Analysis of Operation Plan by Multipurpose Supply for Heightened Agricultural Reservoir (둑높임저수지 다중용수공급에 따른 운영 방안 분석)

  • Kim, Hae Do;Lee, Kwang Ya;Park, Jong Yoon;Han, Guk Heon;Lim, Heung Chang
    • KCID journal
    • /
    • v.19 no.1
    • /
    • pp.77-86
    • /
    • 2012
  • The aim of this study was to analyze the operation plan for heightened agricultural reservoir, in terms of water supply to downstream paddy fields and instreams. Operation of agricultural reservoir before the heightened reservoir project is easy to manage because of its single purpose, which is irrigation water supply. However, after proceeding the heightened project, there is needed to be set the operation rule because of its multiple purpose, which is water for irrigation and supply to the stream. In this paper, propose the method of design the criteria of supply to the stream and operation rule curve for the heightened reservoir. According to simulation results by proposed operating rule for the Gumsa reservoir, the yearly amount of water supply to the stream can be 2,588 thousand $m^3$, 3 times of the heightened space (2,588 thousand $m^3$).

  • PDF

Affecting Water Supply Capacity Followed by Allocating Flood Control Volume in Heightening Reservoir (홍수조절용량 설정에 따른 증고저수지의 용수공급능력 변화)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.57-70
    • /
    • 2010
  • This study was performed to analyze the affect of water supply capacity followed by allocating flood control volume in heightening reservoir, of which Baekgog reservoir was selected as a case study in here. Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water level will be heightened from EL. 100. 1m to EL. 102.1m, and total storage from 21.75M $m^3$ to 26.67M $m^3$. Flood inflow with 200year frequency was estimated to 997 $m^3$/s in peak flow and 22.54M $m^3$ in total volume. Reservoir flood routing was conducted to determine flood limited water levels, which was determined to have scenarios such as EL 97-98-99m in periods of 6.21.-7.20., 7.21.-8.20., and 8.21.-9.20., respectively, EL 97-97-97m, EL 98-98-98m in present reservoir, and EL 99-100-101m, EL 99-99-99m, and EL 100-100-100m in heightened reservoir. Reservoir inflow was simulated by DAWAST model. Annual paddy irrigation requirement was estimated to 33.19M $m^3$ to 2,975ha. Instream flow was allocated to 0.14mm/d from October to April. Operation rule curve was drawn using inflow, irrigation and instream flow requirements data. In case of withdrawal limit reservoir operation using operation rule curve, reduction rates of annual irrigation supply before and after flood control by reservoir were 2.0~4.3% in present size and 1.5~3.6% in heightened size. Reliability on water supply was decreased from 77.3% to 63.6~68.2% in present size and from 81.6% to 72.7~79.5% in heightened size. And reduction rates of water storage at the end of year before and after flood control by reservoir were 7.3~16.5% in present size and 7.7~16.9% in heightened size. But water supplies were done without any water deficiency through withdrawal limit reservoir operation in spite of low flood regulating water level.

  • PDF

S-N Curve Estimation of a KTX Structure for an Accelerated Life Testing (가속수명시험을 위한 KTX 구조물의 S-N 선도 추정)

  • Jung, Dal-Woo;Choi, Nak-Sam;Park, Su-Han
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.384-389
    • /
    • 2008
  • An accelerated fatigue test is essentially required to maintain the reliability of the actual structure of KTX under operation conditions. However, actual fatigue life cannot be obtained if specimens are not adequate to the conventional fatigue test. Moreover component maker did not provide data of loading stress (S) - cycles at the failure (N). In this study, we suggest a prediction method of the S-N curve for establishing an accelerating test under various load levels. Load history was acquired from the field tests. A Rainflow method was used on the cycle counting of the field load data, and then, an S-N curve was obtained through the iteration process under the condition that the damage index satisfies to 1 in the Miner's rule.

  • PDF

S-N Curve Deduction of a KTX High-Speed Train Structure for an Accelerated Life Testing (가속수명시험을 위한 KTX고속열차 구조물의 S-N 선도 추정)

  • Jung, Dal-Woo;Choi, Nak-Sam;Park, Su-Han
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.33 no.4
    • /
    • pp.388-395
    • /
    • 2009
  • An accelerated fatigue test is essentially required to maintain the reliability of the actual structures of KTX under operation conditions. However, actual fatigue life cannot be obtained because the conventional fatigue tests are not adequate to the real load conditions. Moreover foreign component makers have not provided data of the loading stresses (S) versus cycles at the failure (N). In this study, we suggested a deduction method of the S-N curve for establishing an accelerating test under various load levels. Load history was acquired from the field tests. A Rainflow method was used on the cycle counting of the field load data. After that, an S-N curve was obtained through the iteration process under the condition that the damage index satisfies to 1 in the Miner's rule. The deduced S-N curve was applied to the performance evaluation of Korean-made sealed knuckles compared with imports.

