Fossil power plant availability is significantly affected by gradual degradations of equipment as operation of the plant continues. It is quite important to determine whether or not to replace some equipment and when to replace the equipment. Performance calculation and analysis can provide the information. Robustness in the performance calculation can be increased by using verification & validation of measured input data. We suggest new algorithm in which estimation relation for validated measurement can be obtained using correlation between measurements. Input estimation model is obtained using design data and acceptance measurement data of domestic 16 fossil power plant. The model consists of finding mostly correlated state variable in plant state and mapping relation based on the model and current state of power plant.
Rice Processing Complex(RPC) have being constructed with a rice mill plant and a facility of drying and storage to overcome problems caused by UR and to produce good quality of rice. An optimal design of a rice mill plant was required to successfully construct and operate it. The development of a simulation model was essential to the design of a rice mill plant. So, all the objectives of this study were to develop a simulation model for the design of a rice mill plant and to develop and evaluate the rice mill system. In this study the simulation model was developed to design a rice mill plant using SLAMSYSTEM, one of simulation languages. The results of this study were as followings. 1. A simulation model was developed with SLAMSYSTEM to represent the processes of a rice mill plant. The simulation model was used to design a rice mill pilot plant with the capacity of 0.5 ton per hour. The rice mill pilot plant was analyzed by the model with alternatives. 2. In the simulation the rice mill system was much influenced by the separating efficiency of a brown rice separator. Especially, the bottleneck of grain flow occurred at the buffer tank for brown rica. separator under 50% separating efficiency of brown rice separator. Hence, as the alternative simulation was conducted under 60% , 70% separating efficiency of brown rice separator, the bottleneck of the system could be minimized at the 60% separating efficiency of brown rice separator. 3. In the alternative simulation the bottleneck of the system was minimized under the hulling capacity of 1 t/h and 60% separating efficiency of brown rice separator with the capacity of 1 t/h. Under such a condition the max. weight of waiting entities at buffer tanks was less 250kg. So, the capacities of the buffer tanks were determined in the basis of simulation results. 4. The milled rice recovery and head rice recovery of the milling system were 74% and 92% in the simulation, respectively. These results of simulation almost corresponded to those of actual rice mill plants. The developed simulation model could be well applied to design a rice mill plant.
With globally increasing interests in climate-soil-vegetation system, a new stochastic model of soil water and plant water stress is derived for better understanding of the soil water and plant water stress dynamics and their role in water-controlled ecosystem. The steady-state assumption is used for simplifying the equations. The derived model is simple yet realistic that it can account for the essential features of the system. The model represents the general characteristics of rainfall, soil, and vegetation; i.e. the soil moisture constitutes the decrease form of the steady-state and the plant water stress becomes increasing with the steady state when the rainfall is decreased. With this model, further deep study for the effects of soil water and plant water stress on the system will be accomplished.
Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1570-1575
/
2009
The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.
Journal of Advanced Marine Engineering and Technology
/
제19권3호
/
pp.77-83
/
1995
Recently, in the field of industrial servo-systems, several methods have been proposed for tracking the reference input fastly and finely without overshoot. These methods, however, are established under hypothesis that structure and parameters of the plant are known accurately and they are time invariant. In practice, it is difficult to obtain the values of plant's parameters accurately and usually plants change with time and operation conditions. In this paper a method to construct the nominal model tracking adaptive control system is proposed. The system is composed of the nomial model which produces a ideal response and the model tracking system with the fuzzy adaptive controller. If the actual plant is equal to the controlled object in the nominal model, the output of the plant is the same as that of the nominal model and the fuzzy adaptive controller becomes idle. However, when the plant changes, the fuzzy adaptive controller of the tracking system operates in order for the output of the plant to track the ideal response. Through the computer simulations under various conditions, it is confirmed that the proposed model tracking system is very effective.
