• Title/Summary/Keyword: offshore workers

Search Result 34, Processing Time 0.024 seconds

A Study on the Trends and Development Plans for the trainee who completed BOSIET course -Focusing on the STCW and OPITO Safety Training- (해양플랜트 기초안전교육에 참여하는 교육생의 동향 분석 및 개선 방안에 대한 연구 -STCW 협약교육과 OPITO 교육 중심-)

  • WOO, Young-Jin;LEE, Chang-Hee
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.27 no.4
    • /
    • pp.938-947
    • /
    • 2015
  • As many offshore plants are built domestically, many workers get various jobs in the offshore plants directly or indirectly. But workers(including seaman and non-seaman) still have hard time to getting the job in offshore plants because they still rely on personal contacts and limitation of adaptable positions. Now people who want to work at offshore plants have to get safety training under the regulation and request of IMO/STCW and OPITO. Recently OPITO reinforced offshore safety training and discussed the mutual agreement between IMO/STCW and OPITO. Therefore this study searched legal standards for offshore plant work and the trend of offshore safety training. Base on a survey among domestic delegates who completed BOSIET course from 2010, we now understand the actual situations in finding an effective way on how to advance domestic workers in the offshore plant industry.

Self-Reported Recovery from 2-Week 12-Hour Shift Work Schedules: A 14-Day Follow-Up

  • Merkus, Suzanne L.;Holte, Kari Anne;Huysmans, Maaike A.;van de Ven, Peter M.;van Mechelen, Willem;van der Beek, Allard J.
    • Safety and Health at Work
    • /
    • v.6 no.3
    • /
    • pp.240-248
    • /
    • 2015
  • Background: Recovery from fatigue is important in maintaining night workers' health. This study compared the course of self-reported recovery after 2-week 12-hour schedules consisting of either night shifts or swing shifts (i.e., 7 night shifts followed by 7 day shifts) to such schedules consisting of only day work. Methods: Sixty-one male offshore employees-20 night workers, 16 swing shift workers, and 25 day workers-rated six questions on fatigue (sleep quality, feeling rested, physical and mental fatigue, and energy levels; scale 1-11) for 14 days after an offshore tour. After the two night-work schedules, differences on the $1^{st}$ day (main effects) and differences during the follow-up (interaction effects) were compared to day work with generalized estimating equations analysis. Results: After adjustment for confounders, significant main effects were found for sleep quality for night workers (1.41, 95% confidence interval 1.05-1.89) and swing shift workers (1.42, 95% confidence interval 1.03-1.94) when compared to day workers; their interaction terms were not statistically significant. For the remaining fatigue outcomes, no statistically significant main or interaction effects were found. Conclusion: After 2-week 12-hour night and swing shifts, only the course for sleep quality differed from that of day work. Sleep quality was poorer for night and swing shift workers on the $1^{st}$ day off and remained poorer for the 14-day follow-up. This showed that while working at night had no effect on feeling rested, tiredness, and energy levels, it had a relatively long-lasting effect on sleep quality.

A Study on Interior Space Planning of Accommodation Barge for Offshore Plant (해양플랜트 거주용 부선 실내공간계획 연구)

  • Lee, Han-Seok;Kang, Young-Hun;Doe, Geun-Young
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.4
    • /
    • pp.201-210
    • /
    • 2011
  • This study is on the space planning of accommodation area in accommodation barge, which is a kind of offshore plant supply vessel providing workers with exclusive accommodation facilities. Firstly, the space layout of accommodation area is analyzed using the general arrangement drawings of 10 actually-built accommodation barges currently in use. Secondary, the design guides and standards for living quarters of offshore plants issued from overseas classification societies such as ABS, NORSOK etc. are analyzed and based on the analysis design guidelines for accommodation area of accommodation barge are newly suggested. Thirdly, a model of accommodation area in accommodation barge is set up and space arrangements and movement lines for each deck of the accommodation area of the model are planned. Fourthly, cabins, dinning room and galley, recreation spaces, and sanitary spaces of the accommodation area of the model are planned. The results of this study may be summarized as follows. An accommodation barge has 'barge deck' for small scale work and material storage, and 'accommodation area' for the living and resting of workers. The accommodation area is made of workers accommodation sector, service sector, crew sector and business sector. The interior design guidelines for accommodation area of accommodation barge should be made soon by Korea Register of Shipping.

