• Title/Summary/Keyword: operation standard

Search Result 2,616, Processing Time 0.031 seconds

The effects of Wake-up Radio in WLAN V2P Communication (무선 랜 기반 V2X 통신에서의 보조 수신기를 활용한 동작에 따른 영향)

  • Hong, Hanseul;Kim, Ronny Yongho
    • Journal of Advanced Navigation Technology
    • /
    • v.22 no.4
    • /
    • pp.302-310
    • /
    • 2018
  • To realize the self-driving technology, there have been various system designs based on the related V2X standards, especially the IEEE 802.11p and WAVE standard supporting the WLAN V2X communication. On the other hand, the new standard IEEE 802.11ba defining supplementary wake-up radio operation is now under standardization targeting the low power operation, and it includes the V2P operation in use cases. However, if IEEE 802.11ba is used with the IEEE 802.11ba for V2X operation, the additional transmission procedure of wake-up frame in IEEE 802.11ba may cause the congestion problem and fails to meet the delay requirement. In this paper, the system structure of the combination of IEEE 802.11ba with the 802.11p is studied. In addition, based on the analysis and simulation, the considerations and improvements for effective low-power V2P communication in future self-driving technology using IEEE 802.11ba are proposed.

Analysis of Installation Effect of Section Speed Enforcement System Using ITS Collection and Operation Data (ITS 수집 및 운영 자료를 활용한 구간과속단속시스템 설치효과 분석)

  • Yoon, Young-Min
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.12
    • /
    • pp.302-309
    • /
    • 2021
  • The section speed enforcement system measures the starting instantaneous speed, the The section speed enforcement system measures the starting instantaneous speed, the ending instantaneous speed, and the section average speed, and imposes fines only for the portion that has been speeding the most. However, according to the Road Traffic Act, most of the systems are installed on highways, so existing research has been conducted on highway sections. In this study, it is expected that the installation of section speed enforcement systems on general national roads will be expanded according to the revision of related laws. ITS collection and operation data targeting the section speed enforcement system installed on National Road 3 Seongnam Icheon-ro was used to analyze traffic speed, standard deviation of traffic speed, and reduction in traffic accidents by dividing it into before installation, trial operation period, and after crackdown. As a result of the analysis, the traffic speed, standard deviation, and traffic accidents decreased by 13%, 25%, and 70%, respectively, after installation, confirming that the installation of the section speed enforcement system greatly contributed to the reduction of accidents.

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

An Empirical Study on Pricing Model for Software Operation (소프트웨어 운영 대가산정 방식에 대한 실증적 연구)

  • Kim, Heungshik;Kim, Choong Nyoung;Seo, Yongwon
    • Journal of Information Technology Services
    • /
    • v.18 no.4
    • /
    • pp.67-82
    • /
    • 2019
  • The purpose of this study is to improve the calculation method of the software operation pricing proposed by the software business price calculation guide from 'input manpower method' to 'rate calculation method'. The software operation pricing of the input manpower method is not objectively calculated in the domestic IT outsourcing situation where the statistical data based on the activity based estimating is insufficient and it is decided by agreement between the owner and the client. In addition, there was no standard for adjusting the productivity according to the characteristics of the operation service. In order to improve this, an operational correction factor item that can affect the software operation productivity was selected based on foreign and domestic standards, and it was confirmed through the first questionnaire to IT operation managers. In order to determine the level of difficulty of the fixed operational correction factors, the operational correction factor using AHP technique was confirmed through a second questionnaire for pairwise comparison. The operational difficulty calculation table was developed with reference to COCOMO and ITIL standards. Finally, we propose a new pricing scheme that reflects the operating rate. Regression analysis was carried out by collecting the data of the domestic public institutions on the estimated cost and the actual cost calculated from the new rate method software operation pricing. The results of the regression analysis show that the estimated cost and the actual cost are related to each other. Mean magnitude of relative error(MMRE) and PRED[25] analysis were added for accuracy analysis. MMRE and PRED also showed satisfactory results, confirming the possibility of replacing the rate method software operation pricing.

A Study on Improvement of Fire Service Deployment Standard in Korea (한국 소방력배치 기준의 개선에 관한 연구)

  • Lee, Hae-Pyeong;Back, Min-Ho
    • Fire Science and Engineering
    • /
    • v.20 no.1 s.61
    • /
    • pp.28-42
    • /
    • 2006
  • The purpose of this study is to offer the improvement for deployment of fire service force in Korea by settlement patterns on the basis of analysis for the present standard and deployment of fire service force. For the adequate deployment and operation of fire service force by settlement patterns, we carried out the analysis of the present standard calculated with allocation of the authorized strength. We also classified clusters for settlement pattern through the statistical methods. We proposed the standard for deployment of fire service force reflected with environmental and need factors through the introduction of standardized index.

A Study about Preventing Improper Working of Equipment on ATS System by Signaling Equipment (신호장치에 의한 ATS 신호장치 오동작 방지에 대한 연구)

  • Ko, Young-Hwan;Choi, Kyu-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.579-587
    • /
    • 2008
  • Promotion of the line no.2 in Seoul Metro was changing from the existing signaling facilities for ATS(Automatic Train Stop) vehicles to the up-to-date signaling facilities for ATO(Automatic Train Operation). But, in consequence of conducting a trial run after being equipped with the ATO signaling facilities, the matter related to mix-operation with the existing ATS signaling facilities appeared. The operation of the existing ATS signaling system in combination with the ATO signaling system has made improper working related to frequency recognition of the ATS On-board Computerized Equipment. This obstructs operation of a working ATS vehicle. That is, as barring operation of an ATS vehicle that should proceed, it may make the proceeding ATS vehicle stop suddenly and after all, it will cause safety concerns. In this paper, we designed a wayside track occupancy detector that previously prevents improper working related to frequency recognition of the ATS On-board Computerized Equipment by gripping classification and working processes of operating trains throughout transmission of local signaling information from the existing facilities, which does not need to change or replace the existing signaling facilities. Furthermore, we described general characteristics of the wayside track occupancy detector and modeled the IFC(InterFace Contrivance) device and the logical circuit recognizing signal information. Then, we made an application program of PLC(programmable Logic Computer) based on the stated model. We, in relation to data transfer method, used the frame in TCP/IP transfer mode as the standard, and we demonstrated that ATO transmission frequency is intercepted.

