• Title/Summary/Keyword: national investment cost

Search Result 339, Processing Time 0.027 seconds

A Study on the Government's Investment Priorities for Building a Supercomputer Joint Utilization System

  • Hyungwook Shim;Jaegyoon Hahm
    • Asian Journal of Innovation and Policy
    • /
    • v.12 no.2
    • /
    • pp.200-215
    • /
    • 2023
  • The purpose of this paper is to analyze the Korean government's investment priorities for the establishment of a supercomputer joint utilization system using AHP. The AHP model was designed as a two-layered structure consisting of two areas of specialized infrastructure, a one-stop joint utilization system service, and four evaluation items for detailed tasks. For the weight of each evaluation item, a cost efficiency index considering the annual budget was developed for the first time and applied to the weight calculation process. AHP analysis conducted a survey targeting supercomputer experts and derived priorities with 22 data that had completed reliability verification. As a result of the analysis, the government's investment priority was high in the order of dividing infrastructure for each Specialized Center and building resources in stages. In the future, the analysis results will be used to select economic promotion plans and prepare strategies for the establishment of the government's supercomputer joint utilization system.

Analysis of the cost effectiveness according to T-P standard enforcement of public sewage treatment facilities (공공하수처리시설의 총인기준 강화에 따른 비용효과분석)

  • Jeong, Won-Gu;Rim, Jay-Myung
    • Journal of Industrial Technology
    • /
    • v.31 no.A
    • /
    • pp.135-145
    • /
    • 2011
  • This study was conducted to analyze the cost effectiveness in line with total phosphorus standard enforcement of public sewage treatment facilities. The additional cost for the total phosphorus removal process was calculated to analyze the cost effectiveness of the advanced water purification process. The analysis results showed that the T-P removal by coagulation sedimentation was more efficient than the advanced water purification facilities in terms of facilities investment cost, and if the coagulation filteration was used for T-P removal, the activated carbon process among the advanced water purification techniques was more efficient in terms of facilities investment cost. In this study, the effects of the T-P removal process that will be additionally introduced according to the tightening of the effluent T-P standard were analyzed within a limit. The actual benefits of improved T-P concentration in the water source will provide diverse values, including the leisure water, environment improvement water, eco-system in the water source and industrial water, in addition to the advanced water purification.

  • PDF

A Study on the Methodology of Determining Proper SOC Operation Range Considering the Economic Characteristics and the Charge and Discharge Voltage Characteristics of BESS (BESS의 경제성과 충방전 전압 특성을 고려한 적정 SOC 운영 영역 설정 기법에 관한 연구)

  • Yoon, Dae-Sik;Choo, Dae-Hyeok;Ki, Byung-Kook;Kim, Joohn-Sheok;Lee, Byung Ha;Chae, Woo-Ku
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.4
    • /
    • pp.529-536
    • /
    • 2015
  • With the growing interest of microgrid all over the world, many studies on microgrid operation are being carried out. The battery energy storage system(BESS) is a key equipment for effective operation of the microgrid. In this paper, we analyze the characteristics of the charge and discharge output voltage of the battery and the characteristics of the life-span variation and the investment cost when the state-of-charge (SOC) changes. The formulas to represent the quality of the charge and discharge output voltage of the battery and the economics due to the life-span variation and the investment cost according to DOD(Depth of Discharge) are derived. The methodology of determining the proper operation ranges of the battery SOC with varying the weighting of the quality of its charge and discharge output voltage of the battery and the economics due to its life-span variation and the investment cost is presented using these formulas.

Study on the algorithm for the Reasonable Switch Automation Rate with Customer Interruption Cost and Reliability Evaluation (정전비용과 신뢰도 분석을 통한 분할 개폐기의 적정 자동화율 도출 알고리즘에 관한 연구)

  • Chai, Hui-Seok;Shin, Hee-Sang;Cho, Sung-Min;Moon, Jong-Fil;Kim, Jae-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.4
    • /
    • pp.467-473
    • /
    • 2013
  • The addition of disconnect switches to a distribution feeder or the replacement of the manual switches with the automatic switches do, in general, increase reliability by decreasing the duration of the outage of many to the customers on the feeder and reducing the outage section. However, the improvement of reliability in power distribution system causes an increase of the investment cost, for example, replacement costs, labor costs, and so on. For this reason - the balance between investment and reliability improvement - many studies about the appropriate level of investment have been conducted. In this paper, we suggest the algorithm for determining the reasonable switch automation rate in the power distribution system. We evaluate the customer interruption cost and reliability for several cases - these cases relate with the switch automation rate - in the domestic metropolitan power distribution system, estimate the effectiveness of changing the manual switch to automatic switch quantitatively. These results can help the determining on the disconnect switch's automation rate.

Optimal Transmission Expansion Planning Considering the Uncertainties of the Power Market

  • Bae, In-Su;Son, Min-Kyun;Kim, Jin-O
    • Journal of Electrical Engineering and Technology
    • /
    • v.5 no.2
    • /
    • pp.239-245
    • /
    • 2010
  • Today, as power trades between generators and loads are liberalized, the uncertainty level of power systems is rapidly increasing. Therefore, transmission operators are required to incorporate these uncertainties when establishing an investment plan for effective operation of transmission facilities. This paper proposes the methodology for an optimal solution of transmission expansion plans for the long-term in a deregulated power system. The proposed model uses the probabilistic cost of transmission congestion for various scenarios and the annual increasing rates of loads. The locations and the installation times of expanded transmissions lines with minimum cost are acquired by the model. To minimize the investment risk, the Mean-Variance Markowitz portfolio theory is applied to the model. In a case study, the optimal solution of a transmission expansion plan is obtained considering the uncertain power market.