A Study on the Concave Type Hull Plate Forming using Induction Heating System (고주파 유도가열을 이용한 오목 곡면 곡가공에 관한 연구)

  • Hyun, Chung Min;Kim, Dae Kyung;Mun, Seung Hwan;Park, Jung Seo;Dohr, Kyu Won
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.56 no.2
    • /
    • pp.128-134
    • /
    • 2019
  • In shipbuilding, accurate fabrication of curved hull plates is one of the most important steps, since the shape of ship hull, which is very critical in the overall performance of a ship, is a collection of such plates. The curved hull plates forming process requires a significant amount of time by skilled workers in shipbuilding. In general, the workers cause thermal distortion in the plate and forming initial shape using gas heat source. So shipbuilding companies need skilled workers who have long experience. To solve the problem, a lot of researchers tried to develop automation system for curved hull plates. In this paper, we propose automatic heating system with gantry robot, high frequency induction heater to replace the gas heat source and automatic measurement system. We apply the system to forming concave type plate that is actually used in ship manufacturing. In addition, a system was developed to automatically generate heating information, such as the heating location and the heating speed, for actual heating process. Then the system was applied to the actual heating material. It is shown that the proposed triangle heating pattern makes desired concave shape successfully. The induction heating system showed that it can be used for automation system of curved hull plates forming process replacing gas heat source.

Policy Suggestions to Retain Skilled Migrant Fishermen in Korea : Focus on Offshore Fishing (숙련 외국인 어선원 확보를 위한 제도 개선 방안 : 연근해 어업을 중심으로)

  • Chaemin Hyun;Seori Choi
    • The Journal of Fisheries Business Administration
    • /
    • v.54 no.1
    • /
    • pp.1-22
    • /
    • 2023
  • With the restriction of foreigners' entry into Korea due to the COVID-19 pandemic, the fishery industry faced significant challenges in supplying migrant workers. In response to this, there is growing interest in methods that could facilitate the stable employment of migrant workers. This paper investigates whether the current system used for the employment of migrant workers in the fishery industry, which is highly dependent on them, adequately performs its function of providing a stable and skilled workforce amid the intensified labor shortage resulting from decreasing numbers of households with employment in the fishery and the aging Korean fishermen. To this end, past studies and government documents pertaining to the current system were analyzed, and a survey targeting the owners of offshore fishing boats that employ migrant workers was conducted. A total of 147 owners of fishing boats responded to the survey, and the data of 499 migrant workers employed by them were used for the analysis. The analysis indicated that the migrant fishermen had difficulty in acquiring minimum scores for the change of visa status according to the criteria for the Skilled Worker Points System. Furthermore, distinct differences were found between the characteristics and working conditions of migrant workers employed through the Employment Permit System (EPS) and the Foreign Seamen System. Based on this result, this paper suggests the reorganization of the skilled migrant worker system in the fishery industry and the expansion of the regional specialized visa pilot project.

Vibration control for serviceability enhancement of offshore platforms against environmental loadings

  • Lin, Chih-Shiuan;Liu, Feifei;Zhang, Jigang;Wang, Jer-Fu;Lin, Chi-Chang
    • Smart Structures and Systems
    • /
    • v.24 no.3
    • /
    • pp.403-414
    • /
    • 2019
  • Offshore drilling has become a key process for obtaining oil. Offshore platforms have many applications, including oil exploration and production, navigation, ship loading and unloading, and bridge and causeway support. However, vibration problems caused by severe environmental loads, such as ice, wave, wind, and seismic loads, threaten the functionality of platform facilities and the comfort of workers. These concerns may result in piping failures, unsatisfactory equipment reliability, and safety concerns. Therefore, the vibration control of offshore platforms is essential for assuring structural safety, equipment functionality, and human comfort. In this study, an optimal multiple tuned mass damper (MTMD) system was proposed to mitigate the excessive vibration of a three-dimensional offshore platform under ice and earthquake loadings. The MTMD system was designed to control the first few dominant coupled modes. The optimal placement and system parameters of the MTMD are determined based on controlled modal properties. Numerical simulation results show that the proposed MTMD system can effectively reduce the displacement and acceleration responses of the offshore platform, thus improving safety and serviceability. Moreover, this study proposes an optimal design procedure for the MTMD system to determine the optimal location, moving direction, and system parameters of each unit of the tuned mass damper.

