토압식 쉴드TBM의 후드부 시뮬레이션 장비 시스템 개발에 대한 연구)

  • Kim, Sang-Hwan;Oh, Tae-Sang;Park, Soo-Hwan;Lee, Choong-Yeoul;Park, Jong-Kwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.193-201
    • /
    • 2014
  • This paper presents the development of simulation system on EPB shield TBM Hood operation. In recent, EPB shield TBM is widely used in the tunnel construction. Since the hood system of the EPB shield TBM is most important to excavate the tunnel, it is necessary to perform the simulation of hood system to investigate the design and operation parameters prior to tunnel construction. In order to carry out this study, the scaled simulation system was designed and developed. The model tests were performed to verify the developed system. During the simulation, the earth pressures developed in the chamber during tunnelling were measured to evaluate the operation technique. The test results obtained by the developed simulation system show clearly the similar behaviour of TBM hood compared with the field data. It was also found that the ground loss during tunnelling is dependent on the change of earth pressure in chamber. Therefore, the simulation system developed in this study will be very useful to evaluate the operation technique of the TBM hood prior to tunnel construction. In addition, this system will be applied in a various condition of ground to get the operating information.

Selective Segment Bypass Scan Architecture for Test Time and Test Power Reduction (테스트 시간과 테스트 전력 감소를 위한 선택적 세그먼트 바이패스 스캔 구조)

  • Yang, Myung-Hoon;Kim, Yong-Joon;Park, Jae-Seok;Kang, Sung-Ho
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.46 no.5
    • /
    • pp.1-8
    • /
    • 2009
  • Since scan based testing is very efficient and widely used for testing large sequential circuits. However, since test patterns are serially injected through long scan chains, scan based testing requires very long test application time. Also, compared to the normal operations, scan shifting operations drastically increase power consumption. In order to solve these problems, this paper presents a new scan architecture for both test application time and test power reduction. The proposed scan architecture partitions scan chains into several segments and bypasses some segments which do not include any specified bit. Since bypassed segments are excluded from the scan shifting operation, the test application time and test power can be significantly reduced.

A Detailed Design Study on VDES Test Network Construction and Service Solution Development (VDES 시험망 구축 및 서비스 솔루션 개발에 관한 상세설계 연구)

  • CHOI, Seung-Hyun;KIM, Juntae;Park, Kaemyoung;JANG, Tae Hun;KIM, Pu Reum;JEONG, Woojin;SONG, Jae Min
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2019.11a
    • /
    • pp.259-260
    • /
    • 2019
  • Through Korean Smart-Navigation Project we are tasking with a VDES test network construction and service solution development. In this task, we design a structure that interoperates the VDES network with the service host/client simulator which is communication framework for efficient and reliable and seamless service. The proposed structure includes interface design between VDES test equipments which is VDES shore station, mobile station, gate way, service host and client. And detailed design includes message definition, interface design, operation scenario, equipment design and implementation for VDES test network. After implementing these test equipments with proposed design, we will firstly proceed the test equipment integration and interface test indoors for VDES test network. After fully verifing the VDES test network through indoor tests, we will construct the VDES shore station and mobile station and conduct the sea area tests by 2020.

  • PDF

Study on Turbopump-Gas Generator Open-Loop Coupled Test (터보펌프-가스발생기 개회로 연계시험 연구)

  • Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.34 no.5
    • /
    • pp.563-568
    • /
    • 2010
  • Turbopump-gas generator open-loop coupled tests are performed during the development of a 30tonf-LOx/Kerosene rocket engine. In the turbopump-gas generator open-loop tests, the propellants to gas generator are supplied from the outlets of turbopump, while the gas exhausted from the gas generator is vented out to the atmosphere, instead of being used to turbine driving. This paper presents the objectives, procedure, and results of the open-loop coupled test, in addition to a schematic representation of the test apparatus and the operating conditions for the test facility system and control system. The results of turbopump-gas generator open-loop coupled test confirm chill-down procedure, startup characteristics, nominal operability and smooth shutdown of the open-loop coupled Test Plant in test conditions simulating engine system operation environment.