• 제목/요약/키워드: off-time

Search Result 3,740, Processing Time 0.033 seconds

A Comparative Study Between On-Pump and Off-Pump Coronary Artery Bypass Grafting on Clinical Outcomes

  • Moon Seong-Min;Choi Seok-Cheol
    • Biomedical Science Letters
    • /
    • v.10 no.3
    • /
    • pp.237-243
    • /
    • 2004
  • In recent, many cardiac centers have preferred off-pump coronary artery bypass grafting (CABG) to on-pump CABG to prevent the adverse effects of cardiopulmonary bypass. The present study was performed to prove beneficial effects of off-pump CABG. Sixty adult patients scheduled for elective CABG were randomly assigned to On-pump group (n=30) or Off-pump group (n=30). Arterial blood samples were drawn before and after the operation (Pre-OP and Post-OP, respectively) for measuring CBC, prothrombin time, activated thromboplastine time, blood gas analysis, creatine kinase-MB (CK-MB) level, and lactate dehydrogenase (LDH) level. Perioperative parameters including heparin and protamine usages, complications, blood components usages, blood loss, ventilation and ICU-staying time, and hospitalization were also evaluated. Platelet count at Post-OP was high in Off-pump group whereas CK-MB and LDH levels were low compared with On-pump group. Off-pump group had significantly lower heparin and protamine usages, lower total leukocyte count, higher hematocrit and hemoglobin levels, less blood loss, lower usages of blood components, shorter ventilation and ICU-staying time, and lower incidence of pleural effusion than On-pump group. Other variables did not significantly differ between two groups. These results showed that Off-pump CABG was a satisfactory technique with less inflammatory reaction, less cardiac damage, less postoperative complications, and less cost.

  • PDF

A Study on the Runoff Characteristics m Kangwon Watershed (So-yang River Watershed) (강원도 유역의 유출 특성에 관한 연구 (소양강댐 유역 중심으로))

  • Choi, Han-Kyu;Beak, Hyo-Sun;Lee, Min-Seop
    • Journal of Industrial Technology
    • /
    • v.21 no.B
    • /
    • pp.223-232
    • /
    • 2001
  • This study is finding the most appropriate model of kangwondo watershed. To synthesize each hydrograph, It is found to several parameters which are used in existing hydrographes. then the synthestic hydrograph is compared and investigated with many hydrographes of the rivers in kanwondo. These methods, Nakayasu, Clark, SCS are used to calculate the run-off of this watershed. When the calculated run-off is compared with real rating-curves, then it is found that the SCS method using the Clark's concentrantion time is the best way on this area having large watershed, long river length and gentle water slope, the Nakayasu method is more suitable on this area having small watershed, short river length and steep water slope. Also it is founded from analyzing run-off hydrographes, peak run-off and peak time that the Clark's method applied Kirpich's concentration time way is suitable in the area of kangwondo.

  • PDF

A Study on the Characteristics of Nanodiamond Films with the Gas Flow Control (가스 유량제어에 의한 나노다이아몬드 박막의 특성연구)

  • Kim, Tae-Gyu;Kim, Chang-Hoon
    • Journal of the Korean institute of surface engineering
    • /
    • v.39 no.4
    • /
    • pp.153-159
    • /
    • 2006
  • Nanodiamond films were deposited on Si substrate by introducing a time dependent on/off modulation of $CH_4\;and\;O_2$ flows in a vertical-type microwave plasma enhanced chemical vapor deposition system. Surface morphology and diamond quality of the film were investigated as a function of the on/off modulation time interval. The diamond nucleation density on the substrate was enhanced under low temperature and low pressure condition. In addition, the diamond nucleation density was enhanced by increasing the on/off modulation time interval. Enhanced diamond quality was noticeable under the condition of a longer on/off modulation time interval. It was suggested that the nanodiamond nuclei formed the cluster formation.

A Study on Optimization Model of Time-Cost Trade-off Analysisusing Particle Swarm Optimization (Particle Swarm Optimization을 이용한 공기-비용 절충관계 최적화 모델에 관한 연구)

  • Park, U-Yeol;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.91-98
    • /
    • 2008
  • It is time-consuming and difficulty to solve the time-cost trade-off problems, as there are trade-offs between time and cost to complete the activities in construction projects and this problems do not have unique solutions. Typically, heuristic methods, mathematical models and GA models has been used to solve this problems. As heuristic methods and mathematical models are have weakness in solving the time-cost trade-off problems, GA based model has been studied widely in recent. This paper suggests the time-cost trade-off optimization algorithm using particle swarm optimization. The traditional particle swarm optimization model is modified to generate optimal tradeoffs among construction time and cost efficiently. An application example is analyzed to illustrate the use of the suggested algorithm and demonstrate its capabilities in generating optimal tradeoffs among construction time and cost. Future applications of the model are suggested in the conclusion.

