• Title/Summary/Keyword: new risk

Search Result 2,710, Processing Time 0.033 seconds

Innovation Resistance in Adoption Process of New R&D Grant Management System (연구비 관리제도의 혁신저항)

  • Park, Sang-June;Byun, Ji-Yeon;Cho, Min-Ho;Kim, Dong-Won
    • Korean Management Science Review
    • /
    • v.24 no.2
    • /
    • pp.19-31
    • /
    • 2007
  • Since the concept of "innovation resistance" was introduced as a summary construct for customers not adopting a superior innovation, a lot of researchers have examined to identify the relationship between the innovation resistance and the various innovation and situation variables. This paper addresses the innovation resistance coming from the introduction of a new R&D grant management system(RGMS) in a university. The new RGMS is based on research grant management policies newly accredited by the government, where the central management of the research grants is indispensable. We have surveyed professors and researchers about the introduction of a new RGMS, and empirically analyzed the perceived innovation characteristics and the user characteristics affecting the innovation resistance. The result shows that perceived risk is the most important factor influencing on the innovation resistance.

Drought risk outlook using scenario planning and drought management according to drought risk levels in Korea (시나리오 플래닝을 적용한 한국의 가뭄 위험도 전망 및 가뭄 위험 단계에 따른 가뭄관리 방안)

  • Kim, Ji Eun;Kim, Min Ji;Kim, Seok-Woo;Kim, Tae-Woong
    • Journal of Korea Water Resources Association
    • /
    • v.57 no.1
    • /
    • pp.45-58
    • /
    • 2024
  • Drought risk is expected to increase as the frequency, intensity, and duration of droughts increase due to climate change. Drought risk is related to not only hydro-meteorological factors, but also water supply and demand. Recently, along with climate change, socioeconomic factors have also been recognized to increase drought risk. Therefore, it is necessary to outlook the drought risk considering various conditions for coping with future extreme droughts in a timely manner. In addition, considering various drought scenarios help reduce the uncertainty in future drought outlook. In this study, drought scenarios considering climate change scenarios, population, and water demand were created to outlook drought risk for 160 administrative districts in Korea, then new levels of drought risk were assigned based on the results of drought risk outlook to suggest drought management measures. The results showed that the drought risk will increase in the future in 2020, 2025, and 2030, compared to past. Especially the drought risk is likely twice as high in 2030 under the baseline and high scenarios. Applying the drought outlook results from this study to the new methodology for setting the risk levels shows that most regions are in Response (V) in 2020 and 2030 for baseline and high scenarios.

Risk free zone study for cylindrical objects dropped into the water

  • Xiang, Gong;Birk, Lothar;Li, Linxiong;Yu, Xiaochuan;Luo, Yong
    • Ocean Systems Engineering
    • /
    • v.6 no.4
    • /
    • pp.377-400
    • /
    • 2016
  • Dropped objects are among the top ten causes of fatalities and serious injuries in the oil and gas industry (DORIS, 2016). Objects may accidentally fall down from platforms or vessels during lifting or any other offshore operation. Proper planning of lifting operations requires the knowledge of the risk-free zone on the sea bed to protect underwater structures and equipment. To this end a three-dimensional (3D) theory of dynamic motion of dropped cylindrical object is expanded to also consider ocean currents. The expanded theory is integrated into the authors' Dropped Objects Simulator (DROBS). DROBS is utilized to simulate the trajectories of dropped cylinders falling through uniform currents originating from different directions (incoming angle at $0^{\circ}$, $90^{\circ}$, $180^{\circ}$, and $270^{\circ}$). It is found that trajectories and landing points of dropped cylinders are greatly influenced by the direction of current. The initial conditions after the cylinders have fallen into the water are treated as random variables. It is assumed that the corresponding parameters orientation angle, translational velocity, and rotational velocity follow normal distributions. The paper presents results of DROBS simulations for the case of a dropped cylinder with initial drop angle at $60^{\circ}$ through air-water columns without current. Then the Monte Carlo simulations are used for predicting the landing point distributions of dropped cylinders with varying drop angles under current. The resulting landing point distribution plots may be used to identify risk free zones for offshore lifting operations.

Trading Risk Reduction Effects for Currency Futures Markets (통화선물거래의 거래위험 감소효과에 관한 연구)

  • Choi, Heung Sik;Kim, Sun Woong;Park, Eun-Jin
    • Journal of Information Technology Applications and Management
    • /
    • v.21 no.4
    • /
    • pp.1-13
    • /
    • 2014
  • This study aims to show the risk reduction effects of round-the-clock trading environment. We analyse the trading results of the currency futures contracts in CME Globex which are open 23 hours a day. These include Euro FX, Japanese Yen, Australian Dollar, and British Pound from January 2005 to August 2013. We generate new price series using only daytime prices during about 7-hour period. This hypothetical "G" data series may have greater gap risk than the original "R" data series. Empirical results show the trading risk reduction effects, that is R data series have higher profits and lower risks than G data series.

