• Title/Summary/Keyword: mockup test

Search Result 47, Processing Time 0.034 seconds

The Qualification Test of KSLV-I(NARO) Assembly Complex

  • Jin, Seung-Bo;Cho, Byoung-Gyu;Lee, Chang-Bae;Chun, Young-Doo;Seo, Dong-Chan;Chung, Eui-Seung
    • Bulletin of the Korean Space Science Society
    • /
    • 2009.10a
    • /
    • pp.49.1-49.1
    • /
    • 2009
  • Ground Complex, which is located at Naro Space Center, consists of Assembly Complex(AC) and Launch Complex(LC) which is necessary for successful launch of KSLV-I(NARO). AC consists of Assembly/Testing Building(ATB), Payload Processing Building(PPB), Kick Motor Building(KMB). The purpose of AC is accepting of KSLV-I components, testing, checkout, assembly(disassembly) of the launch vehicle(LV), readiness for transferring LV to LC, accepting of integrated Launch Vehicle(ILV) in case of launch cancellation and short/long time storage, and so on. Qualification tests(QT) for the total system at AC are carried out to check hardware used for operations with first stage unit mockup, upper stage unit Mockup and integrated mockup(GTV). The qualification tests is carried out according to program and procedures of QT. By course of this process, AC is certificated that all the systems and facilities of AC are guaranteed by the fulfillment of technological operations envisioned in the program of qualification tests during the work with the mock-up.

  • PDF

Collaborative Maintenance Simulation System Using Virtual Mockup (가상목업을 활용한 협업 정비 시뮬레이션 시스템)

  • Lee, Jun-Kyu
    • Journal of Korea Multimedia Society
    • /
    • v.15 no.1
    • /
    • pp.148-165
    • /
    • 2012
  • Applying maintenance simulation using virtual mockup in product design phase enables maintainability test before prototyping physical products, and it is expected to reduce product development costs. The simulation results can be reused as contents of service manuals and RAM (Reliability, Availability, Maintainability) analysis data. Maintenance simulation should provide realistic representation of physical property of virtual product, assembly relation between parts and manipulation process to verify feasibility of product design. The simulation system should be extended to collaborative virtual environment to perform collaborative maintenance procedures. In this paper, the three layered system architecture and the physics based collaborative interaction technique are proposed to extend current maintenance simulation into collaborative virtual environment. The proposed system was implemented as ViMMS (Virtual Mockup Maintenance Simulation system), and compared with case study results of VADE (Virtual Assembly Design Environment). As a result, the ViMMS encompassed broader range of maintenance tasks by using physics based collaborative interaction technique.

Study on Development of air-passing soundproofing panel (통풍형 방음벽 개발에 관한 연구 I)

  • Yoon, Je-Won;Sim, Sang-Deok;Kim, Young-Chan;Ku, Bon-Sung;Eom, Joo-Yong
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2011.04a
    • /
    • pp.638-643
    • /
    • 2011
  • The aluminum soundproofing panel used to the traffic noise reduction will judge with the material to improve because the CO2 emission is greater than other soundproofing panel such as plastic soundproofing panel. Also, if the air-passing soundproofing panel which can endure the fast wind velocity will be developed, it judged that it can reached to the target of low CO2 traffic technology development using the reduction of material cost and the lower consumption of steel. The objective of this study is to improve the soundproofing panel and to develop the air-passing soundproofing panel for the replacement of aluminum sound proofing panel which is more emit CO2 than other soundproofing panel. And, we tried to develop the reduction technology of CO2 emission through the development of air-passing soundproofing panel. At first, the flow and noise simulation were conducted for the purpose of the calculation of wind pressure on soundproofing wall and noise exposure level on receiver points according to the open ratio of air-passing soundproofing panel. And the 1st and 2nd mockup of air-passing soundproofing panel were made, and the design load test were conducted for these mockup.

  • PDF

Construction Method and Durability Evaluation of Mock-up Test for Bobsleigh Track (실물크기형 봅슬레이 트랙 Mock-up Test 시공방법 및 내구성 평가)

  • Lee, Kyeo-Re;Han, Seung-Yeon;Nam-Gung, Kyeong;Yun, Kyong-Ku
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.315-323
    • /
    • 2016
  • This study examined the durability and method for making a mockup of bobsled tracks for constructing a bobsled stadium, which is a sport in the Winter Olympics. As bobsleigh games are very fast and dangerous, a safety design for players and a precise construction using highly efficient shotcrete is necessary. Moreover, a general molding construction is difficult because bobsleigh tracks are composed of various curves and slopes, and it is necessary to construct them using high-strength and high durability materials. The developed method for making a mockup and performing durability evaluation of bobsleigh tracks through this research will be applied in the construction of the 2018 Pyeongchang Winter Olympics Sliding centre and bobsleigh tracks using domestic techniques.