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • v.71 no.2
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

The Rice and Barley Farm Couples' Time Use Patterns (미맥 농가부부의 생활시간구조)

  • Han, Young-Sun;Lee, Yon-Suk
    • Journal of Family Resource Management and Policy Review
    • /
    • v.11 no.2
    • /
    • pp.111-132
    • /
    • 2007
  • The purposes of this study are to analyze the time use patterns of rice and barley for farm couples. The data used for this study were collected from farm households during the farming seasons (17th to 30th June) and the off-farming seasons (28th November to 11th December) of 2005, using a time diary. The sample for this study consisted of 118 couples, whose principal crops were rice and barley, living in rural area in eight provinces. SPSS Win 12.0 was utilized to analyze the data. The statistical methods used were frequency, percentage and paired t-test. The major findings of this study were as follows. First, the personal care time of wives was shorter than that of husbands, regardless of the fanning period, with the couples showing more personal care time during the off-farming season than during the farming season. Secondly, the total work(paid work plus housework) time of wives was longer than that of husbands during both the farming season and the off-farming season, showing that the labor burden of wives was bigger than that of husbands. Compared to the farming season, the total work time for both husbands and wives was shorter during the off-farming season, due to reduced farm work time, but the housework time increased for both husbands and wives. Thirdly, the leisure time of husbands was longer than that of wives during both seasons. The leisure time increased for both husbands and wives during the off-farming season, but the portion of the increase was bigger for husbands than for wives.

  • PDF

The Effects of Lift-Off from Wall Thinning Signal in Pulsed Eddy Current Testing

  • Park, Duck-Gun;Angani, C.S.;Kishore, M.B.;Kim, C.G.;Lee, D.H.
    • Journal of Magnetics
    • /
    • v.17 no.4
    • /
    • pp.298-301
    • /
    • 2012
  • In order to know the effect of surface irregularity in the detection of local wall thinning of pipeline using pulsed eddy current (PEC), the lift-off effects on PEC signal have been investigated. Three kinds of parameters in the PEC signal, which is "peak amplitude", "time to peak amplitude" and "time to zero crossing" are analyzed to separate the lift-off effects in the PEC signal. The distance from sensor to the bottom of sample which is the total thickness of combined insulator and sample is kept constant. The magnitude of the differential peak amplitude is increased with increasing sample thickness, the time to peak amplitude is increased with increasing the sample thickness. To determine the effect of lift-off, a number of balanced transient responses combining wall thinning locations and lift-off distances were plotted.

Real-time communication in an off-line programming (오프라인 프로그래밍에서의 실시간 통신)

  • Song, Jong-Tak;Son, Kwon;Lee, Min-Chul
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.40-43
    • /
    • 1996
  • An off-line programming, OLP, system is widely used in automation fines. To help an on-line robot system to carry out desirable tasks planned by the off-line simulation, an approach to the real-time communication is presented. The OLP system developed consists of a software, a host computer(PC), a SCARA robot body, four servo drivers, and four independent joint controllers. This study focuses on the software where real-time communication is included. The software, can be used in teaching, trajectory planning, real-time running, and performance evaluation. The evaluation of different control algorithms is one of the merits of the software. The software can give servo commands for task running. A comparison of generated and corresponding actual trajectories provides the evaluation of task performance. The safety, of the OLP system is ensured by alarming malfuntions of the system. The OLP system developed can reduce the teaching time and increase the user's convenience.

  • PDF

Dynamic Shutdown of Server Power Mode Control for Saving Energy in a Server Cluster Environment (서버 클러스터 환경에서 에너지 절약을 위한 서버 전원 모드 제어에서의 동적 종료)

  • Kim, Hoyeon;Ham, Chihwan;Kwak, Hukeun;Chung, Kyusik
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.2 no.7
    • /
    • pp.283-292
    • /
    • 2013
  • In order to ensure high performance, all the servers in an existing server cluster are always On regardless of number of real-time requests. They ensure QoS, but waste server power if some of them are idle. To save energy consumed by servers, the server power mode control was developed by shutdowning a server when a server is not needed. There are two types of server power mode control depending on when a server is actually turned off if the server is selected to be off: static or dynamic. In a static mode, the server power is actually turned off after a fixed time delay from the time of the server selection. In a dynamic mode, server power is actually turned off if all the services served in the server are done. This corresponds to a turn off after a variable time delay. The static mdoe has disadvantages. It takes much time to find an optimal shutdown time manually through repeated experiments. In this paper, we propose a dynamic shutdown method to overcome the disadvantages of static shutdown. The proposed method allows to guarantee user QoS with good power-saving because it automatically approaches an optimal shutdown time. We performed experiments using 30 PCs cluster. Experimental results show that the proposed dynamic shutdown method is almost same as the best static shutdown in terms of power saving, but better than the best static shutdown in terms of QoS.

A Recursive Optimization/Simulation Procedure for Express Courier Service Network Design : Determination of Terminal Capacity and Cut-off Time (택배 네트워크 설계를 위한 최적화/시뮬레이션 반복기법 : 화물터미널 용량과 수주마감시간 결정)

  • Ko, Chang Seong;Lee, Hee Jeon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.2
    • /
    • pp.282-289
    • /
    • 2007
  • While demands for express couriers service are rapidly increasing due to recent progress of electronic commerce, express courier service companies are struggling to take a larger market share through ongoing improvement in their service processes. Cut-off time is the time limit that all orders delivered before the limit are guaranteed for the delivery within the very next day. Extending cut-off time for express service centers can provide the express company with increase of total sales, but it may also cause increasing the possibility not to satisfy customer needs due to work delay in the consolidation terminal. We develop a design model for express courier service network based on a recursive optimization/simulation procedure. With the optimization model, we seek key design parameters such as the cut-off time for express service centers and the capacity of the consolidation terminal maximizing total sales profit while satisfying the desired level of performances. With the simulation model, we consider the dynamic nature of the network and obtain relationships between the design parameters and the performance measures with the multiple linear regression. The validity of the model is examined with an example.