• 제목/요약/키워드: offshore

검색결과 3,503건 처리시간 0.027초

해상풍력용 해저케이블 산업 및 기술기준 동향 (Trend of Industry and Standard related to Offshore Cable for Offshore Wind Farm)

  • 김경화;송용운;김미영;김만응
    • 풍력에너지저널
    • /
    • 제3권2호
    • /
    • pp.11-17
    • /
    • 2012
  • An offshore(submarine) cable has been used for more than a century, however it has been used mainly for communication or power supply to near-shore island. Therefore, offshore cable has not been got more attention than other types of cable and the related standards have also not been established well. However wind farms have been shifting from land to offshore because of better wind condition. Consequently, it has been pushing up demand for offshore cable. Hence, this paper introduces the trend of offshore cable industry and related standards or recommendations only focusing on offshore wind farm. In details, the installed offshore cables in offshore wind farms, the main offshore cable makers and up to date technologies are covered. In addition, the related standards or recommendations are also analyzed and compared each other.

History of Offshore Engineering Development

  • 최한석
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2006년 창립20주년기념 정기학술대회 및 국제워크샵
    • /
    • pp.249-252
    • /
    • 2006
  • This paper introduces a review and literature study of offshore engineering and constructions from 1920s to 2000s. The study was focused on the literature survey and the history of Brown & Root and J. Ray McDermott in the Gulf of Mexico and other offshore areas Understanding the offshore history and background of offshore development is an essential ingredient for the initial conceptual design. This study was motivated to enhance the capacity of conceptual design and Front End Engineering Design (FEED) of offshore structures in Korea.

  • PDF

국내 해상풍력발전단지의 경제성 분석 (Economic Evaluation of Offshore Wind Farm in Korea)

  • 민창기;허돈;박종근
    • 전기학회논문지
    • /
    • 제63권9호
    • /
    • pp.1192-1198
    • /
    • 2014
  • With an increase in the penetration of offshore wind farm, the need of an accurate economic evaluation of offshore wind farm has become crucial. This paper presents an economic evaluation method of offshore wind farm in Korea reflecting the cost of offshore wind farm infrastructure (offshore substation, submarine cable and foundation) in its cost model. Each cost of offshore substation, submarine cable, and foundation is represented as a function of installed capacity, distance to shore, and water level, respectively. We have applied the method to the case study of offshore in Jeju Island and analyzed the economics under various conditions. The results show that the distance to shore is of importance in economics of offshore wind farm.

시장 수요를 고려한 Offshore Production의 최적화 설계 (Optimal design of offshore production considering market demand)

  • 김창수;김시화
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2014년도 추계학술대회
    • /
    • pp.53-55
    • /
    • 2014
  • Offshore 에서의 oil & gas 생산은 해상이라는 환경으로 인한 고유의 특성 때문에 항상 다수의 변수들에 영향을 받으며, 막대한 비용이 소요되기 때문에 비용을 최소화하며, 비용 대비 수익을 최대화시키기 위한 optimal design이 필수이다. 본 논문은 가상의 offshore plant와 이에서 생산된 oil의 수요지들을 설정하여 시장수요에 따른 offshore 생산의 최적화 문제를 연구대상으로 하며, 다수의 offshore oil fields를 보유한 major oil company가 당면할 수 있는 offshore production에 관한 문제를 일반화하여 정의하고, 이윤을 극대화시킬 수 있는 최적화 모형을 혼합정수계획모형(mixed integer programming)으로 정식화 하였다. 최적화 모형의 해는 Microsoft office excel solver를 통해 구하였으며 그 계산실험의 결과를 요약하여 보고한다.

  • PDF

해양시설 용어 정의 및 분류 체계에 관한 일고찰 (A Study for Definition and Classification of Offshore Units)

  • 임영섭;권도중;이창희
    • 수산해양교육연구
    • /
    • 제29권3호
    • /
    • pp.689-701
    • /
    • 2017
  • In recent offshore industries, various ambiguous terms have been used without clear definition or classification, causing difficulties in legal, technical, and educational understanding and usage. For an example, the commonly used term of 'Offshore Plant' in Korea is not an universal word technically. There has been no clear technical or legal definition about the 'Offshore Plant' and its classification is also very ambiguous; sometimes it is used to refer offshore oil and gas production platform or it is used to mean offshore renewable power generation plant in some cases. To build a conceptual framework, therefore, this paper suggests a classification of offshore units (1) using internationally agreed terms, (2) agreed with the technical classification used by the ship classification society and (3) being able to include not only the current but also future concepts of offshore units.

