• Title/Summary/Keyword: operation rule

Search Result 528, Processing Time 0.032 seconds

Operation rule curve for supplying urban instream flow from reservoir (도시 하천유지유량 공급의 저수지 운영 방법)

  • Noh, Jae-Kyoung;Lee, Jae-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.38 no.1
    • /
    • pp.163-172
    • /
    • 2011
  • To provide the operation rule curve for suppling instream flow to urban stream from reservoir, the Soho reservoir with watershed area of 7.4 $km^2$ and total water storage of 2.58 $Mm^3$ was planned at the headwaters of the Daejeoncheon. Daily streamflow was simulated and using the simulated streamflow and desired instream flow, the operation rule curve by Senga method was drawn and evaluated through reservoir operation. Senga method is derived by accumulating the differences between streamflow and desired instream flow adversely. Water storages were simulated on a daily basis to supply urban instream flow from Soho reservoir, but the amount of supplying instream flow to urban stream was not nearly increased comparing with that of normal operation that does not used the rule curve. Thereafter the new simulation-based operation rule curve was derived and applied to supply instream flow from Soho reservoir. In normal operation, the amount of instream flow was shown to 15,000 $m^3$/d, but it was increased to 27,700 $m^3$/d in withdrawal limited operation using the new derived rule curve, in which the applicability of this rule curve was proved. Also comparing with the flow duration curves at station just before urban Daejeoncheon stream without and with upstream Soho reservoir, the 95th flow was decreased from 1.64 mm/d to 1.51 mm/d, and the 355th flow was increased from 0.17 mm/d to 0.30 mm/d. Monthly streamflows during October to March were increased from 10.6~24.1 mm to 24.1~34.0 mm with the increasing rate of 141~227%.

Dispatching Rule based on Chromaticity and Color Sequence Priorities for the Gravure Printing Operation (색도 및 색순에 따른 그라비아 인쇄 공정의 작업 순서 결정 규칙)

  • Bae, Jae-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.3
    • /
    • pp.10-20
    • /
    • 2020
  • This paper presents a method to measure the similarity of assigned jobs in the gravure printing operation based on the chromaticity and color sequence, and order the jobs accordingly. The proposed dispatching rule can be used to fulfill diverse manufacturing site requirements because the parameters can be adjusted to prioritize chromaticity and color sequence. In general, dispatching rules either ignore the job-changing time or require that the time be clearly defined. However, in the gravure printing operation targeted in this study, it is difficult to apply the general dispatching rule because of the difficulties in quantifying the job-changing time. Therefore, we propose a method for generalizing assignment rules of the job planner, allocating relative similarity among assigned jobs, and determining the sequence of jobs accordingly. Chromaticity priority is determined by the arrangement of the color assignments in the printing operation; color sequence priority is determined by the addition, deletion, or change in a specific color sequence. Finally, the job similarity is determined by the dot product of the chromaticity and color sequence priorities. Implementation of the proposed dispatching rule at an actual manufacturing site showed the planner present the same job order as that obtained using the proposed rule. Therefore, this rule is expected to be useful in industrial sites where clear quantification of the job-changing time is not possible.

Development of Optimal Operation Rule for Multipurpose Reservoirs System (다목적댐의 연계운영을 위한 최적 운영률 개발)

  • Yi, Jae-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.6
    • /
    • pp.487-497
    • /
    • 2004
  • Adding important new projects such as reservoirs which regulate a river discharge to a river system, existing operation methods should be changed considering these conditions. Since an original operation rule used for an existing system has been designed to be compatible to inputs and outputs of the existing system, the operation rule should be changed to consider the new projects. In this study, the technique of constructing new operation rules considering objectives of both old and new projects is suggested when new project is added to the river system. Reservoir operation rule using both stochastic inflow and optimization technique is developed. As a result of applying the technique to Geum river basin, the efficiency of the technique is verified.

Operation Rule Curve for Reservoir with Low Areal Ratio of Watershed to Downstream Paddy Field (유역배율이 작은 저수지의 이수관리방법)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.18 no.1
    • /
    • pp.68-80
    • /
    • 2011
  • To provide a operation rule curve for reservoir with low ratio of watershed area to paddy field area, Duckyong reservoir with watershed area of $15.8km^2$ and paddy field area of 1,071ha was selected, in which 4 meters are being heightened and full water levels will be increased from EL.26.0m to EL.30.0m, total water storages from 365.6M $m^3$ to 708.0M $m^3$. There was no operation rule curve that satisfied over 90% reliability of water supply in reservoir with watershed area of 1.48 times of paddy field area. The differences between observed and simulated reservoir daily water storages were minimized to determine parameters for simulating reservoir inflow in case of paddy field area of 550ha from 1991 to 2010. A operation rule curve was drawn to have a maximum storage with total water storage, which was in paddy field area of 700ha with ratio of 2.3 between watershed area and paddy field area. This case showed that annual irrigation water supply was 668M $m^3$ and instream flow of 57M $m^3$, water supply reliability of 55.6% in normal operation, and annual irrigation water supply was 605M $m^3$ and instream flow of 38M $m^3$, water supply reliability of 95.6% in withdrawal limited operation. Water supply reliabilities showed 35.6% without flood regulation and 17.8% with flood regulation in existing reservoir before heightening.

