Research on optimal cost calculation for efficient maintenance of offshore wind farms (해상풍력단지의 효율적인 유지보수를 위한 최적 비용 산출 연구)

  • Hui-Seok Gu;In-Cheol Kim;Man-Bok Kim;Man-Soo Choi
    • Journal of Wind Energy
    • /
    • v.14 no.3
    • /
    • pp.61-68
    • /
    • 2023
  • This paper aims to perform optimal operation and maintenance with an integrated monitoring system for offshore wind platforms. Based on the wind direction and wind speed data of existing wind farms, a monitoring system was established along with weather and weather data to maximize the operational efficiency of wind farms. Compared to wind power on land, offshore wind power is difficult to maintain due to weather, logistics and geographical limitations. Therefore, economic analysis of actual operation and maintenance is essential for large-scale offshore wind farms. In this paper, the availability of offshore wind farms was analyzed by using personnel resources, parts inventory, Crew Transfer Vessel (CTV) and Specialized service Operation Vessel (SOV) etc. before the actual operation and maintenance of wind farms. A comparative analysis was conducted to determine the optimum operating efficiency and economical maintenance costs.

Development and Operation of Durability Mock-Up Test Facilities for Offshore Electricity Structures (해상 전력구조물 내구성 실증 실험장 구축 및 운영)

  • Pang Gi-Sung;Han Sang-Mook;Song Young-Chul;Kwon Byeong-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05b
    • /
    • pp.265-268
    • /
    • 2005
  • This paper discusses a strategy and status for development and operation of durability mock-up test facilities for offshore structures. The strategy is examplified and facilitated using an offshore transmission tower crossing the West sea and the Shihwha lake, which was designed and constructed 345kV T/L lines transmitting power from Yeong-Heung fossil power plant to Seoul metropolitan area. Various data for corrosion protection, aging, life-prediction of concrete and steel offshore structures can be obtained using the proposed mock-up test facility. Acquired data will be used for further research on durability, life-prediction, and retrofit of structures. It is important to maintain the safety of 345 kV Yeong-Heung transmission line crossing the Shihwha lake because the offshore structure is one of the critical electric facilities transmitting large power to the metropolitan area. Operation of the offshore transmission tower mock-up is expected to make a significant contribution to stable power supply.

  • PDF

A Study on the Abnormal and Fault Reproduction Method for Smart Monitoring of Thrust Bearing in Wave Power Generation System (파력발전 시스템 쓰러스트 베어링의 스마트 모니터링을 위한 이상 및 고장 운용 재현 방법에 관한 연구)

  • Oh, Jaewon;Min, Cheonhong;Sung, Kiyoung;Kang, Kwangu;Noh, Hyon-Jeong;Kim, Taewook;Cho, Sugil
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.835-842
    • /
    • 2020
  • This paper considers a method of reproducing abnormal and fault operation for smart monitoring of thrust bearing used in wave power generation system. In order to develop smart monitoring technology, abnormal and failure data of actual equipment are required. However, it is impossible to artificially break down the actual equipment in operation due to safety and cost. To tackle this problem, a test bed that can secure data through reproduction of a faulty operating environment should be developed. Therefore, in this study, test bed that can reproduce each situation was developed and the operation result was analysis after identifying the situation to be reproduced through the failure factor analysis of the thrust bearing.

An Upending Stability for Offshore Jacket (대형 해양 자켓의 직립 안정성 고찰)

  • Jo, C.H.;Kim, B.H.;Jeong, H.
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.203-207
    • /
    • 2003
  • As the upending is one of the critical steps in the installation of offshore structure, datail procedure of upending operation is studied in the paper. For larger offshore structure installation, launching method is often applied. However after launching, the upending process is to be followed. To ensure successful upending operation, datail process is analysed considering various factors affecting on the operation including reserved buoyancy, free flotation position, seabed clearance, ballast and hook load. To investigate the influence of each factor on the procedure, twelve numerical jacket models with various dimensions are simulated and studied. From the study, it is revealed that the increase of buoyance and decrease of self weight generate a large seabed clearance. The law seabed clearance during flooding creates higher hook load and height. The paper also introduces a guideline for the related structure design and construction with the effects of contribution factors in the upending operation.

  • PDF

A Case Study on the Risk Assessment for Offshore Plant Solid Desiccant Dehydration Package by using HAZOP (HAZOP을 통한 해양플랜트 흡착식 탈수공정 패키지의 위험성평가 및 안전도 향상 방안)

  • Noh, Hyonjeong;Park, SangHyun;Cho, Su-gil;Kang, Kwangu;Kim, Hyungwoo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.4_2
    • /
    • pp.569-581
    • /
    • 2020
  • Since the dehydration packages of offshore plant deal directly with oil & gas, there is a great risk of fire and explosion during operation. Therefore, this study performed risk assessment through HAZard & OPerability (HAZOP) for solid desiccant dehydration package that can remove water component of natural gas in offshore floating liquefied natural gas (LNG) production facilities below 0.1 ppmv. The risk matrix was determined by dividing the likelihood and the severity into five levels separately by asset, life, environment and reputation. The piping & instrumentation diagram (P&ID) of the dehydration package was divided into 9 nodes. Total 22 deviations were assessed in consideration of the adsorption and desorption conversion cycle. A risk assessment based on deviations revealed 14 major hazards. Three representative types of hazards were open/close failure of the control valve, control failure of the heater, and abnormal operation of the regeneration gas cooler. Finally, we proposed the installation of additional safety devices to improve safety against these major hazards, such as safety instrumented functions, alarms, etc.

