• Title/Summary/Keyword: module severity

Search Result 22, Processing Time 0.017 seconds

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

A Construction safety management system based on Building Information Modeling and Real-time Locating System (위치추적기술을 이용한 BIM기반 건설현장 안전관리 시스템)

  • Lee, Hyun-Soo;Lee, Kwang-Pyo;Park, Moon-Seo;Kim, Hyun-Soo;Lee, Sa-Bum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.135-145
    • /
    • 2009
  • The main goal of construction projects from the past has been enhancing efficiency by reducing cost and time. but, seeing the current condition of safety management of many construction companies nowadays, it is true that not much attention has been paid to safety management for a long time. However, there are paradigm shift from the cost and term of works to safety management in the construction industry, from this circumstance the safety management is evaluated more importantly. Though less accident happens compared to past, the accidents are getting greater because construction projects nowadays are bigger and more complex and monetary loss from the accidents are increasing. Also, the severity is getting greater and even fatal. For this reason, more improved safety management is very necessary. Therefore, we are to propose more efficient system for safety management in this thesis. Technical parts for developing system include many technique such as Real Time Locating system, and other techniques like Monitoring module based on BIM, Data Mart, Alarm are also applied together. Through this system, in the construction site, safety management is performed more effectively and widely because the system can manage the human resource and fluid situation. Also, safety manager can conduct more systematically and advanced safety management through human resource dominated safety management.