The rice plant is one of the important staple crops in Korea. The high yield with low cost in rice is required the soil fertility and the development of new precise method of fertilizer application by nutritional diagnosis. Now, in Korea, the nitrogen application system for the rice plant is composed of the basal fertilization, fertilization at tillering stage and fertilization at panicle stage, which the nitrogen fertilization at panicle stage amount to about 30 percent in the total amount. Thus, this experiment carried out to the development of the system that can measure the nitrogen content in the rice plant at panicle stage rapidly with the near infrared spectroscopy, and to predict the appropriate quantity of the nitrogen fertilization at panicle stage based on calibration model for test of nitrogen content in rice plant. The samples were collected from 48 varieties in 4 regions which are mainly cultivated in the southern part of Korea. And then, it collected by classifying into the leaf, the whole plant and the stem since 7 days before the nitrogen fertilization at panicle stage. The ranges of the nitrogen contents were 1.6∼4.0%, 1.7∼3.0% and 1.4∼2.7% in the leaf, the whole plant and the stem, respectively. In the calibration models created by each part of the plant under the Multiple Linear Regression(MLR) method, the calibration model for the leaf recorded the relatively high accuracy. The mutual crossing test on unknown samples were carried out using Partial Least Square(PLS) calibration model. That is, the nitrogen content in the stem was tested by calibration model made by the leaf model and that of stem was tested by calibration model made by whole plant sample. When unknown leaf sample was tested by calibration model made by all sample that collected from each part in rice plant such as leaf, stem and whole plant, it recorded the highest accuracy. As a result, to test the nitrogen content in the rice plant at panicle stage, the nitrogen content in the leaf shall be tested by the calibration model composed of the leaf, the stem and the whole plant. In future, to estimated the amount of nitrogen fertilization at panicle stage for rice plant , it will be calculated based on regression model between rice yield and nitrogen content of leaf measured by calibration model made by mixed sample including leaf, stem and whole plant.
For many industrial processes there are good static models used for process design and steady state operation. By using system identification techniques, it is possible to obtain black-box models with reasonable complexity that describe the system well in specific operating conditions [1]. But black-box models using inductive modeling(IM) is not suitable for model based control because they are only valid for specific operating conditions. Thus we need to use deductive modeling(DM) for a wide operating range. Furthermore, deductive modeling is several merits: First, the model is possible to be modularized. Second, we can increase and decrease the model complexity. Finally, we are able to use model for plant design. Power plant must be able to operate well at dramatic load change and consider safety and efficiency. This paper proposes a simplified nonlinear model of an industrial boiler, one of component parts of a power plant, by DM method and applies optimal control to the model.
The flow and heat transfer characteristics inside a solar chimney power plant system are analyzed in this article. 3-D model with the $k-{\varepsilon}$ turbulence closure was developed. In this model, to solve the radiative transfer equation the discrete ordinates radiation model was implemented, using a two-band radiation model. To simulate radiation effects from the sun's rays, the solar ray tracing algorithm was coupled to the calculation via a source term in the energy equation. Simulations were carried out for a system with the geometry parameters of the Manzanares power plant. Based on the numerical results, the velocity and temperature distributions were illustrated and the results were validated by comparing with experimental data of the Manzanares prototype power plant. Moreover, temperature profile of the ground surface of the system was illustrated.
한국시뮬레이션학회 1998년도 The Korea Society for Simulation 98 춘계학술대회 논문집
/
pp.86-90
/
1998
The safety and reliability of nuclear power plant operations relies heavily on the plant operators ability to respond to various emergency situations. It has become standard industry practice to utilize simulators to improve the safety and reliability of nuclear power plants operations. The simulators built for Younggwang#3,4, which is the basic model of the Korean Nuclear Power Plant design, has been developed precisely for this purpose. Dynamic Model and Display Model are developed under US3(UNIX Simulation Software Support System) environment in simulator for Younggwang#3,4. Since these two models are developed under each own operating system, it is necessary to develop a method for transporting data between these two systems. This paper descirves communication environment between Dynamic Model and Display Model, and addresses a file generation method for the Display Model, which will be necessary for designing MMI of MCR(Main Control Room) in the furture.
본 논문에서는 퍼지 모델과 유진 알고리즘을 이용한 쓰레기 소각로의 언소 제어를 제안한다. 먼저 복잡하고 비선형 시스템인 소각로의 퍼지 모델을 얻기 위해 퍼지 모델링이 수행된다. 얻어진 퍼지 모델은 주어지는 입력에 대해 소각로의 출력을 예측한다. 그리고 유전 알고리즘을 이용하여 원하는 소각로 츨려에 대해 모든 가능한 해 집합 안에서 최적 제어입력 값을 탐색하고 얻어진 최적 제어입력은 소각로에 인가되어 제어가 행해진다. 제안된 방법의 성능을 평가하기 휘해, 증발량을 출력으로 하는 소각로 연소제어의 컴퓨터 시뮬레이션이 수행되었다. 그 결과, 소각로의 퍼지 모델의 성능 평가지수 ISE(오차제곱 적분)는 0015로 매우 작았으며, 연소제어 시 증발량은 설정값 주위에서 일정하게 유지되고, 제안된 방법에 의한 성능지수 ITAE는 352로 수동운전에 의한 결과 1275보다 우수하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.