An Experimental Study on Piping Feasibility of PE Compound Pipe for Fire Protection Service (PE 이종강관의 소방용 배관 적용성에 관한 실험적 연구)

  • Park, Jeong-Hwa;Oh, Cheon-Young;Kwark, Ji-Heon;Son, Bong-Sei
    • Fire Science and Engineering
    • /
    • v.30 no.3
    • /
    • pp.55-61
    • /
    • 2016
  • In this study, to determine whether it is possible to apply Polyethylene (PE) compound pipe, which was developed to solve the problem caused by the corrosion of the fire protection piping currently in usein water based fire extinguishing systems, we performed an actual mockup fire test. Since no test standard was available related to the developed compound pipe, we compared and analyzed domestic and international technical materials and test standards and selected suitable fire test standards to evaluate the performance of the PE compound pipe. we applied two fire test standards to the PE compound pipe, viz. those for CPVC and metallic pipes, and conducted a total of 6 experiments to evaluate its performance. According to the results of the first and second fire tests based on the test standard for the CPVC pipe, neither the fitting nor the piping was damaged or deformed and no leakage was observed in the pressure test, which was performed for 5 minutes. For the fire test based on the metallic pipe test standard, a total of 4 experiments were conducted. The first two experiments were conducted to simulate the wet piping system. In the results of this fire test, neither leakage nor rupture was observed from the PE compound pipe and no damage was caused, such as the secession of the PE material. However, in the next two experiments, which simulated the dry system, the PE compound pipe suffered damage and rupture, including deformation before the fire fighting water was discharged. Therefore, we found that the piping performance of the PE compound pipe did not undergo any deterioration, including fusion, deformation, or damage, in the wet piping system simulated fire test.

Development of Bench Tester for Designing the Passive Anti-Rolling Tanks (수동형 감요수조 설계를 위한 벤치테스터 개발)

  • Lew, Jae-Moon;Kim, Hyochul
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.6
    • /
    • pp.452-459
    • /
    • 2015
  • It is important to use bench test results in the design process of anti-rolling tanks. Traditional bench tester is usually designed to perform only roll motions about a fixed axis and relatively small so that the viscous effects may not be neglected. Novel bench tester which could adjust the motion center to realize the coupled motion of sway and roll has been devised and manufactured therefore, large scaled bench tester could be utilized for designing the passive anti-rolling tanks. The time history of the reference signal from the rotation sensor of the bench tester have been recorded and processed to determine the phase angle to derive the Response Amplitude Operator(RAO) of the stabilized ship. The breadth of ART tank model should be large up to 2 m to diminish viscous scale effect and the vertical position of the tank can be varied with the ship's center of motion. The periods and the amplitude of roll motion can be varied from 1.5 sec to 5 sec and up to ±20°, respectively. The components of the tester was expressed in three dimensional digital mockup (DMU) and assembled together in the CAD space. The final configuration of the bench tester has been determined by confirming the smooth operation of the moving parts without interference through the animation in CAD space. New analytic logic are introduced for the determination of hydrodynamic moment and phase difference due to fluid motion in ART and verified through the test. The developed bench tester is believed to be effective and accurate for the verification of stabilization effect of ART taking into the consideration of the sway effect in the design stage.

Mockup Test of the High Volume Blast Furnace Slag Concrete Using Recycled Aggregates and Incinerator Ash (순환골재 및 소각장 애시를 자극제로 사용한 고로슬래그 미분말 다량치환 콘크리트의 Mock-up 성능평가)

  • Kim, Young-Hee;Kwak, Yong-Jin;Kim, Jun-Ho;Lee, Hyang-Jae;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.19-21
    • /
    • 2012
  • This paper was to investigate the effect of incinerator ash on engineering properties of the high volume blast furnace slag concrete through Mock-up test. Test results revealed that the use of recycled aggregates resulted in increase of slump compared with the OPC concrete. But, the use of recycled aggregates did not affect the results of air contents and chloride contents. The use of recycled aggregates showed shortening of setting time of high volume blast furnace slag concrete. When the recycled aggregate was used, delay in strength development at early age happened with high volume blast furnace slag concrete compared with that of OPC concrete.

  • PDF