• Title/Summary/Keyword: modular building construction

Search Result 192, Processing Time 0.029 seconds

A comparative analysis of load behavior of the fixing equipments for transporting unit modules (유닛모듈 운반용 고정장치의 하중거동 비교 분석)

  • Kim, Kyoon-tai;Kim, Seok;Jun, Young-Hun;Kim, Tae-Yeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.146-147
    • /
    • 2015
  • This paper compares load behavior of two fixing equipments for transporting unit modules. The suggested fixing equipment shows higher limit load than an existing fixing equipment, which proves that the suggested fixing equipment have higher safety.

  • PDF

Comparison of Behavior of Connections between Modular Units according to Shape of Connector Plates (연결 강판 형상에 따른 모듈러 유닛 간 접합부의 거동 비교)

  • Lee, Sang Sup;Bae, Kyu Woong;Park, Keum Sung
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.6
    • /
    • pp.467-476
    • /
    • 2016
  • For the connections between modular units in modular buildings, the bolted joints with connector plates are used commonly. The strength of structure is determined by the weakest part of structure and the connections may be weaker than the members being joined. Therefore, to check the safety of modular building, the structural performance of connections between modular units as well as that of beam-to-column connections should be evaluated. In this study, the behavior of module to module connection with straight and cross shaped connector plates is investigated by lateral cyclic tests according to KBC2009 0722.2.4 which shall be conducted by controlling the story drift angle in the width and the longitudinal direction respectively. All of test results generally show the stable ductile behavior up to 0.04rad drift levels and the tests in longitudinal direction show a superior energy dissipation per cycle in each of the load steps. However, the straight shaped connector plates have the degradation of stiffness with cyclic loading and the larger drift angle of column than the cross shaped connector plates.

Structural Performance of the Modular System with Fully Restrained Moment Connections using Ceiling Bracket (천장 브래킷을 이용한 완전강접합 모듈러 시스템의 구조성능)

  • Lee, Seung-Jae;Kwak, Eui-Shin;Park, Jae-Seong;Kang, Chang-Hoon;Shon, Su-Deok
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.33 no.12
    • /
    • pp.37-44
    • /
    • 2017
  • Due to structural characteristics, construction costs and duration of a modular system would be saved by minimizing the schedule on the job site. As such, it is crucial to develop a connection that can guarantee stiffness while allowing for simple assembling. Particularly, the mid- to high-rise construction of the modular system necessitates the securing of the structural stability and seismic performance of multi-unit frames and connections, and thus, the stiffness of unit-assembled structures needs to be re-evaluated and designed. However, evaluating a frame consisting of slender members and reinforcing materials is a complicated process. Therefore, the present study aims to examine the structural characteristics of a modular unit connection based a method for reinforcing connection brackets and hinges while minimizing the loss of the cross section. Toward this end, the study modeled the beam-to-column connection of a modular system with the proposed connection, and produced a specimen which was used to perform a cycling loading test. The study compared the initial stiffness, the attributes of the hysteretic behavior, and the maximum flexural moment, and observed whether the model acquired the seismic performance, compared to the flexural strength of the steel moment frame connection that is required by the Korean Building Code. The test results showed that the proposed connection produced a similar initial stiffness value to that of the theoretical equation, and its maximum strength exceeded the theoretical strength. Furthermore, the model with a larger ceiling bracket showed higher seismic performance, which was further increased by the reinforcement of the plate.

A Study on Evaluation of Optimal Construction Method of BTL Projects - Focused on Educational Facilities - (BTL 적용 교육시설의 최적 건축공법 평가에 관한 연구)

  • Park, Yoo-Young;Cho, Bong-Ho;Kim, Ki-Hyun;Lee, Chun-Kyong;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.22-31
    • /
    • 2009
  • In the buildings of educational facilities ordered by BTL projects, the competent authorities, private business, and users of school get to have a deep conflict, due to extra expenses resulted from shortening of construction period and establishment of temporary school building, and inconveniences users of school have to undergo during semester. This study aims at solving immediate problems in the aspect of construction method, proposing several alternative plans, including RC construction method generally applied to construction of the existing school, and modular construction method that is emerged as an alternative method for educational facilities lately, along with the method of construction appropriate for BTL projects of educational facilities, calculating cost of construction required for each alternative plan, analyzing and evaluating period of construction.