Development of Operating Rule Curve for Multipurpose Water Supply in Heightened Agricultural Reservoir (농업용 둑높임저수지의 다중 용수공급을 위한 이수운영기준곡선 개발)

  • Park, Jong-Yoon;Jung, In-Kyun;Lee, Kwang-Ya;Kim, Seong-Joon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1389-1400
    • /
    • 2013
  • This study developed an operating rule curve (ORC) for multipurpose water supply (irrigation and environmental water) in heightened agricultural reservoir. Among the 20 reservoirs in improvement project of agricultural reservoir dam heightening, the 4 representative reservoirs (Ungyang, Gungchon, Yongam and Unam) were selected for the study according to the analysis of statistical characteristics. Available environmental water supply amounts during irrigation and non-irrigation periods, which is the range from release restricted water level to high water level were estimated by water balance analysis using reservoir operation model. Reliability, resiliency and vulnerability criteria for water system performance were used to assess the multiple water supply capacity. The ORC was presented as the percentile rank for the daily reservoir water level from the results of reservoir operation using the past couple of decades weather data. The water levels for each percentile were divided into 3 buffer sections representing drought (5~25%), normal (25~75%), and flood (75~95%) year to operate the heightened agricultural reservoir with ORC.

Evaluating Future Stream Flow by Operation of Agricultural Reservoir Group considering the RCP 8.5 Climate Change Scenario (RCP 8.5 기후변화 시나리오를 고려한 농업용 저수지군 운영에 따른 미래 하천유량 평가)

  • Lee, Jaenam;Noh, Jaekyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.57 no.5
    • /
    • pp.113-122
    • /
    • 2015
  • This study aims to evaluate future stream flow by the operation of agricultural reservoir group at the upper stream of the Miho River. Four agricultural reservoirs with storage capacities greater than one million cubic meters within the watershed were selected, and the RCP 8.5 climate change scenario was applied to simulate reservoir water storage and stream flow assuming that there are no changes in greenhouse gas reduction. Reservoir operation scenarios were classified into four types depending on the supply of instream flow, and the water supply reliability of each reservoir in terms of water supply under different reservoir operation scenarios was analyzed. In addition, flow duration at the watershed outlet was evaluated. The results showed that the overall run-off ratio of the upper stream watershed of the Miho River will decrease in the future. The future water supply reliability of the reservoirs decreased even when they did not supply instream flow during their operation. It would also be difficult to supply instream flow during non-irrigation periods or throughout the year (January-December); however, operating the reservoir based on the operating rule curve should improve the water supply reliability. In particular, when instream flow was not supplied, high flow increased, and when it was supplied, abundant flow, ordinary flow, and low flow increased. Drought flow increased when instream flow was supplied throughout the year. Therefore, the operation of the agricultural reservoirs in accordance with the operating rule curve is expected to increase stream flow by controlling the water supply to cope with climate change.

Development of reservoir operation rule curve using DP for max hydro-power generation of power station in the Nam Ngum River in Lao PDR. (라오스 남능강 발전소의 최대전력생산을 위해 동적계획법을 활용하여 저수지 운영규정곡선 개발)

  • Lee, Hyun Jae;Jang, Woong Chul;Lee, Il Ju;Lee, Jin Hee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.106-106
    • /
    • 2021
  • 라오스 남능강 유역에는 현재 11개의 수력 발전 댐이 운영되고 있으며 최근에 설치된 댐을 제외하고는 오래전에 개발된 운영규정 곡선에 근거하여 운영하고 있다. 즉 댐의 증설에 따른 하천 유량의 변동과 발전소의 설비용량증설 등의 발전환경이 충분히 반영되지 못한 상태로 운영하고 있으며, 이로 인해 통합수자원 관리의 최적화 차원의 일환으로 최대 전력생산을 위한 새로운 저수지 운영규정 곡선 개발이 필요하게 되었다. 저수지 운영규정 곡선(reservoir operation rule curve)은 일반적으로 주어진 저수지의 규모와 저수지로의 유입량 그리고 발전소의 설비용량 등의 발전환경을 종합적으로 고려하여 연간 발전량을 최대로 생산할 수 있도록 최적화 기법 등을 활용하여 개발한다. 본 고에서는 이를 위해 범용적인 동적 계획법(Dynamic Programming:DP)프로그램인 CSUDP를 활용하여 최초의 최적 저수지 운영규정 곡선을 제시하고 이에 의한 발전량을 모의하기 위해 HEC-ResSim package를 활용하였으며, 최종적으로는 기존의 운영규정 곡선, 운영실적, 그리고 현장 운영자의 의견 등을 종합적으로 고려하여 댐 운영 시나리오(단독, 연결, 댐별 상업 발전 시기 등)별로 운영규정 곡선을 개발하고 라오스 정부(EdL)에 제시하였다.

