• Title/Summary/Keyword: off-site risk

Search Result 72, Processing Time 0.03 seconds

Offsite Risk Assessment on Chloric Acid Release (염산취급시설의 사고시 사업장외에 미치는 영향평가)

  • Park, Kyoshik
    • Korean Chemical Engineering Research
    • /
    • v.54 no.6
    • /
    • pp.781-785
    • /
    • 2016
  • Chloric acid is a toxic chemical and the risk of facility handling chloric acid was assessed from the list of accident scenario to provide countermeasure to keep the vicinity safe. Accident scenarios were listed by using MSDS and process safety information. The scenarios having effect to the off-site were selected and assessed further according to guideline provided by Korea government. Worst case and alternative scenarios including other interested scenarios were evaluated using ALOHA. Each evaluated scenario was assessed further considering countermeasures. The results showed that the facility handling chloric acid is safe enough and needed no further protections at the moment.

On-line and Off-line Partial Discharge Monitoring System with HVAC Testing (HVAC에 의한 On-line, Off-line PD 모니터링)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

Development of Web-based Off-site Consequence Analysis Program and its Application for ILRT Extension (격납건물종합누설률시험 주기연장을 위한 웹기반 소외결말분석 프로그램 개발 및 적용)

  • Na, Jang-Hwan;Hwang, Seok-Won;Oh, Ji-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.5
    • /
    • pp.219-223
    • /
    • 2012
  • For an off-site consequence analysis at nuclear power plant, MELCOR Accident Consequence Code System(MACCS) II code is widely used as a software tool. In this study, the algorithm of web-based off-site consequence analysis program(OSCAP) using the MACCS II code was developed for an Integrated Leak Rate Test (ILRT) interval extension and Level 3 probabilistic safety assessment(PSA), and verification and validation(V&V) of the program was performed. The main input data for the MACCS II code are meteorological, population distribution and source term information. However, it requires lots of time and efforts to generate the main input data for an off-site consequence analysis using the MACCS II code. For example, the meteorological data are collected from each nuclear power site in real time, but the formats of the raw data collected are different from each site. To reduce the efforts and time for risk assessments, the web-based OSCAP has an automatic processing module which converts the format of the raw data collected from each site to the input data format of the MACCS II code. The program also provides an automatic function of converting the latest population data from Statistics Korea, the National Statistical Office, to the population distribution input data format of the MACCS II code. For the source term data, the program includes the release fraction of each source term category resulting from modular accident analysis program(MAAP) code analysis and the core inventory data from ORIGEN. These analysis results of each plant in Korea are stored in a database module of the web-based OSCAP, so the user can select the defaulted source term data of each plant without handling source term input data.

Effect of Proof Test of Protective System on Securing Safety of Off-site Risk Assessment (보호시스템 보증시험 적용이 장외영향평가 안전성 확보에 미치는 영향)

  • Kim, Min-Su;Kim, Jae-Young;Lee, Eun-Byeol;Yoon, Junheon;Park, Jai Hak
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.6
    • /
    • pp.46-53
    • /
    • 2017
  • The risk is expressed as consequence of damage multiplied by likelihood of failure. The installation of a protective system reduces the risk by reducing the likelihood of failure at the facility. Also, the protective system has different effects on the likelihood of failure according to the proof test cycle. However, when assessing risks in the Off-site Risk Assessment (ORA) system, the variation in risk was not reflected according to the proof test cycle of protective system. This study was conducted to examine the need for proof test and the importance of cycle setting by applying periodic proof test of the protective system to ORA. The results showed that the likelihood of failure and the risk increased with longer proof test cycle. The risk of a two-yearly proof test was eight times greater than that of a three-month cycle. From the results, the protective system needs periodic proof test. Untested protective system for a long term cannot be reliable because it is more likely to be failed state when it is called upon to operate. In order to reduce the risk to an acceptable level, it is effective to differently set the proof test cycle according to the priority. This study suggested a more systematic and accurate risk analysis standard than ORA. This standard is expected to enable an acceptable level of risk management by systematically setting the priority and proof test cycle of the protective system. It is also expected to contribute to securing the safety of chemical facilities and at the same time, will lead to the development of the ORA system.

