동일하지 않는 병렬기계 일정계획을 위한 휴리스틱 방법 (A Hueristic Algorithm for Nonidentical Parallel Machines Scheduling)

  • 전태웅;박해천
    • 산업경영시스템학회지
    • /
    • 제23권59호
    • /
    • pp.37-42
    • /
    • 2000
  • The parallel machines scheduling problems is one of the combinatorial optimization problems that often occurs in the real world. This problem is classified into two cases, one of which is the case which processing time are identical and the other, nonidentical. Not so much researches have been made on the case that nonidentical parallel machines scheduling problem. This study proposes Tabu Search methods for solving parallel machines scheduling problems related to due dates: minimizing mean tardiness, minimizing the number of tardy jobs, minimizing the maximum tardiness.

  • PDF

신속제조환경에서의 새로운 생산입력통제방식에 관한 연구 (A Study of New Production Input Control in an Agile Manufacturing Environment)

  • 김현수
    • 대한산업공학회지
    • /
    • 제23권4호
    • /
    • pp.699-708
    • /
    • 1997
  • Production control is usually composed of due-dote assignment, production input control, and priority dispatching rule. A production input control(PIC) is mainly to control the WIP level on the shop floor. On the other hand, a priority dispatching rule(PDR) is mainly to control the tardiness/earliness of on order and number of tardy jobs. Therefore, if we select a particular PIC which can control only a particular performance measure(i.e., tardiness), it may cause worsening other performance measure(i.e., WIP level, shopfloor time, etc.) This newly developed production input control, DRD(Dual Release-Dates), is mainly designed to control the WIP level on the shop floor by employing two different release-dates of an order(earliest release. date and latest release-date and the release condition (relationship between the current WIP level and the pre-defined maximum WIP level) while trying to meet the due-date of the order.

  • PDF

지연 스케쥴을 허용하는 납기최소화 잡샵 스케쥴링 알고리즘 (Dispatching Rule based Job-Shop Scheduling Algorithm with Delay Schedule for Minimizing Total Tardiness)

  • 김재곤;방준영
    • 산업경영시스템학회지
    • /
    • 제42권1호
    • /
    • pp.33-40
    • /
    • 2019
  • This study focuses on a job-shop scheduling problem with the objective of minimizing total tardiness for the job orders that have different due dates and different process flows. We suggest the dispatching rule based scheduling algorithm to generate fast and efficient schedule. First, we show the delay schedule can be optimal for total tardiness measure in some cases. Based on this observation, we expand search space for selecting the job operation to explore the delay schedules. That means, not only all job operations waiting for process but also job operations not arrived at the machine yet are considered to be scheduled when a machine is available and it is need decision for the next operation to be processed. Assuming each job operation is assigned to the available machine, the expected total tardiness is estimated, and the job operation with the minimum expected total tardiness is selected to be processed in the machine. If this job is being processed in the other machine, then machine should wait until the job arrives at the machine. Simulation experiments are carried out to test the suggested algorithm and compare with the results of other well-known dispatching rules such as EDD, ATC and COVERT, etc. Results show that the proposed algorithm, MET, works better in terms of total tardiness of orders than existing rules without increasing the number of tardy jobs.

글로벌 공급사슬에서 경쟁협력 스케줄링을 위한 에이전트 기반 플랫폼 구축 (Development of Agent-based Platform for Coordinated Scheduling in Global Supply Chain)

  • 이정승;최성우
    • 지능정보연구
    • /
    • 제17권4호
    • /
    • pp.213-226
    • /
    • 2011
  • 글로벌 공급사슬 환경에서 글로벌하게 분산 조달, 생산, 유통하게 됨에 따라 전체 공급사슬의 스케줄을 최적화하기 위해서 공급사슬상의 개별 기업 혹은 공장의 스케줄링 최적화뿐만 아니라 각 개별 기업 혹은 공장의 스케줄을 긴밀하게 연계하는 것이 필요하게 되었다. 이는 경쟁과 협력을 동시에 하는 개별 기업 혹은 공장을 개별 에이전트로 보고 각 에이전트간 커뮤니케이션을 통해 개별 에이전트가 관할하는 스케줄러의 스케줄을 조정함으로써 가능해진다. 하지만 전통적인 스케줄링 연구는 개별 스케줄러의 최적화에 집중되어 있고, 에이전트 연구는 스케줄링 도메인에 적용한 예가 제한적이며 이 예도 개별 스케줄러 내의 최적화에 적용하거나 실제 현장 문제가 아닌 실험실 문제 수준에 그치고 있다. 따라서 본 연구에서는 전체 글로벌 공급사슬 스케줄의 최적화를 위해 개별 기업 혹은 공장 스케줄러의 스케줄링을 연계하는 경쟁협력 스케줄링을 위한 에이전트 기반 플랫폼을 구축하였다. 글로벌 공급사슬에서 경쟁협력 스케줄링을 위한 에이전트 기반 플랫폼을 구축하기 위해 첫째, 경쟁협력 스케줄링 분류 체계를 확립하고, 둘째, 경쟁협력 스케줄링을 위한 에이전트를 설계하고, 셋째, 경쟁협력 스케줄링을 위한 지식기반 의사결정 모델을 개발한 후, 넷째 조선산업에 적용 가능한 프로토타입 시스템을 개발했다. 이를 통해 글로벌 공급사슬상의 전체 스케줄의 품질과 에이전트간 커뮤니케이션의 노력에 대한 균형점을 찾을 수 있다. 이를 통해 공급사슬내 개별 기업 혹은 공장의 부분 최적화를 극복할 수 있는 대안을 제시할 것으로 기대한다.