• Title/Summary/Keyword: mining pit

Search Result 43, Processing Time 0.02 seconds

Experimental Study on the Adjustment Processes of Minning Pit in the Dredged Channels (준설하천의 웅덩이 적응에 관한 실험적 연구)

  • Jang, Chang-Lae;Jung, Kwan-Sue
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.7
    • /
    • pp.657-666
    • /
    • 2010
  • The adjustment processes of mining pits in the disturbed channels by sand or gravel mining were investigated by laboratory experiments in this study. The pit migrated with speed when the river bed was steep. The pit migrated slow and steady when the pit was filling with sand, but the pit migrated with speed after the filling processes was finished. The submerged angle of repose in the pit was nearly constant during the pit was filling. The pit was filled with sand with speed as the channel slope was increased. It took time for the pit to be filled with sand as the pit dimension was increased. This meant that the disturbed channels by sand or gravel mining to adjust the new environment was dependent on the slope of the channels and the dimension of the pits. The dimensionless pit length was short and the dimensionless pit depth was shallow as the time was increased. The dimensionless pit depth was shallow, but the dimensionless pit migration speed was increased as the dimensionless shear velocity and the migration speed of the pit were increased. The dimensionless pit depth was increased with the dimensionless bar migration speed. The shape of the pit was deformed and migrated downstream in accordance with the location and shape of the biased bar front which was developed upstream.

Numerical Simulations of Developing Mining Pit using Quasi-Steady Model (준정류모형을 이용한 하천의 준설 웅덩이 발달 모의)

  • Choi, Sung-Uk;Choi, Seongwook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.1B
    • /
    • pp.53-57
    • /
    • 2012
  • This study presents a numerical model that is capable of simulating the evolution of mining pit in a stream. The numerical model is based on the quasi-steady assumption that the flow is steady with time-dependent morphological change. This hypothesis is valid due to the fact that the stream morphology changes over a long period compared with the time of flow change. Before applications, numerical experiments are carried out with two total load formulas such as Engelund and Hansen's (1967) and Ackers and White's (1973). It is found that the use of Engelund and Hansen's formula reproduces evolution of mining pit best compared with simulated profiles in Parker (2004). Then, the model is applied to two laboratory experiments in the literature. In general, the numerical model simulates properly the evolution of mining pit in laboratory open-channels. However, it is found that the model does not reproduce head-cutting, propagating upstream, and under-estimates the wave of the bed, propagating downstream, after finishing the re-fill of the mining pit.

Model test on slope deformation and failure caused by transition from open-pit to underground mining

  • Zhang, Bin;Wang, Hanxun;Huang, Jie;Xu, Nengxiong
    • Geomechanics and Engineering
    • /
    • v.19 no.2
    • /
    • pp.167-178
    • /
    • 2019
  • Open-pit (OP) and underground (UG) mining are usually used to exploit shallow and deep ore deposits, respectively. When mine deposit starts from shallow subsurface and extends to a great depth, sequential use of OP and UG mining is an efficient and economical way to maintain mining productivity. However, a transition from OP to UG mining could induce significant rock movements that cause the slope instability of the open pit. Based on Yanqianshan Iron Mine, which was in the transition from OP to UG mining, a large-scale two-dimensional (2D) model test was built according to the similar theory. Thereafter, the UG mining was carried out to mimic the process of transition from OP to UG mining to disclose the triggered rock movement as well as to assess the associated slope instability. By jointly using three-dimensional (3D) laser scanning, distributed fiber optics, and digital photogrammetry measurement, the deformations, movements and strains of the rock slope during mining were monitored. The obtained data showed that the transition from OP to UG mining led to significant slope movements and deformations that can trigger catastrophic slope failure. The progressive movement of the slope could be divided into three stages: onset of micro-fracture, propagation of tensile cracks, and the overturning and/or sliding of slopes. The failure mode depended on the orientation of structural joints of the rock mass as well as the formation of tension cracks. This study also proved that these non-contact monitoring technologies were valid methods to acquire the interior strain and external deformation with high precision.

