• Title/Summary/Keyword: multi-axle

Search Result 46, Processing Time 0.018 seconds

Sliding Mode Observer-based Fault Detection Algorithm for Steering Input of an All-Terrain Crane (슬라이딩 모드 관측기 기반 전지형 크레인의 조향입력 고장검출 알고리즘)

  • Oh, Kwangseok;Seo, Jaho
    • Journal of Drive and Control
    • /
    • v.14 no.2
    • /
    • pp.30-36
    • /
    • 2017
  • This paper presents a sliding mode observer-based fault detection algorithm for steering inputs of an all-terrain crane. All-terrain cranes with multi-axles have several steering modes for various working purposes. Since steering angles at the other axles except the first wheel are controlled by using the information of steering angle at the first wheel, a reliable signal of the first axle's steering angle should be secured for the driving safety of cranes. For the fault detection of steering input signal, a simplified crane model-based sliding mode observer has been used. Using a sliding mode observer with an equivalent output injection signal that represents an actual fault signal, a fault signal in steering input was reconstructed. The road steering mode of the crane's steering system was used to conduct performance evaluations of a proposed algorithm, and an arbitrary fault signal was applied to the steering angle at the first wheel. Since the road steering mode has different steering strategies according to different speed intervals, performance evaluations were conducted based on the curved path scenario with various speed conditions. The design of algorithms and performance evaluations were conducted on Matlab/Simulink environment, and evaluation results reveal that the proposed algorithm is capable of detecting and reconstructing a fault signal reasonably well.

Improvement of Hill Climbing Ability for 6WD/6WS Vehicle using Optimum Tire Force Distribution Method (최적 타이어 힘 분배를 이용한 6WD/6WS 차량의 등판 주행 성능 향상)

  • Kim, Sang-Ho;Kim, Chang-Jun;Han, Chang-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.4
    • /
    • pp.1523-1531
    • /
    • 2011
  • Multi-axle driving vehicle are favored for military use in off road operations because of their high mobility on extreme terrains and obstacles. Especially, Military Vehicle needs an ability to driving on hills of 60% angle slope. This paper presents the improvement of the ability of hill climbing for 6WD/6WS vehicle through the optimal tire force distribution method. From the driver's commands, the desired longitudinal force, the desired lateral force, and the desired yaw moment were obtained for the hill climbing of vehicle using optimal tire force distribution method. These three values were distributed to each wheel as the torque based on optimal tire force distribution method using friction circle and cost function. To verify the performance of the proposed algorithm, the simulation is executed using TruckSim software. Two vehicles, the one the proposed algorithm is implemented and the another the tire's forces are equivalently distributed, are compared. At the hill slop, the ability to driving on hills is improved by using the optimum tire force distribution method.

Traffic control technologies without interruption for component replacement of long-span bridges using microsimulation and site-specific data

  • Zhou, Junyong;Shi, Xuefei;Zhang, Liwen;Sun, Zuo
    • Structural Engineering and Mechanics
    • /
    • v.70 no.2
    • /
    • pp.169-178
    • /
    • 2019
  • The replacement of damaged components is an important task for long-span bridges. Conventional strategy for component replacement is to close the bridge to traffic, so that the influence of the surrounding environment is reduced to a minimum extent. However, complete traffic interruption would bring substantial economic losses and negative social influence nowadays. This paper investigates traffic control technologies without interruption for component replacement of long-span bridges. A numerical procedure of traffic control technologies is proposed incorporating traffic microsimulation and site-specific data, which is then implemented through a case study of cable replacement of a long-span cable-stayed bridge. Results indicate traffic load effects on the bridge are lower than the design values under current low daily traffic volume, and therefore cable replacement could be conducted without traffic control. However, considering a possible medium or high level of daily traffic volume, traffic load effects of girder bending moment and cable force nearest to the replaced cable become larger than the design level. This indicates a potential risk of failure, and traffic control should be implemented. Parametric studies show that speed control does not decrease but increase the load effects, and flow control using lane closure is not effectual. However, weight control and gap control are very effective to mitigate traffic load effects, and it is recommended to employ a weight control with gross vehicle weight no more than 65 t or/and a gap control with minimum vehicle gap no less than 40 m for the cable replacement of the case bridge.