A Study on the Amendment of Act to activate the Establishment of Public Kindergarten - Focusing on Urban and Architectural Planning Act - (국·공립 유치원 설립 활성화를 위한 관련 법령 개정방안 연구 - 학교용지법 등 건축 및 도시계획 법령을 중심으로 -)

  • Cho, Chang-Hee;Dong, Jae-Uk;Lee, Hwa-Ryong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.26 no.2
    • /
    • pp.11-18
    • /
    • 2019
  • There is a growing demand for public kindergartens due to the problem of private kindergartens. However, when the kindergarten is built in the residential land development area, the cost of purchasing the land increases, and the overall project cost is increasing. This situation puts a lot of burden on educational finances. Therefore, to reduce the cost of establishing a kindergarten, it is required to revise related laws including act on the special cases concerning the procurement, etc. of school sites. The purpose of this study is to propose the revised laws to expand public kindergartens. In this study, the present situation of infants and kindergartens was analyzed through policy data and statistics. And the analysis of the investment evaluation data also analyzed the problems in establishing kindergarten. In addition, we conducted surveys and FGI analyzes on school sites and kindergarten related laws and regulations. Finally, this study aims to find a way to amend related acts of urban and architectural Planning for Invigoration of Public kindergarten establishment by analysis data.

Economic Impact Analysis of Disaster Mitigation Projects in Hazardous Areas (자연재해위험지구 정비사업의 투자효과분석)

  • Heo, Bo-Young;Yu, Soonyoung;Kim, Sung-Wook
    • Economic and Environmental Geology
    • /
    • v.46 no.3
    • /
    • pp.247-256
    • /
    • 2013
  • In order to improve the quality assurance of the disaster mitigation projects, the economic effect of these projects in the hazardous areas was analysed. Eight project sites were selected for analyses based on the disaster data during the previous 10 years, and the investment effect was evaluated using a benefit cost ratio (B/C). The benefit was estimated using the historical disaster data and presumed to continue for 30 years, while the cost was assumed with the total project cost. Analysis results indicate the B/C ratio is larger than 1 in the difference range, depending on factors such as impact areas and discount rates. According to the analysis results, the average B/C of the eight projects is 4.1 with assuming the discount rate of 4% and the impact diameter of 5 km, which implies that a disaster management project in hazardous areas will give the positive investment effects.

Insulation Level Assessment on the Military Residential Facilities Considering the Investment Payback Period (투자회수기간을 고려한 군 주거시설의 단열수준 산정 연구)

  • Park, Young Jun;Meang, Joon Ho;Kim, Taehui;Kim, Sung Joong;Lee, Seung-Min;Son, Kiyoung
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.57-62
    • /
    • 2015
  • Purpose: This study, which is based on the investment payback periods, aims to suggest the proper insulation level which can be adapted to the Defense Military Facility Criteria regarding the military residential condominiums. For the energy performance simulation, it is required to collect the residential data regarding the military condominiums and climatic data concerning the regions they belongs to. The estimates through energy performance simulation are the regional heating loads and the heating transmission coefficients of building components. Method: With the heating loads, the annual heating cost saving per square meters is assessed. With the heating transmission coefficients of building components, the additional insulation installment cost per square meters is evaluated. With two outcomes, one as an annual value and the other as a present value, the investment payback period is calculated. Result: In result, it could be concluded that 55~70% insulation ratio can lead a superior residental environments as well as be contributed to the national policy associated with zero-energy buildings because the estimated investment payback period is shorter than the life span of the military residental condominiums. This upshot can be used as a foundation to enactment the Defense Military Facility Criteria associated with military residential condominiums.

A Study on Safety Cos Estimation Using Process Risk Assessment for Polyol Process (polyol공정에 대한 위험성 평가에 의한 안저비용 산정에 관한 연구)

  • Lee, Jun-Suk;Lee, Young-Soon;Park, Young-Ku
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.1
    • /
    • pp.68-71
    • /
    • 2002
  • A research on accident loss calculation for polyol process without safety management activities, and safety cost estimation using process risk assessment has been implemented. In order to estimate a magnitude of loss, accident scenarios were made by combining result made from HAZOP Study method with accident possibility analysis results implemented with FTA. Also effect assessment was implement for accident consequence of each scenario. And minimum possible loss cost has been calculated when safety investment do or not. Result from cost-benefit analysis was shown as approximately \335 billion(=USS44,000 billion), as cost after subtracting safety management cost from minimum possible loss cost.

Evaluation of Congestion Cost and Loss Cost using DC Load Flow (직류조류계산을 이용한 혼잡비용과 손실비용 평가)

  • Bae, In-Su;Song, Woo-Chang
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.12
    • /
    • pp.93-98
    • /
    • 2012
  • Economics of available alternatives in the transmission planning are evaluated by the investment cost, loss cost and congestion cost. Congestion/loss cost is calculated in many years and many load levels by unit commitment of generators, optimal dispatch, load flow, judgement about transmission congestion and re-dispatch to reduce the congestion. The greatest difficulties to introduce variable optimization techniques on the transmission planning is the convergence of load flow. In this paper, economics in the transmission planning are evaluated using DC load flow, and case study is conducted on the Korea power system by proposed congestion/loss calculation methods.