• 제목/요약/키워드: million as a rail

검색결과 17건 처리시간 0.029초

The Preliminary Analysis of Introducing 500 km/h High-Speed Rail in Korea

  • Lee, Kwang-Sub;Eom, Jin Ki;Lee, Jun;Moon, Dae Seop
    • International Journal of Railway
    • /
    • 제6권1호
    • /
    • pp.26-31
    • /
    • 2013
  • Following the success of the KTX (Korea's first high-speed rail system) with a maximum operating speed of 300 km/h opened in 2004, experts in Korea started a research on the development of key technologies for high-speed rail (HSR) with a top speed of 500 km/h. This paper is a preliminary analysis of the research. It first reviews HSR experiences around the world, in terms of traffic and economic impacts of HSR, and presents a preliminary analysis of 500 km/h HSR in Korea. It is estimated that introduction of 500 km/h HSR with a 54% of travel time reduction will increase HSR passengers to about 9.8 million (about 78% of market share) between Seoul and Busan. It is a 23% of growth compared to the base scenario. Along with conventional rail passengers, air passengers are expected to be significantly impacted by the 500 km/h HSR. As a function of HSR travel time, the estimated market shares of both KTX and 500 km/h HSR compared to air are very comparable with previous international experiences. Based on the forecasted traffic, estimated total benefits are $758 million per year.

열차의 효율적 운영을 통한 동력비 절감방안에 관한 연구 - 서울메트로를 중심으로 - (Studies on Power Cost Reduction through Efficient Operation of Railway Vehicles Based on Seoul Metro)

  • 정일봉;박정수;김후규
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.792-800
    • /
    • 2007
  • The annual power cost for Seoul metro operations is about 65.5 billion won, of which rail motors account for 60% among total power consumptions. It is expected that the power consumption would increase because of global warming, future high electric equipments demands, etc. To reduce these consumptions, it is necessary to analyze the transportation demands of passengers, arrange the power-saving driving environments, respond flexible vehicles service, and improve how to drive vehicles. These method to reduce power consumption for rail motors can lead to improve the Seoul metro management. In this research, the improvement plan is derived by collecting and analyzing the data for total 33 power consumptions factors, screening top 10 factors by priority and impact, establishing each hypothesis to execute correlation and recursion analyses. As a result of 4 items research among top 10 affected factors, the power consumption for rail motors in 2006 is effectively reduced; the power usage is down with 13,870 kwh, from 531,539 kwh to 517,669 kwh, and the cost is down with 1,026 million won, from 39, 334 million won to 38,308 million won.

  • PDF

운행선에서 레일패드의 탄성변화율과 내구년수 예측 (Estimation of the Rail pad Stiffness Characteristic and the Sustainable period in Service)

  • 박대근;김정훈;최현수;강영종
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.432-441
    • /
    • 2007
  • Any track system needs major changes of its components during its life. The most economical solution is, if possible, to make all components reach their life limit during the major track rehabilitation operation. Usually, the rail does a role as the driving component for the objective: its life-time is equivalent to around 500 million tons of traffic on high speed lines. On the KTX line with 110 trains per day, this would correspond to around 16 years, which is probably too long for the elastic pads of a concrete slab track. The most economical solution should be to change them at an intermediate step of 8 years, without changing the rail, and then to change both the rail and elastic pad at 16 years intervals (some rail changes on the South East TGV line in France began 15 years after service opening at 260 km/h, but recent rails have better characteristics).

  • PDF

멀리온을 레일로 활용한 커튼월의 시공에 따른 경제성 평가 (Economic Evaluation according to Construction and Curtain Wall Mullion as a Rail)

  • 정의인;홍상훈;공희민;김봉주;염상수;강희태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2016
  • Today, many kind of buildings are higher than those of previous generations, and Curtain Wall is adapted broadly as an outer wall material. But weather and environmental condition could cause problems in curtain wall construction in most construction projects. High wind speed and unplanned lifting equipment's allocation could cause construction delay and cost increase. To solve these problems, we suggest using a curtain wall mullion as a rail to lift curtain wall which is less affected wind speed. And we would like to show a preliminary data of its economic advantage evaluation.