Experimental Study on the Adjustment Processes of a Series of Mining Pits in the Dredged Channels (준설하천에서 직렬로 배열된 웅덩이의 적응에 관한 실험적 연구)

  • Jang, Chang-Lae;Lee, Gi-Ha
    • Korean Journal of Ecology and Environment
    • /
    • v.44 no.4
    • /
    • pp.385-395
    • /
    • 2011
  • The adjustment processes and responses of a series of mining pits by sand or gravel mining were investigated by laboratory experiments. The filling processes of the two pits were affected by the bars developed in the upstream of the channel. However, the bars were not developed and the bed was degradated in the downstream of the pits due to little sediment flow, which was trapped in the pits. The submerged angle of repose in the pits was nearly constant when the pits were being filled. After the filling processes of the pits were finished, the pit was speedily filled with sediment, and the bed was aggradated and migrated with speed. However, the angle of repose decreased. As the distance between the upstream pit and the downstream pit increased, the bed of the pit downstream was tailcutted and degradated. The migration speed of the pit decreased. However, the dimensionless pit depth increased as the distance between the pits increased. The dimensionless pit depth increased with time.

Design and Implementation of Early Warning Monitoring System for Cross-border Mining in Open-pit Mines (노천광산의 월경 채굴 조기경보 모니터링시스템의 설계 및 구현)

  • Li Ke;Byung-Won Min
    • Journal of Internet of Things and Convergence
    • /
    • v.10 no.2
    • /
    • pp.25-41
    • /
    • 2024
  • For the scenario of open pit mining, at present, manual periodic verification is mainly carried out in China with the help of video surveillance, which requires continuous investment in labor cost and has poor timeliness. In order to solve this difficult problem of early warning and monitoring, this paper researches a spatialized algorithmic model and designs an early warning system for open-pit mine transboundary mining, which is realized by calculating the coordinate information of the mining and extracting equipments and comparing it with the layer coordinates of the approval range of the mines in real time, so as to realize the determination of the transboundary mining behavior of the mines. By taking the Pingxiang area of Jiangxi Province as the research object, after the field experiment, it shows that the system runs stably and reliably, and verifies that the target tracking accuracy of the system is high, which can effectively improve the early warning capability of the open-pit mines' overstepping the boundary, improve the timeliness and accuracy of mine supervision, and reduce the supervision cost.

Numerical Modelling of the Adjustment Processes of Minning Pit in the Dredged Channels (수치모의를 이용한 준설하천의 웅덩이 적응에 관한 연구)

  • Jang, Chang-Lae
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.10
    • /
    • pp.921-932
    • /
    • 2010
  • In this study, the adjustment processes of the disturbed channels by sand or gravel mining were investigated by a two dimensional numerical model in the generalized coordinate system. As a numerical scheme, the CIP (cubic interpolated pseudoparticle method) method was used to calculate the advection term in the flow field and central difference method was used to the diffusion term in it. The pit of the channel was partially filled with sediment at the toe of the pit upstream. As time increased, the headcut erosion upstream in the pit was decreased due to the sediment inflow. The almost inflow sediment upstream was trapped into the pit and the sediment deposit wedge migrated downstream in the pit with the steep submerged angle of repose. The numerical model was reproduced well the evolution processes of the channel. The mining pit migrated with speed as the channel was steep, and the numerical results were in overall agreement with the experimental results.

Designing a Vehicles for Open-Pit Mining with Optimized Scheduling Based on 5G and IoT