  • PDF

A Study of Systematization for Train Control Technique (열차제어기술 체계화 방안에 대한 연구)

  • Lee, Jae-Ho;Shin, Duc-Ko;Lee, Kang-Mi
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.2010-2016
    • /
    • 2009
  • Before introducing high speed train, train signal system was operated passively depending on a driver by signal lamp display. Now it is changing to onboard signaling system because of train speed increased(conventional track is 230km/h, high speed track is 380km/h), high speed. low speed freight train operation mixed, operation for high speed train in conventional track and dense operation. ie. ETCS(European Train Control System) Level 1 is introducing. Also, in case of high speed train, the train control system of France was introduced and has operated from 2004, now we have a difficulty for rising speed more than 300km/h because of commercial operation speed limited as 300km/h. Therefore, it need to establish the train control technique according to trackside surroundings and develope standard system like European ERTMS/ETCS, China CTCS(Chinese Train Control System), Japan D-ATC(Digital Automatic Train Control). In this paper, we derive the systematization method for Korea train technique by network-oriented, information-oriented, intelligence-oriented and combination-oriented corresponding train development direction. Proposed method has a merit to prevent cross by mixed operation with existing system and improvement after validity demonstration and system development and supply train system to meet user requirement in exporting.

  • PDF

A study of the relationship between the subjective symptoms of VDT syndrome and occupational factors in VDT operators (VDT작업자의 작업조건과 다발하는 자각증상과의 관련성에 관한 연구)

  • Kim Kap-Sung;Lee Seung-Deok
    • Journal of Acupuncture Research
    • /
    • v.18 no.6
    • /
    • pp.70-83
    • /
    • 2001
  • Objective : In order to investigate symptoms prevalence related to visual display terminal(VDT) syndrome, and to evaluate the variables affecting the development of the VDT syndrome. Methods : a questionnaire survey was conducted on 127(81 men and 46 women) VDT operators who had been studied in Soongsil University graduated school in Seoul. Result : As a result of analysis with data collected by questionnaire, l. Variables affecting the level of general symptoms were sex, the total time of VDT operation per day, type of typewriting, location of keyboard, illumination, VDT working duration, the time of VDT operation without rest. 2. Variables affecting the level of eye symptoms were sex, the total time of VDT operation per day, type of typewriting, VDT working duration, illumination, method of eye-resting. 3. Variables affecting the level of musculoskeletal symptoms were sex, the total time of VDT operation per day, the time of VDT operation without rest, illumination. Conculsions : In order to protect workers from VDT syndrome, it is urgently required to implement standard management recommendations including restriction of VDT working hours and allowance of more sufficient resting time for VDT workers.

  • PDF

A Multi Medium Wireless Communication Vehicle Terminal Development and a Performance Test (다매체 무선통신 차량 단말 개발 및 성능평가)

  • Kim, Sang-Heon;Cho, Yung-Sung;Kim, Kyoung-Hwan;Bae, Myoung-Hwan;Lee, Kyeong-Im
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.10 no.5
    • /
    • pp.135-145
    • /
    • 2011
  • As communication technology, an enabling technology for ITS, becomes diversified with DSRC, CDMA, Wireless LAN, it is expected that type and function of ITS services will become gradually expanded. As a result, research and development of a standard platform that can provide support so that numerous communication technologies that are being used in various ITS services to receive various ITS services can be operated in one integrated terminal are being carried out. On Board Unit (OBU) for a recent standard platform was also built and tested recently. However, verification for standard suitability of the standard platform OBU that was developed must be carried out. Standard technology must be realized and sufficient functional and operational testing must be carried out in order to guarantee efficient operation in an actual ITS system and increase utilization of standard technology. Therefore, In this paper we had constructed test road and we had tested a standard platform OBU for a standard application.

An Overtaking-station-selection Algorism Based on Realtime Simulation for the Optimization of Mixed Operation of Express and Regular Trains of Urban Transit (도시철도의 완.급행 혼합 운전계획 최적화를 위한 실시간 시뮬레이션 기반 대피역 선정 알고리즘)

  • Seon, Hyeon-Kyoo;Ryu, Sang-Hwan;Choi, Kyu-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.490-497
    • /
    • 2011
  • When operating Express and Standard trains, which run with two different scheduled time, in a single line with limited number of side tracks for overtaking standard trains, it is required to have various modeling methodologies and simulations in order to calculate an optimum headway to maximize the capacity of the line with the best scheduled time. Especially it is inevitable that following trains have to slow down or stop in the middle of their operations due to the preceding trains, in case it is inappropriate controlled about either in which station an overtaking should be taken or how long it should be. This study is to analyze TPS data which have been produced with a simulation program which the team has invented to optimize Express and Standard mixed traffic plan and to introduce an algorism which shows detected conflict data, calculates appropriate dwell time after getting overtaken and helps to decide stations for overtaking.

  • PDF