• Title/Summary/Keyword: monitoring interval

Search Result 366, Processing Time 0.027 seconds

Earthquake Damage Monitoring for Underground Structures Based Damage Detection Techniques

  • Kim, Jin Ho;Kim, Na Eun
    • International Journal of Railway
    • /
    • v.7 no.4
    • /
    • pp.94-99
    • /
    • 2014
  • Urban railway systems are located under populated areas and are mostly constructed for underground structures which demand high standards of structural safety. However, the damage progression of underground structures is hard to evaluate and damaged underground structures may not effectively stand against successive earthquakes. This study attempts to examine initial damage-stage and to access structural damage condition of the ground structures using Earthquake Damage Monitoring (EDM) system. For actual underground structure, vulnerable damaged member of Ulchiro-3ga station is chosen by finite element analysis using applied artificial earthquake load, and then damage pattern and history of damaged members is obtained from measured acceleration data introduced unsupervised learning recognition. The result showed damage index obtained by damage scenario establishment using acceleration response of selected vulnerable members is useful. Initial damage state is detected for selected vulnerable member according to established damage scenario. Stiffness degrading ratio is increasing whereas the value of reliability interval is decreasing.

A Development of EMAS (Easy Maintenance Assistance Solution) for Industrial Gas Turbine (산업용 가스터빈을 위한 정비지원 시스템 개발에 관한 연구)

  • Kang, Myoungcheol;Ki, Jayoung
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.21 no.3
    • /
    • pp.91-100
    • /
    • 2017
  • The solution was developed for the maintenance decision support of combined cycle power plant gas turbine. The developed solution was applied to MHI501G gas turbine and is, in present, on the process of field test at GUNSAN combined cycle power plant, South Korea. The developed solution provides the calculated result of optimal overhaul maintenance period through following modules: Real Time Performance Monitoring, Model-Based Diagnostics, Performance Trend Analysis, Optimal Overhaul Maintenance Interval, Compressor Washing Period Management, and Blade Path Temperature Analysis. Model-Based Diagnostics module analyzed the differences between the data of gas turbine performance model and the online measurement. Compressor washing management module suggests the optimal point of balancing between the compressor performance and the maintenance cost.

Multivariate SPC Charts for On-line Monitoring the Batch Processes (배치 공정의 온라인 모니터링을 위한 다변량 관리도)

  • Lee Bae Jin;Kang Chang Wook
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.387-396
    • /
    • 2002
  • Batch processes are a significant class of processes in the process industry and play an important role in the production of high quality speciality materials. Examples include the production of semiconductors, chemicals, pharmaceuticals, and biochemicals. With on-line sensors connected to most batch processes, massive amounts of data are being collected routinely during the batch on easily measured process variables such as temperatures, pressures, and flowrates. In this paper, multivariate SPC charts for on-line monitoring of the progress of new batches are developed which utilize the information in the on-line measurements in real-time. We propose the formation of statistical model which describes the normal operation of a batch at each time interval during the batch operation. An on-line monitoring scheme based on the proposed method can handle both cross-correlation among process variables at any one time and auto-correlation over time. And the control limits for the monitoring charts are established from sound statistical framework unlike previous researches which use the external reference distribution. The proposed charts perform real-time, on-line monitoring to ensure that the batch is progressing in a manner that will lead to a high-quality product or to detect and indicate faults that can be corrected prior to completion of the batch. This approach is capable of tracking the progress of new batch runs, identifying the time periods in which the fault occurred and detecting underlying cause.

  • PDF

Basic Study for Stress Analysis Using an Unconstrained BCG Monitoring System (무구속 심탄도 모니터링 시스템을 이용한 스트레스 분석 기초연구)

  • Noh, Yun-Hong;Jeong, Do-Un
    • Journal of Sensor Science and Technology
    • /
    • v.20 no.2
    • /
    • pp.118-123
    • /
    • 2011
  • Heart related diseases mainly caused by heavy work load and increasing stress in human daily life. Therefore, researches on mobile healthcare monitoring for daily life has been carried out. Notably, wearable healthcare monitoring system which has least restriction has been tried to provide an emergency alert of abnormal heart rate. In this study, we developed chair type unconstrained BCG measurement system which able to perform continuous heart status monitoring at the office and daily life in the unconstrained way. Furthermore, adaptive threshold is used to detect the heart rate from BCG signals. The HRV(heart rate variability) is calculated from heart rate interval. ECG signal measured using conventional method and BCG signal measured using unconstraint system are carried out simultaneously for the purpose of performance evaluation. From the comparison result, BCG signal shows a similar heart beat characteristic as ECG signal. This proves the possibility of practical implementation of unconstraint healthcare monitoring system. In addition, medical examination like valsalva maneuver is performed to observe the changes in HRV due to stress. By performing valsalva maneuver, heart is said to be placed under an artificial physical stress condition. Under this artificial physical stress condition, the time and frequency domain of HRV parameters are evaluated.