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.12 no.1
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

An Effective Project risk Management Based on Systems Engineering (시스템엔지니어링에 기반한 효과적인 리스크 관리)

  • Kang, Top;Kim, Sung-Cheol;Oh, Jung-Taek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.1
    • /
    • pp.43-51
    • /
    • 2011
  • SE generally defines approaching ways of conducting identification, verification and integration of an optimized product and process solution to meet customer's needs by leveraging organizational competency in engineering and management. To successfully develop a new product under mass production contract, it is important to efficiently carry out the program by ensuring that three major competencies are secured; core technology, system integration, and program management. For successful implementation of tasks in the three areas, systematic execution is called for, which requires identifying risk factors in advance. In particular, comprehensive risk management role and responsibility is required for program management. Success of a development program is determined by complex elements of human resources, organization culture, and overall competency of an organization in technology and program management, including capability of the program manager. In this paper, a risk management solution is suggested to lead a program to success with a more efficient way through actual risk management by the concept of SE around the above three areas.

A Study on the Key Performance Factors of Passenger Airbag and Injury Risk Prediction Technique Development (동승석 에어백 핵심 성능 인자 및 상해위험도 예측 기법 개발에 대한 연구)

  • Park, Dongkyou
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.21 no.5
    • /
    • pp.130-135
    • /
    • 2013
  • Until now, passenger airbag design is based on the referred car design and many repetitive crash tests have been done to meet the crash performance. In this paper, it was suggested a new design process of passenger airbag. First, key performance factors were determined by analyzing the injury risk effectiveness of each performance factor. And it was made a relationship between injury risk and performance factor by using the response surface model. By using this one, it can be predicted the injury risk of head and neck. Predicted injury risk of optimal design was obtained through this injury risk prediction model and it was verified by FE analysis result within 18% error of head and 9% error of neck. It was shown that a target crash performance can be met by controlling the key performance factors only.

Research on the Actual Condition of Risk of Remodeling Project (리모델링사업 리스크 실태조사 연구)

  • Lee, Teck-Wn
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.6 no.3
    • /
    • pp.215-222
    • /
    • 2003
  • When constructing buildings, planning, design, construction, using & maintenance as building life cycle. Due to industrialization in 1960s and development of new town from the late 1980s to the early 1990s, Korean housing supply rate reaches almost 100%. After construction companies confronted limit of new building construction, they recognized remodeling as a part of construction, and organized remodeling team or FM team to improve sustainable industrial area. However, since companies in Korea are lack of experience and research activities for remodeling, it makes obstacle to improvement of remodeling business. So the objective of this study is to help carry out remodeling business by suggesting the counterplan through investigation of a risk of apartment remodeling business.

  • PDF

Analysis of Damage Range and Impact of On-Site Hydrogen Fueling Station Using Quantitative Risk Assessment Program (Hy-KoRAM) (정량적 위험성평가 프로그램(Hy-KoRAM)을 이용한 제조식 수소충전소 피해범위 및 영향 분석)

  • KIM, HYELIM;KANG, SEUNGKYU
    • Journal of Hydrogen and New Energy
    • /
    • v.31 no.5
    • /
    • pp.459-466
    • /
    • 2020
  • As the hydrogen industry grows, expansion of infrastructure for hydrogen supply is required, but the safety of hydrogen facilities is concerned due to the recent accidents at the Gangneung hydrogen tank and the Norwegian hydrogen fueling station. In this study, the damage range and impact analysis on the on-site hydrogen fueling station was conducted using Hy-KoRAM. This is a domestically developed program that adds functions based on HyRAM. Through this risk assessment, it was evaluated whether the on-site hydrogen fueling station meets international standards and suggested ways to improve safety.

A New Ship Scheduling Set Packing Model Considering Limited Risk

  • Kim, Si-Hwa;Hwang, Hee-Su
    • Journal of Navigation and Port Research
    • /
    • v.30 no.7
    • /
    • pp.561-566
    • /
    • 2006
  • In this paper, we propose a new ship scheduling set packing model considering limited risk or variance. The set packing model is used in many applications, such as vehicle routing, crew scheduling, ship scheduling, cutting stock and so on. As long as the ship scheduling is concerned, there exits many unknown external factors such as machine breakdown, climate change and transportation cost fluctuation. However, existing ship scheduling models have not considered those factors apparently. We use a quadratic set packing model to limit the variance of expected cost of ship scheduling problems under stochastic spot rates. Set problems are NP-complete, and additional quadratic constraint makes the problems much harder. We implement Kelley's cutting plane method to replace the hard quadratic constraint by many linear constrains and use branch-and-bound algorithm to get the optimal integral solution. Some meaningful computational results and comments are provided.