  • PDF

Securing Inflows to Reservoir with Low Ratio of Watershed to Paddy Field Areas by Operating Outside Diversion Weir (유역외 보의 연계운영에 의한 유역배율이 작은 저수지의 유입량 확보 가능성)

  • Noh, Jae-Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.1
    • /
    • pp.17-28
    • /
    • 2011
  • This study was performed to ascertain the possibility of securing inflows to reservoir with low ratio of watershed to paddy field areas by outside diversion weir. The case of Maengdong reservoir and Samryong diversion weir was selected. Most of inflows to Maengdong reservoir with watershed area of $7.06\;km^2$ and total storage capacity of $1,269{\times}10^4\;m^3$ are filled with intake water from outside Samryong diversion weir. Only using water storage data in Maengdong reservoir from 1991 to 2009, the range of water intake in Samryong diversion weir to Maengdong reservoir was optimized to 0.135~30 mm/d, from which water intake to Maengdong reservoir was $1,672.9{\times}10^4\;m^3$ (70.1 %) and downstream outflow to Weonnam reservoir was $714.4{\times}10^4\;m^3$ (29.9 %). The parameters of DAWAST model for reservoir inflow were determined to UMAX of 313.8 mm, LMAX 20.3 mm, FC 136.8 mm, CP 0.018, and CE 0.007. Inflows to Maengdong reservoir were $427.1{\times}10^4\;m^3$ (20.3 %) from inside watershed, and $1,672.9{\times}10^4\;m^3$ (79.7 %) from outside. Paddy irrigation water requirements were estimated to $1,549{\times}10^4\;m^3$ on annual average. Operation rule curve was drawn by using daily inflow and irrigation requirement data. By securing the amount of inflow to Maengdong reservoir to about 80 % from outside Samryong diversion weir, water supply capacity for irrigation of $1,549{\times}10^4\;m^3/yr$ was analyzed to be enough. Additional water supplies for instream flow were analyzed to $1,412\;m^3/d$ in normal reservoir operation, $36,000\;m^3/d$ in withdrawal limit operation by operation rule curve from October to March of non irrigation period.

Fast Evaluation of a dynamic B-spline Curve and Surface (동적인 B-spline 곡선과 곡면의 효율적인 평가방법)

  • Ryu Joonghyun;Kim Deok-Soo
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.461-466
    • /
    • 2002
  • In many applications of computer aided geometric design and computer graphics, B-spline is one of the most popular representation for curves and surfaces, and the evaluation of B-spline curves and surfaces is the most frequently used operation. For the evaluation and others, the power form representation of the curves and surfaces is preferred because it is possible to speed-up the operation using Horner's rule. In this paper, we present a new algorithm for the above-mentioned conversion focusing on a dynamic case. Experiment shows that the proposed algorithm significantly outperforms the conventional approach when one or more control points of a B-spline curve and surface are dynamically moving.

  • PDF

Modeling of Hybrid Railway Vehicles with Hydrogen Fuel-Cell/Battery using a Rule-Based Algorithm (규칙기반 알고리즘을 이용한 수소연료전지/배터리 하이브리드 철도차량 모델링)

  • Oh, Yoon-Gi;Han, Byeol;Oh, Yong-Kuk;Ryu, Joon-Hyoung;Lee, Kyo-Beum
    • Journal of IKEEE
    • /
    • v.24 no.2
    • /
    • pp.610-618
    • /
    • 2020
  • This paper presents the modeling of hybrid railway vehicles with hydrogen Fuel-Cells (FCs)/battery using a rule-based algorithm. The driving power of traction system is determined with the speed-torque curve by operation area of the electric machine and the electrical systems are modeled. The demanded power of electrical systems is set with the energy management system (EMS). The consumption of hydrogen is effectively managed with the subdivided operation region depending on the state of charge (SOC). The validity of the modeling is verified using MATLAB/Simulink.