Driving behavior Analysis to Verify the Criteria of a Driver Monitoring System in a Conditional Autonomous Vehicle - Part I - (부분 자율주행자동차의 운전자 모니터링 시스템 안전기준 검증을 위한 운전 행동 분석 -1부-)

  • Son, Joonwoo;Park, Myoungouk
    • Journal of Auto-vehicle Safety Association
    • /
    • v.13 no.1
    • /
    • pp.38-44
    • /
    • 2021
  • This study aimed to verify the criteria of the driver monitoring systems proposed by UNECE ACSF informal working group and the ministry of land, infrastructure, and transport of South Korea using driving behavior data. In order to verify the criteria, we investigated the safety regulations of driver monitoring systems in a conditional autonomous vehicle and found that the driver monitoring measures were related to eye blinks times, head movements, and eye closed duration. Thus, we took two different experimental data including real-world driving and simulator-based drowsy driving behaviors in previous studies. The real-world driving data were used for analyzing blink times and head movement intervals, and the drowsiness data were used for eye closed duration. In the real-world driving study, 52 drivers drove approximately 11.0 km of rural road (about 20 min), 7.9 km of urban road (about 25 min), and 20.8 km of highway (about 20 min). The results suggested that the appropriate number of blinks during the last 60 seconds was 4 times, and the head movement interval was 35 seconds. The results from drowsy driving data will be presented in another paper - part 2.

Assessment on the Monitoring System for KURT using Optical Fiber Sensor Cable (광섬유센서케이블을 이용한 지하처분연구시설의 감시시스템 운영 평가)

  • Kim, Kyung-Su;Bae, Dae-Seok;Koh, Yong-Kwon;Kim, Jung-Yul
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.8 no.4
    • /
    • pp.293-301
    • /
    • 2010
  • Optical fiber cable, as a sensor, was installed on the wall of KAERI(Korea Atomic Energy Research Institute) Underground Research Tunnel(KURT) in order to monitor the physical stability of the tunnel, which was constructed for technical development and demonstration of radioactive waste disposal. This monitoring system has two simultaneous measurements of temperature and strain over time using Brillouin backscatter. According to the results of the monitoring from Jan. 2008 to Nov. 2009, there is no significant displacement or movement at the tunnel wall However, the cumulative volume of total strain increased slightly as time passes with the comparison of the reference observation, which was measured in Jan. 2008. The change in cumulative volume of total strain indicates that the strain level had been affected by saturation and de-saturation phenomena due to groundwater fluctuation at several points at KURT. This system is based on the distributed sensing technique concept, not point sensing. By using this system, a displacement can be detected with the range from $20{\mu}{\varepsilon}$ to $28,000{\mu}{\varepsilon}$ every 1m interval in minimum. A temperature variation can be monitored at every 0.5m interval with the resolution of 0.01 in minimum. Based on the study, this monitoring system is potentially applicable to long term monitoring systems for radioactive waste disposal project as well as other structures and underground openings.

Development of Long Term Flow Duration Curves in 4 River Basins for the Management of Total Maximum Daily Loads (수질오염총량관리를 위한 4대강수계 장기유황곡선 작성방안)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.3
    • /
    • pp.343-353
    • /
    • 2013
  • Flow duration curve (FDC) can be developed by linking the daily flow data of stream flow monitoring network to 8-day interval flow data of the unit watersheds for the management of Total Maximum Daily Loads. This study investigated the applicable method for the development of long term FDC with the selection of the stream flow reference sites, and suggested the development of the FDC in 4 river basins. Out of 142 unit watersheds in 4 river basins, 107 unit watersheds were shown to estimate daily flow data for the unit watersheds from 2006 to 2010. Short term FDC could be developed in 64 unit watersheds (45%) and long term FDC in 43 unit watersheds (30%), while other 35 unit watersheds (25%) were revealed to have difficulties in the development of FDC itself. Limits in the development of the long term FDC includes no stream monitoring sites in certain unit watersheds, short duration of stream flow data set and missing data by abnormal water level measurements on the stream flow monitoring sites. To improve these limits, it is necessary to install new monitoring sites in the required areas, to keep up continuous monitoring and make normal water level observations on the stream flow monitoring sites, and to build up a special management system to enhance data reliability. The development of long term FDC for the unit watersheds can be established appropriately with the normal and durable measurement on the selected reference sites in the stream flow monitoring network.