Integrated engineering environment for the process FEED of offshore oil and gas production plants

  • Hwang, Ji-Hyun;Roh, Myung-Il;Lee, Kyu-Yeul
    • Ocean Systems Engineering
    • /
    • 제2권1호
    • /
    • pp.49-68
    • /
    • 2012
  • In this paper, an offshore process front end engineering design (FEED) method is systematically introduced and reviewed to enable efficient offshore oil and gas production plant engineering. An integrated process engineering environment is also presented for the topside systems of a liquefied natural gas floating production, storage, and offloading (LNG FPSO) unit, based on the concepts and procedures for the process FEED of general offshore production plants. Various activities of the general process FEED scheme are first summarized, and then the offshore process FEED method, which is applicable to all types of offshore oil and gas production plants, is presented. The integrated process engineering environment is presented according to the aforementioned FEED method. Finally, the offshore process FEED method is applied to the topside systems of an LNG FPSO in order to verify the validity and applicability of the FEED method.

근해어업 생산함수 추정을 이용한 규모수익 및 한계생산성 분석 (Analysis of Marginal Productivity and Return to Scale Using Estimation of Production Function in Offshore Fisheries)

  • 심성현;남종오
    • Ocean and Polar Research
    • /
    • 제39권4호
    • /
    • pp.301-318
    • /
    • 2017
  • The production of Korean offshore fisheries has been gradually decreasing due to the severe depletion of offshore fisheries resources caused by excessive fishing efforts. The production of the offshore fisheries in 2016 was the lowest since 1975. So the federal and local governments in Korea adopted and implemented various fisheries management plans and policies in order to restore fisheries resources. However, these plans and polices have not been successful in re-establishing fisheries resources. Thus, in order to accurately diagnose the situation with regard to offshore fisheries, this study sought to estimate not only the return to scale by fishing gear of offshore fisheries, but marginal productivity of individual fishing gear based on production factors derived from offshore fisheries production functions. The study was organized in the following manner. First of all, this study estimates production functions of offshore fisheries. The Cobb-Douglas and the translog production functions are adopted as offshore fisheries production functions. Specifically, the functions are estimated by crew, vessels, and offshore resource as production factors. The offshore resource is estimated by the Clarke Yoshimoto Pooley model based on the surplus production model. Secondly, the fisheries production functions are extended to the fixed-effect model and the random-effect model with panel data. Thirdly, this study analyzes the return to scale of offshore fisheries and the marginal productivity of the production factors from the estimated offshore fisheries production function. In conclusion, this study suggests plans and countermeasures for productivity improvement by group (labor intensive or technology intensive) based on the characteristics of individual offshore fishing gear.

해상 지반조사 분야의 기술 동향 (Technical Trend of Offshore Geotechnical Site Investigations)

  • 조성민
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2007년 가을학술발표회
    • /
    • pp.639-653
    • /
    • 2007
  • Offshore geotechnical site investigation of the seabed ground has been a key factor of the successful construction of various types of offshore structures like as sea-crossing bridges, submerged tunnels, and other marine facilities. Offshore investigations are not easy tasks because of the wave, wind, tidal ebb and flows, and others. Recent developments of offshore equipment including platforms and testing devices like as maine cone penetrator have inspired us to get more reliable characteristics of the seafloor. General information on the offshore site investigations and technical trends concerned are introduced.

  • PDF

Challenges and Strategies for Commissioning of FLNG

  • Lee, Dong Hyun;Seo, Kwang Su;Yeo, Jong Su;Kim, Myung Ki
    • Journal of Advanced Research in Ocean Engineering
    • /
    • 제2권3호
    • /
    • pp.129-135
    • /
    • 2016
  • After the construction of offshore plants, the function and integrity of system in offshore plants should be commissioned. As the executor of many FLNG projects, Samsung Heavy Industries Co., Ltd has faced some challenges for commissioning which are not similar to those in other offshore project. This study shows the differences between the commissioning of typical offshore projects and the one of FLNG projects. By the characteristics of offshore, performing the commissioning activity of FLNG near shipyard as much as possible reduces the risk of malfunction. The possible solutions to achieve these strategies are introduced.

A Study on the Entry of Korean Shipping & Logistics Company into the Offshore Plant Logistics Service Market

  • Shin, Seok-Hyun;Kwon, Moon-Kyu;Park, Jin-Hee;Park, Young-Kyu
    • 한국항해항만학회지
    • /
    • 제39권2호
    • /
    • pp.125-130
    • /
    • 2015
  • Korea is worldwide top manufacturer of offshore plant industry, while shown weakness in high-valued offshore plant service industry (OPSI). The governmental support policies and studies for fostering programs are centered on shipbuilding and engineering sector. On the other hand, offshore logistics service sector among the programs is neither included as governmental fostering support sectors nor ever-studied. Domestic shipping and logistics companies have many experience of handling various project, heavy-lift cargo and even super blocks on shipbuilding industry. However they are faced with lack of appropriate heavy carrier and others. So for their successful entering into offshore plant logistics market, systematic preparation, studies and supporting policies are highly recommended.