• 제목/요약/키워드: once-through

검색결과 1,790건 처리시간 0.034초

Expert System for ABC Tuning of Once-Through Bboiler

  • Matsumura, S.;Kojima, Y.;Tozaki, T.;Shirasaka, Y.;Suzuki, M.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1989년도 한국자동제어학술회의논문집; Seoul, Korea; 27-28 Oct. 1989
    • /
    • pp.744-748
    • /
    • 1989
  • A newly developed Expert System (ES) for the tuning of thermal power plant control equipment is described. The system is furnished with the rules for controller tuning which were obtained by analysis and arranging the data and knowledge from the experts or tuning records. Based on these rules, automatic tuning or setting of the control parameters is performed in real-time base. The performance of the test equipment, a combination of ES and a boiler simulator, was examined in the automatic tuning test for steam pressure, steam temperature, and load controllers of a constant-pressure once-through boiler model. It was confirmed from the test results that the system is quite promising for future application to actual plants, since the tuning results obtained by the proposed system were similar to those by tuning experts.

  • PDF

변압운전 방식의 500MW 초임계압 석탄 화력발전소 터빈 우회계통에 제어에 관한 고찰 (A Study on Turbine Bypass System in a 500MW Rated Coal Fired Supercritical Thermal Power Plant with Sliding Pressure Operation)

  • 최인규;김종안
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.1663-1664
    • /
    • 2008
  • Many years ago, most of thermal power plants built in this country were of subcritical pressure, of medium or small size, of constant pressure operations and of drum type steam generators with circulation type boilers. But, nowadays almost all of them were of high efficiency, of supercritical pressure, of big capacity, of sliding pressure operations, and of once through type steam generators. Presently built once through boilers introduce turbine bypass systems to variable pressure operation which eliminates unexpected materials in boiler tube during startup, minimizes fuel loss by short startup period and eventually improve both total efficiency and power system stability.

  • PDF

관류형 보일러의 비선형 저자모델 개발에 관한 연구 (A Study on Development of Nonlinear Low Order Models for an Once-through Type Boiler)

  • 이재용;채석;변증남;윤명중
    • 대한전기학회논문지
    • /
    • 제36권1호
    • /
    • pp.58-67
    • /
    • 1987
  • By use of the real recorded data obtained from a power plant, nonlinear low-order state space models are developed for an once-through type power plant boiler. In order to understand the boiler dynamics and to use for the back-up controller design, the unknown model parameters have been estimated using the nonlinear estimation technique, i.e. Extended Kalman Filter method. It is shown that the simulation results coincide with the measurement data within 5% relative error range, which are acceptable from a back-up controller design point of view.

  • PDF

관류보일러를 위한 예혼합 VIStA 버너 개발 (Premixed VIStA Burner for an Once-Through Type Boiler)

  • 안준;김혁주;최규성
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.1013-1018
    • /
    • 2008
  • Vortex Inertial Staged Air (VIStA) burner for an once-through type boiler has been restored to the original premixed type to reduce nitrogen oxide (NOx) emission. The premixed version yields additional de-NOx effect by 20 ppm. The flame is formed closer to the wall at the 1st stage combustion chamber compared with the non-premixed one. The combustion characteristics are more sensitive to the air distribution for the premixed type, which necessitates proper optimization.

  • PDF

바이패스 시스템 체용 유무에 따른 증기 터빈제어 비교 (A comparison of steam turbine control systems according to adoption of turbine bypass system)

  • 최인규;김종안
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 D
    • /
    • pp.2342-2344
    • /
    • 2000
  • Many years ago, most of thermal power plants built in this country were of subcritical pressure, of medium or small size, of constant pressure operation, of drum type steam generator. But, nowadays, almost all of them were of high efficiency, of supercritical pressure, of great capacity(about 500MW), of sliding pressure operation, of once through type steam generator. Presently built once through boiler introduces turbine bypass systems to variable pressure operation which eliminates unexpected materials in boiler tube during startup, minimizes fuel loss by short startup period, eventually improves total efficiency and power system stability

  • PDF

The Simulation of Boiler System for HADONG Fossil Power Plant

  • Choi, Jin-Ho;Ma, Sam-Sun;Lee,Yong-Kwan
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 1999년도 추계학술대회 논문집
    • /
    • pp.56-61
    • /
    • 1999
  • The Simulation of Boiler System for Hadong Fossil power plant has been made by Korea Electric Power Research Institute (KERRI) in an attempt to develop Windown NT based full scope replica simulator for Hadong Fossil power plant, 500MWe once-through boiler. In the project KERRI developed Once Through, Super Critical type Boiler System, the core part of the Simulation and integrated the system with other process systems such as BOP System, and AUX System. This paper is to introduce the basic concept of the simulation for the Boiler System. It will also introduce PRO-TRAX System, for used as a modeling tool.

  • PDF

Compensation Logics of Controller in Korean Standard Super Critical Once Through Boiler

  • Kim, Eun-Gee
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2001년도 ICCAS
    • /
    • pp.65.2-65
    • /
    • 2001
  • There are not only lots of controllers such as UMC(Unit Master Controller), BMC(Boiler Master Controller), Fuel Flow controller, Air flow controller, Feed water flow controller, S/H R/H Temperature controller and so on, but also compensation controller such as BTU compensator, Fuel/Water ratio controller and O2 Co controller to take automatic control in the super critical once through boiler. It is important to make complete automation of boiler to use the compensation controller like BTU compensator. For example, In case of some boiler condition, operator has to change combustion parameter for changing the coal, on the contrary BTU compensator can calculate set value of the fuel flow and reset the fuel flow demand by itself. This paper shows us the logic and instruction regarding compensation controller of boiler that can be operated automatically.

  • PDF

Practical optimization of power transmission towers using the RBF-based ABC algorithm

  • Taheri, Faezeh;Ghasemi, Mohammad Reza;Dizangian, Babak
    • Structural Engineering and Mechanics
    • /
    • 제73권4호
    • /
    • pp.463-479
    • /
    • 2020
  • This paper is aimed to address a simultaneous optimization of the size, shape, and topology of steel lattice towers through a combination of the radial basis function (RBF) neural networks and the artificial bee colony (ABC) metaheuristic algorithm to reduce the computational time because mere metaheuristic optimization algorithms require much time for calculations. To verify the results, use has been made of the CIGRE Tower and a 132 kV transmission towers as numerical examples both based on the design requirements of the ASCE10-97, and the size, shape, and topology have been optimized (in both cases) once by the RBF neural network and once by the MSTOWER analyzer. A comparison of the results shows that the neural network-based method has been able to yield acceptable results through much less computational time.