Proactive Consultation by a Clinical Pathologist Prevents Diagnostic Delay in Hematological Malignancies

  • Chang, Chih-Chun;Su, Ming-Jang;Ho, Jung-Li;Sun, Jen-Tang;Tsai, Huang-Wen;Tang, Hui-Fei;Chu, Fang-Yeh
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.3
    • /
    • pp.1019-1022
    • /
    • 2016
  • Background: Diagnostic difficulties in hematological malignancies may lead to unacceptably prolonged help-seeking to diagnostic interval as well as increased complications and poor outcomes. Proactive consultation by a clinical pathologist (PCCP) may help clinical diagnosis and therapeutic strategy. Hence, the aim of this investigation was to evaluate the effect of PCCP on the help-seeking to diagnostic interval in hematological cancer cases. Materials and Methods: From January to November, 2015, abnormal results of hematological laboratory testing with added laboratory comment were selectively screened out, and patients with such abnormalities in hematological laboratory testing and accompanied laboratory comment with PCCP were enrolled. Results: A total of 125 aberrant results of hematological laboratory testing were given with accompanied laboratory comments with PCCP and 40.8% (n=51) of these patient-oriented comments had an effect on clinical diagnosis and therapeutic strategy. Twelve of the subjects belonged to newly diagnosed hematological malignancies with the assistance of PCCP, and the help-seeking to diagnostic interval was also shortened from 42 days to 26 days in chronic lymphoid leukemia (CLL), from 83 days to 11 days in multiple myeloma (MM), and from 128 days to 15 days in myelodysplastic syndrome/myeloproliferative neoplasm (MDS/MPN). During the monitoring interval, neither complication events nor deaths were reported in the study group. Conclusions: It was seemingly that PCCP prevented diagnostic delay in hematological malignancies via shortening the help-seeking to diagnostic interval, particularly in CLL, MM and MDS/MPN cases. PCCP can be considered to play an essential role in prompt establishment of diagnosis in hematological malignancies for those who newly present.

Obtaining Reference Intervals of HbA1c by Immunoturbidimetry (면역비탁법에 의한 HbA1c의 참고범위 설정)

  • Kim, Jae-Sub;Park, Ki-Hyun;Yu, Sun-Woo;Lee, Bum-Hee
    • Korean Journal of Clinical Laboratory Science
    • /
    • v.41 no.2
    • /
    • pp.62-66
    • /
    • 2009
  • HbA1c is the major fraction of glycated hemoglobin, and used primarily to identify the average plasma glucose concentration over prolonged periods of time, mostly 2-3 months. It is used as markers for the diagnosis and monitoring of diabetic patients and increasingly used a marker in health screening check up for general populations. In this study, HbA1c was measured with Cobas integra 800 (Roche Diagnostics, Mannheim, Germany), using immunoturbidimetry principles. We established the reference interval for HbA1c with Cobas integra 800 and evaluated its significance. The study subjects were 36,140 (male 57.5%, and female 42.2%) who visited the Health Promotion Center of a tertiary care center in Seoul for health checkup from January to September, 2008. HbA1c levels were measured with immunoturbidimetric method. Statistical evaluation was done with SPSS. Comparison between male and female was checked with Mann-Whitney test, and among age groups with Kruskal-Wallis test. Reference interval for HbA1c was from 4.8% to 6.1%. There was no significant difference between male and female with Mann-Whitney test (P=0.539). There was significant difference among age groups with Kruskal-Wallis test (P<0.05). Reference interval for HbA1c with Cobas integra 800 was 4.8~6.1%, which was different from conventional one, 4.4-6.4%. Establishment of reference interval for each principle is needed.

  • PDF

A Bayesian approach for vibration-based long-term bridge monitoring to consider environmental and operational changes

  • Kim, Chul-Woo;Morita, Tomoaki;Oshima, Yoshinobu;Sugiura, Kunitomo
    • Smart Structures and Systems
    • /
    • v.15 no.2
    • /
    • pp.395-408
    • /
    • 2015
  • This study aims to propose a Bayesian approach to consider changes in temperature and vehicle weight as environmental and operational factors for vibration-based long-term bridge health monitoring. The Bayesian approach consists of three steps: step 1 is to identify damage-sensitive features from coefficients of the auto-regressive model utilizing bridge accelerations; step 2 is to perform a regression analysis of the damage-sensitive features to consider environmental and operational changes by means of the Bayesian regression; and step 3 is to make a decision on the bridge health condition based on residuals, differences between the observed and predicted damage-sensitive features, utilizing 95% confidence interval and the Bayesian hypothesis testing. Feasibility of the proposed approach is examined utilizing monitoring data on an in-service bridge recorded over a one-year period. Observations through the study demonstrated that the Bayesian regression considering environmental and operational changes led to more accurate results than that without considering environmental and operational changes. The Bayesian hypothesis testing utilizing data from the healthy bridge, the damage probability of the bridge was judged as no damage.