Assessing Biosecurity Practices on Commercial Pig Farms across Korea and Risk Factors for Porcine Circovirus Type 2 Infection (국내 양돈장의 차단방역 수준 평가 및 돼지써코바이러스 2형 감염의 위험요인에 관한 연구)

  • Choi, Sung-Hyun;Pak, Son-Il
    • Journal of Veterinary Clinics
    • /
    • v.32 no.4
    • /
    • pp.324-329
    • /
    • 2015
  • The primary aim of this study was to investigate biosecurity practices in pig farms and to determine the major risk factors associated with PCV2 infection for a sampled swine population in Korea. To this end, we analyzed data from a cross-sectional study of 296 farrow-to-finish farms, which was conducted between March and September 2014 to explore the prevalence of swine disease at farm level. Face-to-face interviews by on-site visit of trained veterinarians were conducted with the farm owners or managers using a standardized questionnaires with information about basic demographical data and management practices. Farms were classified as negative or positive through the use of infection profiles that combined data on serological testing including PCR antigen test result, antibody titer and sero-conversion pattern at each age category taking into account vaccination status. Data were analyzed using multivariate ordinal logistic regression. Results from this study indicated that biosecurity level of the farms was considered not good given low compliance of the biosecurity programs and facilities in the farm: off-site removal of dead stocks (7%), off-site location of storage facility for incoming feeds (12.6%), off-site pick-up location for finishers (19.3%), restrictions on feed supplier vehicles for farm entrance (19.6%), restriction of finisher trucks entering the farm (22.4%), and restriction on manure disposal trucks entering the farm (26.4%). In the final model (n = 255), allowance of finisher truck driver to the pig unit had increased risk of infection (OR = 2.4, 95% CI 1.22-4.67) whereas farms with a sign forbidding the entrance had decreased risk of infection (OR = 0.19, 95% CI 0.10-0.58). Further comprehensive research with larger sample size is required to better understand the multifactorial characteristic that some predisposing risk factors that were not available in this study. To the best knowledge of the authors, this was the first study to use empirical data to report risk factors associated with PCV2 infection in the Korean pig farms. Results from the current study could be used to decide optimal biosecurity measures to reduce the impact of PCV2 infection to farmers and policy makers.

Discussion for Improvement of Decision System of Total Risk in Off-site Risk Assessment (화학사고 장외영향평가 제도의 종합위험도 결정 체계 개선을 위한 고찰)

  • Choi, Woosoo;Ryu, Taekwon;Kwak, Sollim;Lim, Hyeongjun;Jung, Jinhee;Lee, Jieun;Kim, Jungkon;Baek, Jongbae;Yoon, Junheon;Ryu, Jisung
    • Journal of Environmental Health Sciences
    • /
    • v.44 no.3
    • /
    • pp.217-226
    • /
    • 2018
  • Objectives: Despite the positive effects of Off-site risk assessment (ORA) system such as prevention of chemical accidents, some problems have been constantly raised. The purpose of this study is to analyze the problems that have occurred through the implementation of the ORA system for the past three years and to suggest reasonable directions for improvement in the future. Methods: In order to identify the problems with the methodology and procedure of ORA system, we analyzed statutes, administrative rules and documents related to the ORA system. A survey of ORA reviewers in National Institute of Chemical Safety was conducted to investigate the weight of determinants considered when judging the level of total risk in ORA. Results: In this study, we found out the uncertainty of the estimation of the number of people in the impact range in the procedure of the risk assessment of individual handling facilities, the lack of quantitative risk analysis methods for environmental receptors, and the ambiguity of the criteria for the total risk. In addition to suggesting solutions to the problems mentioned above, we also, suggested a decision tree for total risk in ORA. Conclusion: We anticipate that the solutions including the systematic decision tree for total risk suggested will contribute to the smooth operation of the ORA system.