  • PDF

Development and Assessment of Hedging Rule for Han River Reservoir System Operation against Severe Drought (한강수계 저수지군의 갈수대응 운영을 위한 Hedging Rule의 개발과 적용성 평가)

  • Kim, Jeong Yup;Park, Myung Ky;Lee, Gi Ha;Jung, Kwan Sue
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.10
    • /
    • pp.891-906
    • /
    • 2014
  • This study suggests the hedging rule of MIP (Mixed Integer Programing) in counting the risk evaluation criteria of the objective function and constraints in order to provide the optimum operating rule in reservoir system as constraining water shortage as much as possible which may happen in the downstream control point of water supply in the aspect of water system management. The proposed model is applied to the Han-river reservoir system for two testing periods (Case I: Jan. 1993~Dec. 1997, Case II: Jan. 1999~Dec. 2003). The model based on the hedging rule with trigger volume, estimated in this study shows that in Case I, the monthly minimum discharge was $310.6{\times}10^6m^3$ in the single operation, $56.3{\times}10^6m^3$ in the joint operation, and $317.5{\times}10^6m^3$ in the hedging rule and also, in Case II, the monthly minimum discharge was found to be $204.2{\times}10^6m^3$ in the single operation, $111.2{\times}10^6m^3$ in the joint operation, and $243.7{\times}10^6m^3$ in the hedging rule. In conclusion, the hedging rule, proposed in this study can decrease vulnerability while guarantees reliability and resiliency.

A Study of Parallel Reservoir Integrated Operation considering Storage (저류량을 고려한 병렬저수지 연계운영)

  • Park, Ki-Bum;Lee, Soon-Tak
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1176-1181
    • /
    • 2006
  • The purpose of this study was to estimate water supply analysis and reliability indicators by using allocation rule(AR) about Andong Dam and Imha Dam which have parallel reservoirs system. According to the analysis results of allocation rule, for Rule(A) and Rule(B), the contribution of water supply in Andong Dam was 60% more than in Imha Dam, and for Rule(C), the contributions in Andong Dam and Imha Dam were almost equal. In Rule(C), supply is allocated by the ratio which divides the sum of storage and inflow by the mean storage according to the storage state and supply capability state of Andong Dam and Imha Dam. This Rule(C) showed good results in the water supply capability analysis and reliability analysis of parallel reservoirs. In the analysis criteria of water supply in parallel reservoirs system, monthly water change quantity showed better results than monthly constant water quantity in water supply analysis. On the basis of this study, the new technique for water supply analysis was developed to be applied to parallel reservoirs, and this operation rule will establish the efficient operation measures in the application to several kinds of parallel reservoirs system.

  • PDF

A Performance Comparison between Operation Strategies for Idle Vehicles in Automated Guided Vehicle System

  • Kim, Kap-Hwan;Kim, Jae-Yeon
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.23 no.2
    • /
    • pp.67-81
    • /
    • 1998
  • An Automated Guided Vehicle System (AGVS) with a unidirectional loop guide path is modeled as a discrete-time stationary Markov chain. It is discussed how to estimate the mean response time, the utilization, and the cycle time of AGV for a delivery order. Three common operation strategies for idle vehicles - central zone positioning rule, circulatory loop positioning rule and point of release positioning rule - are analyzed. These different operation strategies are compared with each other based on the performance measures.

  • PDF

Evaluation of the State of Drought by the Operation Rule Curve in the Irrigation Reservoir (관개저수지의 기준저수량 곡선에 의한 한발 평가)

  • 이재면;김영식;김태철
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.117-122
    • /
    • 1999
  • The state of drought was evaluated by the operation rule curve. From the present percentage of reservoir storage and the operation rule curve, it could be determined to ristrict the irrigation water supply to a certain level and eventually to overcome the shortage of water in the irrigation reservoir.

  • PDF

A Rotational Irrigation Scheduling for an Irrigated Paddy Blocks with Operation Rule Curve (이수관리곡선에 의한 논 관개지구의 윤환관개모형)

  • 김태철;이재면;이덕주
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.5
    • /
    • pp.67-76
    • /
    • 2003
  • The principal operation rule of irrigation reservoir is to accelerate the water use and supply water actively when water is sufficient, and to restrict water use and supply water deficiently in order not to stop the irrigation activity when water is scarce. In drought seasons. water should be saved in order to keep the reservoir not to be dried up during the irrigation season. It is important to know how much water should be saved, depending on the rice-growing season and water storage volume. For the drought control of irrigation reservoirs. the rotational irrigation scheduling in paddy with the operation rule curve developed in this study could be utilized as a software program to install TM/TC system for irrigation water supply by automation facilities.

Improvement of Drought Operation Criteria in Agricultural Reservoirs (농업용 저수지 이수관리를 위한 저수율 가뭄단계기준 개선)

  • Mun, Young-Sik;Nam, Won-Ho;Woo, Seung-Beom;Lee, Hee-Jin;Yang, Mi-Hye;Lee, Jong-Seo;Ha, Tae-Hyun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.4
    • /
    • pp.11-20
    • /
    • 2022
  • Currently, the operation rule of agricultural reservoirs in case of drought events follows the drought forecast warning standard of agricultural water supply. However, it is difficult to preemptively manage drought in individual reservoirs because drought forecasting standards are set according to average reservoir storage ratio such as 70%, 60%, 50%, and 40%. The equal standards based on average water level across the country could not reflect the actual drought situation in the region. In this study, we proposed the improvement of drought operation rule for agricultural reservoirs based on the percentile approach using past water level of each reservoir. The percentile approach is applied to monitor drought conditions and determine drought criteria in the U.S. Drought Monitoring (USDM). We applied the drought operation rule to reservoir storage rate in extreme 2017 spring drought year, the one of the most climatologically driest spring seasons over the 1961-2021 period of record. We counted frequency of each drought criteria which are existing and developed operation rules to compare drought operation rule determining the actual drought conditions during 2016-2017. As a result of comparing the current standard and the percentile standard with SPI6, the percentile standard showed severe-level when SPI6 showed severe drought condition, but the current standard fell short of the results. Results can be used to improve the drought operation criteria of drought events that better reflects the actual drought conditions in agricultural reservoirs.