Indoor Air Quality Evaluation of Commercial Urban Regeneration Modular Structure According to Space Usage (상업용 도시재생 모듈러 건축물의 공간이용에 따른 실내공기질 평가)

  • Nam, So-Jeong;Kim, Sea-Ryon;Pyung, Woo-Jin;Kang, Yujin;Kim, Sumin
    • Journal of the Korea Furniture Society
    • /
    • v.27 no.3
    • /
    • pp.246-252
    • /
    • 2016
  • From 2000s, modular construction has gained more attention due to many advantages such as reduction of duration, recycling. The modular structure is being used for urban regeneration recently. However, even though most facilities in the modular structures which are used as urban regeneration building are commercial spaces, exhibition spaces, eating and drinking spaces, there are lack of natural or mechanical ventilation systems. Also, there are relatively limited spaces on modular structure characteristic. Therefore, indoor environment performance of four buildings, which are performed as urban regeneration in Seoul, was evaluated by HCHO and $CO_2$ emissions. Consequently, the HCHO and $CO_2$ emissions of the commercial and exhibition spaces were confirmed that can influence on health of occupants. Therefore, the urban regeneration modular structure needs to add local ventilation systems for improvement of indoor air quality to more healthy and comfortable.

The experimental study on productivity increase of the permanent form (비탈형 영구거푸집의 생산성 향상을 위한 실험적 연구)

  • 김용성;서동훈;강병훈;김우재;김성식;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.751-756
    • /
    • 2001
  • Permanent-Form is one of system forms for reducing human labor, work costs, oscillation, noise, construction wastes and so on. Permanent-Form is made from precast method in facilities. and carried in construction site to assemble with no demolding. The biggest expense to produce Permanent-Form is about manufacturing mold. To satisfy various size of building member, the same number of manufacturing mold is needed. In this paper, studied about manufacturing mold module for acquiring economic merit and construction member safety. Permanent-Form is member stress and structural analyzed if temporary equipment were used. The result of this study is below. (1) Column sizes of Permanent-Form are 47 kinds of prototype that based on Modular coordination's basic module. 4 pieces or 6 pieces are composed basically. (2) For beam size modular coordination, standard height and width of beam are 150mm and 100mm. It brings 24 kinds of prototype. 4 pieces or 5 pieces are composed basically. (3) Structural analysis value of modular member is like this Column member shows 9.4 to 85kgf/$cm^{2}$ stress distribution and beam member shows 6.3 to 95kgf/$cm^{2}$ stress distribution. Constructing permanent form could have structural safety with use of temporary equipment

  • PDF

Experimental Study on the Cyclic Behavior of Modular Building with Strap Braced Load Bearing Steel Stud Walls (스트랩 브레이스를 갖는 내력벽식 모듈러건축 스틸스터드 벽체의 반복하중에 대한 거동 연구)

  • Lee, Doo Yong;Cho, Bong Ho;Kim, Tae Hyeong;Ha, Tae Hyu
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.6
    • /
    • pp.415-425
    • /
    • 2016
  • Load-bearing steel stud wall system is widely used for the middle-to-high rise modular buildings worldwide. Seismic performance is a key issue to apply load-bearing steel stud wall system to modular buildings in Korea. This study proposes a new strap braced steel stud wall system with enhanced seismic performance and design equations considering the flexural behaviour of the vertical outer studs. For the verification, two specimens with different strap braces and vertical outer stud were designed and tested. The test results showed that the total strengths were evaluated to be 1.11 to 1.18 times higher than the predicted values. Usually strap braced walls are considered to have low energy dissipation capacities. The proposed system showed enhanced seismic performance with equivalent damping of 9.42% due to the reduced pinching effects.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Support Modular System for Sustainable-Perpetual-Modular Road (지속가능한 장수명 모듈러 도로를 위한 지지 모듈러 시스템)

  • Donggyou Kim
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.1
    • /
    • pp.37-44
    • /
    • 2023
  • In this study, the performance of the support modular system, as substructure of the proposed sustainable-perpetual modular road system to reduce road construction time and maintenance costs was evaluated. A modular road system consisting of 4 support modular cross-beams with a lower curved surface was constructed on the test-bed. Six load cells and eight LVDTs were installed in the center part of two cross-beam support modular systems. Two loads, 50kN and 100kN, were applied to 15 points on the pavement slab to measure the load and displacement occurring in the modular road system. The measured displacements were less than 1 mm, so it is considered that there was no problem in the stability of the actual road. When comparing the two applied loads and the measured loads in the field test, it was considered that the load transmitted to the ground under the support modular system is very small. It is considered that the modular road system with the support modular system is applicable to the actual road site.

Analyzing the Cost Variances by the Changes of Grades in the Long-life Housing Certification System (장수명주택 인증등급 변화에 따른 공사비 변동 분석)

  • Song, Sang-Hoon;Park, Ji-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.222-223
    • /
    • 2019
  • Many attention have been paid to the innovative technologies aiming at the paradigm shift such as the modular housing, pre-fabrication method, or long-life housing. Despite the government's efforts to diffuse the long-life housing, few case gained the high grades by applying various technologies required in the Long-life Housing Certification System. The concerns of cost increase and low profit are the main reason why most of the construction firms avoid the adoption of long-life housing. In this study, the variations of construction costs were analyzed according to the grades in the Long-life Housing Certification System. The results of this study will help the decision makers find the optimal solution in employing the long-life housing technologies during planning.

  • PDF