  • Alaboudi, Abdulellah A.
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.3
    • /
    • pp.145-152
    • /
    • 2021
  • In the Recent times, various technological enhancements in the field of artificial intelligence and big data has been noticed. This advancement coupled with the evolution of the 5G communication and Internet of Things technologies, has helped in the development in the domain of smart mine construction. The development of unmanned vehicles with enhanced and smart scheduling system for open-pit mine transportation is one such much needed application. Traditional open-pit mining systems, which often cause vehicle delays and congestion, are controlled by human authority. The number of sensors has been used to operate unmanned cars in an open-pit mine. The sensors haves been used to prove the real-time data in large quantity. Using this data, we analyses and create an improved transportation scheduling mechanism so as to optimize the paths for the vehicles. Considering the huge amount the data received and aggregated through various sensors or sources like, the GPS data of the unmanned vehicle, the equipment information, an intelligent, and multi-target, open-pit mine unmanned vehicle schedules model was developed. It is also matched with real open-pit mine product to reduce transport costs, overall unmanned vehicle wait times and fluctuation in ore quality. To resolve the issue of scheduling the transportation, we prefer to use algorithms based on artificial intelligence. To improve the convergence, distribution, and diversity of the classic, rapidly non-dominated genetic trial algorithm, to solve limited high-dimensional multi-objective problems, we propose a decomposition-based restricted genetic algorithm for dominance (DBCDP-NSGA-II).

Development Environment for Open-pit Mine Monitoring System using Geospatial Open Platform and Open Source Software (공간정보오픈플랫폼 및 오픈 소스 기반의 노천광산 모니터링시스템 개발을 위한 환경 조성)

  • Lee, Hyun Jik;Kim, Se Yul;You, Ji Ho
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.4
    • /
    • pp.165-173
    • /
    • 2014
  • Open-pit mining method, is safe relatively work as compared with underground mining. And high yield, low production cost, has the advantage that it can provide a lot of production. But deforestation, tailings and slag deposition, mineral debris, dust, water, noise, land subsidence, sediment runoff discharge, I have internalized environmental disaster predisposing factors, such as landslides. Thus, it may be noted, also by typical environmental regulations. We try to deal with the changes in open pit terrain and environment related issues. Then, use the recovery period and the open pit mine and ecology off the gun, environment-friendly development of accurate monitoring methods, systems of this development is required. The use of open platforms and open source GIS tools have been developed during this period, it needs to develop spatial information environment monitoring system open pit mine construction.

Some Suggestions to Reduce Environmental Hazards from Open Pit Mining and to Revise Related Regulations for Limestone Mines (석회석 자원의 노천채굴에 따른 환경 오염원의 저감 및 관련 제도의 개선방안)

  • 임한욱;백환조
    • Tunnel and Underground Space
    • /
    • v.9 no.3
    • /
    • pp.230-237
    • /
    • 1999
  • Production of limestone for cement in Kangwon and Chungbuk areas reaches over 80 million tonnes per year. However, many regulatory activities for preservation of the environment against potential hazardous impacts from the open pit mining make it difficult for the industry. With recent improvement of the mining methods and working conditions, the regulations related to the quarrying of limestone may need to be revised. Methods for reducing environmental hazards are proposed in this paper, with some suggestions concerning the revision of related regulations. This study is expected to serve as a practical solution for the cement industry in balance of preservation and development.

  • PDF

3-dimensional Modeling and Mining Analysis for Open-pit Limestone Mine Stope Using a Rotary-wing Unmanned Aerial Vehicle (회전익 무인항공기를 이용한 노천석회석광산 채굴장 3차원 모델링 및 채굴량 분석)

  • Kang, Seong-Seung;Lee, Geon-Ju;Noh, Jeongdu;Jang, Hyeongdoo;Kim, Sun-Myung;Ko, Chin-Surk
    • The Journal of Engineering Geology
    • /
    • v.28 no.4
    • /
    • pp.701-714
    • /
    • 2018
  • The purpose of this study is to show the possibility of 3-dimensional modeling of open-pit limestone mine by using a rotary-wing unmanned aerial vehicle, a drone, and to estimate the amount of mining before and after mining of limestone by explosive blasting. Analysis of the image duplication of the mine has shown that it is possible to achieve high image quality. Analysis of each axis error at the shooting position after analyzing the distortions through camera calibration was shown the allowable range. As a result of estimating the amount of mining before and after explosive blasting, it was possible to estimate the amount of mining of a wide range quickly and accurately in a relatively short time. In conclusion, it is considered that the drone of a rotary-wing unmanned aerial vehicle can be usefully used for the monitoring of open-pit limestone mines and the estimation of the amount of mining. Furthermore, it is expected that this method will be utilized for periodic monitoring of construction sites and road slopes as well as open-pit mines in the future.