Multi-unit Level 2 probabilistic safety assessment: Approaches and their application to a six-unit nuclear power plant site

  • Cho, Jaehyun;Han, Sang Hoon;Kim, Dong-San;Lim, Ho-Gon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1234-1245
    • /
    • 2018
  • The risk of multi-unit nuclear power plants (NPPs) at a site has received considerable critical attention recently. However, current probabilistic safety assessment (PSA) procedures and computer code do not support multi-unit PSA because the traditional PSA structure is mostly used for the quantification of single-unit NPP risk. In this study, the main purpose is to develop a multi-unit Level 2 PSA method and apply it to full-power operating six-unit OPR1000. Multi-unit Level 2 PSA method consists of three steps: (1) development of single-unit Level 2 PSA; (2) extracting the mapping data from plant damage state to source term category; and (3) combining multi-unit Level 1 PSA results and mapping fractions. By applying developed multi-unit Level 2 PSA method into six-unit OPR1000, site containment failure probabilities in case of loss of ultimate heat sink, loss of off-site power, tsunami, and seismic event were quantified.

A Study on the Factors Affecting the Influence Ranges of Ammonia Leakage by Using KORA Program (KORA 프로그램을 활용한 암모니아 누출사고 영향범위 결정 기여요인 연구)

  • Lim, Hyeongjun;Kwak, Sollim;Jung, Jinhee;Ryu, Taekwon;Choi, Woosoo;Lee, Jieun;Lee, Jinseon;Lee, Yeonhee;Kim, Jungkon;Yoon, Junheon;Ryu, Jisung
    • Journal of the Korean Institute of Gas
    • /
    • v.22 no.3
    • /
    • pp.38-44
    • /
    • 2018
  • Ammonia is used primarily as a refrigerant in refrigeration facility and SCR of a plant, and is frequently involved in leakage accidents. This study was conducted by selecting ammonia, a material with a wide influence range when evaluated, as a material with higher vapor pressure and lighter than air. In this study, the influence ranges were computed using KORA(Korea Off-site Risk Assessment supporting tool) with four different environmental factors : ground roughness, sealing, operating temperature, pressure, and leakage hole size. As a result, the difference in the influence range of ground roughness is approximately 4.62 times, while the ammonia storage tank shows a difference in the reduction rate of 0.64 when sealed. The extent of impact increased with increasing leakage depending on storage temperature and pressure, and when storing higher than the saturation vapor pressure, the impact range showed an average growth rate of 3.45 % per 0.1 Mpa($45^{\circ}C$). The influence ranges based on the size of the leakage holes is shown to be proportional to the area of the leakage zone.

Suggestion of Risk Assessment Methodology by Chemical Accident Based on the Environmental and Residential Receptors (화학사고로 인한 영향범위 내 환경수용체와 공공수용체를 고려한 위험도 분석방법론)

  • Choi, Woosoo;Kim, Minho;Ryu, Jisung;Kwon, Hye-Ok
    • Journal of Environmental Impact Assessment
    • /
    • v.29 no.4
    • /
    • pp.239-251
    • /
    • 2020
  • The Off-site Risk Assessment (ORA) for preventing chemical accidents estimates the chemical accident risk at chemical plants. The method of estimating the risk is made by multiplying the number of residents within the effect area of the chemical accident and the frequency of accidents at a chemical plant. At present, the ORA does not quantitatively consider environmental receptors when the damage types within the scope of the accident are environmental receptors. In order to solve this problem, this study proposes a method of estimating the risk considering resident and environmental receptors. Through these studies, it was confirmed that the ORA impact for the prevention of chemical accidents requires risk analysis considering environmental receptors in the medium and long term.

A Research Trend on On-Line/Off-Line PD Insulation Diagnostic System (온라인 및 오프라인 PD 모니터링에 관한 연구 동향)

  • Choo, Jong-Hoon;Hong, Chang-Il;Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.2008-2009
    • /
    • 2007
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is introduced.

  • PDF