Development of exothermic system based on internet of things for preventing damages in winter season and evaluation of applicability to railway vehicles

  • Kim, Heonyoung;Kang, Donghoon;Joo, Chulmin
    • Smart Structures and Systems
    • /
    • v.29 no.5
    • /
    • pp.653-660
    • /
    • 2022
  • Gravel scattering that is generated during operation of high-speed railway vehicle is cause to damage of vehicle such as windows, axle protector and so on. Especially, those are frequently occurred in winter season when snow ice is generated easily. Above all, damage of vehicle windows has not only caused maintenance cost but also increased psychological anxiety of passengers. Various methods such as heating system using copper wire, heating jacket and heating air are applied to remove snow ice generated on the under-body of vehicle. However, the methods require much run-time and man power which can be low effectiveness of work. Therefore, this paper shows that large-area heating system was developed based on heating coat in order to fundamentally prevent snow ice damage on high-speed railway vehicle in the winter season. This system gives users high convenience because that can remotely control the heating system using IoT-based wireless communication. For evaluating the applicability to railroad sites, a field test on an actual high-speed railroad operation was conducted by applying these techniques to the brake cylinder of a high-speed railroad vehicle. From the results, it evaluated how input voltage and electric power per unit area of the heating specimen influences exothermic performance to draw the permit power condition for icing. In the future, if the system developed in the study is applied at the railroad site, it may be used as a technique for preventing all types of damages occurring due to snow ice in winter.

Evaluation of Impact Factor in Composite Cable-Stayed Bridges under Reliability-based Live Load Model (신뢰도 기반 활하중모델에 의한 강합성 사장교의 충격계수 평가)

  • Park, Jae Bong;Park, Yong Myung;Kim, Dong Hyun;Lee, Jong Han
    • Journal of Korean Society of Steel Construction
    • /
    • v.25 no.4
    • /
    • pp.335-346
    • /
    • 2013
  • AASHTO LRFD and Korean Bridge Design Code (Limit State Design) specify to consider Truck and Lane load simultaneously determined from reliability-based live load model, and impact shall be applied to the truck load while it shall not be applied to the lane load. In this paper, vehicle-bridge interaction analysis under moving truck and lane loads were performed to estimate impact factor of the cables and girders for the selected multi-cable-stayed composite bridges with 230m, 400m and 540m main span. A 6-d.o.f. vehicle was used for truck load and a series of single-axle vehicles was applied to simulate equivalent lane load. The effect of damping ratio on the impact factor was estimated and then the essential parameters to impact factor, i.e., road surface roughness and vehicle speed were considered. The road surface roughness was randomly generated based on ISO 8608 and it was applied to the truck load only in the vehicle-bridge interaction analysis. The impact factors evaluated from dynamic interaction analysis were also compared with those by the influence line method that is currently used in design practice to estimate impact factor in cable-stayed bridge.

Road Maintenance Planning with Traffic Demand Forecasting (장래교통수요예측을 고려한 도로 유지관리 방안)

  • Kim, Jeongmin;Choi, Seunghyun;Do, Myungsik;Han, Daeseok
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.47-57
    • /
    • 2016
  • PURPOSES : This study aims to examine the differences between the existing traffic demand forecasting method and the traffic demand forecasting method considering future regional development plans and new road construction and expansion plans using a four-step traffic demand forecast for a more objective and sophisticated national highway maintenance. This study ultimately aims to present future pavement deterioration and budget forecasting planning based on the examination. METHODS : This study used the latest data offered by the Korea Transport Data Base (KTDB) as the basic data for demand forecast. The analysis scope was set using the Daejeon Metropolitan City's O/D and network data. This study used a traffic demand program called TransCad, and performed a traffic assignment by vehicle type through the application of a user equilibrium-based multi-class assignment technique. This study forecasted future traffic demand by verifying whether or not a realistic traffic pattern was expressed similarly by undertaking a calibration process. This study performed a life cycle cost analysis based on traffic using the forecasted future demand or existing past pattern, or by assuming the constant traffic demand. The maintenance criteria were decided according to equivalent single axle loads (ESAL). The maintenance period in the concerned section was calculated in this study. This study also computed the maintenance costs using a construction method by applying the maintenance criteria considering the ESAL. The road user costs were calculated by using the user cost calculation logic applied to the Korean Pavement Management System, which is the existing study outcome. RESULTS : This study ascertained that the increase and decrease of traffic occurred in the concerned section according to the future development plans. Furthermore, there were differences from demand forecasting that did not consider the development plans. Realistic and accurate demand forecasting supported an optimized decision making that efficiently assigns maintenance costs, and can be used as very important basic information for maintenance decision making. CONCLUSIONS : Therefore, decision making for a more efficient and sophisticated road management than the method assuming future traffic can be expected to be the same as the existing pattern or steady traffic demand. The reflection of a reliable forecasting of the future traffic demand to life cycle cost analysis (LCCA) can be a very vital factor because many studies are generally performed without considering the future traffic demand or with an analysis through setting a scenario upon LCCA within a pavement management system.