Identification of Hazards for Offshore Drilling through Accident Statistics and JSA-based Risk Reduction (사고 통계 분석을 통한 해양 시추작업 위험요소 제시 및 JSA 기반 위험저감 방안)

  • Noh, Hyonjeong;Kang, Kwangu;Park, Min-Bong;Kim, Hyungwoo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.865-874
    • /
    • 2020
  • Offshore drilling units have a very dangerous working conditions due to the harsh working environment of the ocean and the high possibility of fire or explosion. This study would identify the hazards that emerge from the marine environment in the operation and maintenance phase of offshore drilling units and show how these hazards can be reduced through risk assessment/management. Various risk reduction and management measures were first reviewed, and Job Safety Analysis (JSA) was selected as the risk assessment technique of this study. In order to understand the characteristics of offshore drilling operations, accident statistics of onshore and offshore drilling were analyzed and compared with each other, and major risk factors for offshore drilling were derived. The jobs in which offshore drilling accidents occur more frequently than onshore drilling was analyzed as the job of fastening, transporting and moving pipes and various materials. This result is due to the limited space of the ocean and the work environment that is prone to being shaken by wind, waves and ocean currents. Based on these statistical results, the job of picking and making up drill pipes was selected as a high-risk job, and JSA was performed as an example. A detailed safety check procedure is proposed so that workers can fully recognize the danger and perform work in a safe state that has been confirmed.

Development of Offshore Construction ROV System applying Pneumatic Gripper (공압 gripper를 적용한 해양 건설 ROV 시스템 개발)

  • Park, Jihyun;Hwang, Yoseop
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.11
    • /
    • pp.1697-1705
    • /
    • 2022
  • The safety of marine construction workers and marine pollution problems are occurring due to large-scale offshore construction. In particular, underwater construction work in the sea has a higher risk than other work, so it is necessary to apply an unmanned alternative system that considers the safety of the workers. In this paper, the ROV system for offshore construction has been developed for underwater unmanned work. A monitoring system was developed for position control through the control of underwater propellants, pneumatic gripper, and monitoring of underwater work. As a result of the performance evaluation, the underwater movement speed of the ROV was evaluated to be 0.89 m/s, and it was confirmed that the maximum load of the pneumatic gripper was 80 kg. In addition, the network bandwidth required for underwater ROV control and underwater video streaming was evaluated to be more than 300Mbps, wired communication at 92.7 ~ 95.0Mbit/s at 205m, and wireless communication at 78.3 ~ 84.8Mbit/s.

A Study on Assessment of Stress at Work between White and Blue Collar Workers in Shipyard (조선업에서 사무직과 생산직 근로자의 직무스트레스 평가에 관한 연구)

  • Jeong, Hyunwook;Kim, Yuchang
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.80-85
    • /
    • 2015
  • In recent years, Korea's shipbuilding industry have expanded its business into offshore plant. These changes are increasing the interest on job stress in shipbuilding industry. The purpose of this study is to investigate the differences of job stressors between white and blue-collar workers. The survey was using Korean Occupational Stress Scale(KOSS) questionnaire and was administered to 8,080 workers of large shipyard company. As a result of the survey, compared with the median score of Korean workers, job stress level of shipyard company workers was low. However, seven categories of KOSS, except for job demand showed higher stress levels of blue-collar workers than white-collar workers. The overall stress level of shipyard company workers is low, however, it is important to find stressors by considering the type of work, working period etc., through a detailed analysis of KOSS 8-categories. The results of this study may be helpful to identify the level of stress and to establish preventive measures in Shipyard Company.

Design and Structure Analysis of a Tower Service Lift for Offshore Wind Power System (해상풍력발전시스템 타워서비스리프트 설계 및 구조해석)

  • Choi, Young-Do;Son, Sung-Woo;Jang, Ho-Choul;Choi, Nak-Joon
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.36 no.1
    • /
    • pp.101-108
    • /
    • 2012
  • The purpose of this study is to establish a design method of tower service lift for offshore wind power system, as well as to conduct structure analysis of the service lift system. The service lift system will be built in the internal area of tower of the offshore wind power system. Design and structure analysis for the tower service lift system are conducted to clarify the stability and reliability of the system. Main objective of the design is to secure sufficient capability of transportation of workers and equipment with satisfactory performance within the designed tolerance limit. Total deformation and equivalent stress of the lift system by external load are examined using the results of structure analysis.