Analysis of Economical Validity about Offshore Cage Culture for Cod (외해 가두리 대구 양식업 경제적 타당성 분석)

  • LEE, Kwang-Nam
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.6
    • /
    • pp.1724-1738
    • /
    • 2016
  • This paper was researched on economic feasibility and sensibility of operation to offshore cage culture for cod. Offshore cage culture for cod needs to invest high budget what to construction and operation. And it was required variety methods about analysis of economic feasibility. Therefore, these were studied NPV, B/C and sensitivity for each by assuming a six scenarios considering the product performance according to the size of cod and culturing methods of fingerlings, etc. As a results, even though economy, if efficiency is low, it is a priority need the technical development to promote the feed efficiency to increase economic feasibility and should make efforts to enhance the business economy to strengthen the price competitiveness pricing with high quality products through quality control and brand recognition of cod. It expects to be used as a reference for related research in the future by deriving policy implications based on the method of analysis of the economic feasibility on offshore cage culture for cod.

Identification of Hazards for Offshore Drilling through Accident Statistics and JSA-based Risk Reduction (사고 통계 분석을 통한 해양 시추작업 위험요소 제시 및 JSA 기반 위험저감 방안)

  • Noh, Hyonjeong;Kang, Kwangu;Park, Min-Bong;Kim, Hyungwoo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.865-874
    • /
    • 2020
  • Offshore drilling units have a very dangerous working conditions due to the harsh working environment of the ocean and the high possibility of fire or explosion. This study would identify the hazards that emerge from the marine environment in the operation and maintenance phase of offshore drilling units and show how these hazards can be reduced through risk assessment/management. Various risk reduction and management measures were first reviewed, and Job Safety Analysis (JSA) was selected as the risk assessment technique of this study. In order to understand the characteristics of offshore drilling operations, accident statistics of onshore and offshore drilling were analyzed and compared with each other, and major risk factors for offshore drilling were derived. The jobs in which offshore drilling accidents occur more frequently than onshore drilling was analyzed as the job of fastening, transporting and moving pipes and various materials. This result is due to the limited space of the ocean and the work environment that is prone to being shaken by wind, waves and ocean currents. Based on these statistical results, the job of picking and making up drill pipes was selected as a high-risk job, and JSA was performed as an example. A detailed safety check procedure is proposed so that workers can fully recognize the danger and perform work in a safe state that has been confirmed.

Offshore Platform Installation Simulation Using Real-Time Maneuvering and Operation Simulator (Real-Time 조종 및 작업 시뮬레이터를 활용한 해양구조물 설치 작업 시뮬레이션)

  • Jonghyeon Lee;Solyoung Han;Dong-Woo Park
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.1
    • /
    • pp.67-75
    • /
    • 2023
  • In this study, the dynamic characteristics of an offshore platform being installed and physical phenomena are analyzed from the perspective of interaction between operation and maneuvering simulation using a real-time Maneuvering & Operation simulator of Shipbuilding & Marine Simulation Center at Tongmyong University. It was simulated to install the semi-submersible drilling rig moored by 8 mooring lines according to a scenario that is similar to it on the real sea, and 4 tug boats for position keeping of the rig and an offshore support vessel for hook-up of the mooring lines were operated. During the simulation, the motion, trajectory, tension of the objects were output in real time, and they were analyzed at each work procedure. This study about the simultaneous simulation of operation and maneuvering showed the detailed motion of the offshore platform and ships on the operation procedure and the interaction between operation and maneuvering in specific environment condition. Also, it confirmed that the simulation can be utilized to determine the possibility of offshore platform installation in specific situations.

Parametric Modeling and Shape Optimization of Offshore Structures

  • Birk, Lothar
    • International Journal of CAD/CAM
    • /
    • v.6 no.1
    • /
    • pp.29-40
    • /
    • 2006
  • The paper presents an optimization system which integrates a parametric design tool, 3D diffraction-radiation analysis and hydrodynamic performance assessment based on short and long term wave statistics. Controlled by formal optimization strategies the system is able to design offshore structure hulls with superior seakeeping qualities. The parametric modeling tool enables the designer to specify the geometric characteristics of the design from displacement over principal dimensions down to local shape properties. The computer generates the hull form and passes it on to the hydrodynamic analysis, which computes response amplitude operators (RAOs) for forces and motions. Combining the RAOs with short and long-term wave statistics provides a realistic assessment of the quality of the design. The optimization algorithm changes selected shape parameters in order to minimize forces and motions, thus increasing availability and safety of the system. Constraints ensure that only feasible designs with sufficient stability in operation and survival condition are generated. As an example the optimization study of a semisubmersible is discussed. It illustrates how offshore structures can be optimized for a specific target area of operation.