  • PDF

궤도형식별 사용레일의 피로수명 평가 (Fatigue Life Evaluation for Used Rail on Track Types)

  • 강성원;임형준;박용걸
    • 한국철도학회논문집
    • /
    • 제20권5호
    • /
    • pp.649-657
    • /
    • 2017
  • 본 연구의 목적은 궤도형식별로 사용레일의 피로수명을 평가하는 것이다. 이를 위해 궤도형식별 사용레일에 대한 실내피로시험을 수행하여 파괴확률 50%~0.01% 의 S-N 선도를 도출하고, 실험데이터에 대한 가중치 확률해석기법을 사용하여 피로수명을 산출하였다. 여기서, 레일표면요철 및 열차속도를 고려한 사용레일의 휨응력은 기존 연구결과 도출된 레일휨응력 예측식을 이용하여 구하고, S-N 선도로부터 사용레일의 잔존수명을 평가하였다. 평가결과, 자갈도상의 경우 레일의 피로수명이 현 레일교환기준에 비해 약 2억톤 이상 높았고, 콘크리트도상의 레일 피로수명이 자갈궤도에 비해 약 3억톤 이상 높은 것으로 나타났다. 따라서 누적통과톤수에 의한 레일교환기준을 자갈궤도와 콘크리트궤도로 구분할 필요가 있으며, 레일연마를 통한 레일관리가 이루어진다면 기준값이 아닌 목표값으로 관리할 필요가 있다.

수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구 (A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS))

  • 손영진;박근수;민경윤
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.755-770
    • /
    • 2006
  • 1974. 8.15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basic design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

  • PDF

대중교통카드기반 수도권 도시철도 통행수요배정모형 (Development of Dynamic Passenger-Trip Assignment Model of Urban Railway Using Seoul-Incheon-Gyeonggi's Transportation Card)

  • 손지언
    • 대한토목학회논문집
    • /
    • 제36권1호
    • /
    • pp.105-114
    • /
    • 2016
  • 수도권에는 1일 약 2000만 건의 대중교통카드 전수자료가 생성되고 있으며, 이 자료를 이용하여 시설운영 및 정책방안을 개선하고 도출하려는 시도가 다양해지고 있다. 본 연구는 교통카드에서 생성되는 동적인 수요변화의 예측 가능성을 모형화하는 시도로서 동적 통행수요배정모형을 구축하는 것이 목적이다. 버스의 경우 승객 이동상황이 카드태그(tag)를 통해 비교적 정확하게 파악되므로, 본 연구에서는 버스를 제외한 수도권 도시철도에 대해, 7개 운송기관이 운영하는 노선을 대상으로 적용되는 모형 및 알고리즘을 구축하였다. 구축된 모형은 교통카드자료의 Big Data 속성에 적합하게 연속 시간형 모형으로 구축되었으며, 승객의 경로선택행태를 효과적으로 나타내기 위하여 환승 횟수 증가에 따른 인지파라메타를 구성하였다. 수도권 도시철도 약 800만 쌍에 대하여 모델링한 결과, 연속형 시간기반 모형의 장점이 반영되어 어떤 시간 시점에서도 동적 수요를 분석할 수 있는 특성을 파악하였다. 특히 기존 철도운영기관의 목측조사자료와 비교한 혼잡도 변화를 파악할 때, 모형에서 도출된 혼잡도와 운영기관이 제시한 혼잡도 간에 유사한 추세를 보이고 있어 높은 신뢰도를 보여주고 있다. 본 연구는 철도기관에 한정한 모형으로 향후, 버스-도시철도와 통합된 모형체계 구축과 같은 연구가 필요할 것으로 파악된다.

수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구 (A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS))

  • 손영진;박근수;민경윤
    • 한국철도학회논문집
    • /
    • 제10권1호
    • /
    • pp.57-66
    • /
    • 2007
  • 1974. 8. 15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 2224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basie design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

서울메트로 승무.차량 운전장애에 대한 개선방안 (Obstacle of a train crew & Vehicle Operation For Improvement Program In Seoul metro)

  • 이태식;박민서;배우병;김동석;김준택
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1168-1173
    • /
    • 2007
  • The Seoul Subway is one of the most heavily used Subway System in the world. It provides reliable transportation services, conveys nearly 4 million Passengers across 117 subway stations with a length of 134.9 Km. Over the years the safety for the Subway has been a major concern, trains going off the track, equipment failure, careless operation, Signal failure are increasing day by day. In a Recent Public opinion 40% said the causes to above facts are Vehicle breakdown because of Operators, Old rail defect, Quality of material. 20% of the opinion said the obstacles were because of Operation, crew carelessness, negligence in signal operation. In case of any accident the crew members cannot resolve the issue on site (Aid insufficiency), because of lack of knowledge and carelessness. The main obstacles for Subway are vehicle breakdown, Electric equipment failure, Signal Equipment failure, and Crew carelessness. This paper aims to provide major problems which are needed to be solved as quickly as possible for citizen's safety for a comfortable subway system making a comfortable ride and providing better service gradually.

  • PDF

보수성을 개선한 복합형 신축이음장치(HRS) 내구성 평가 (Durability Evaluation of Hybrid Expansion Joint System with Improved Replacement)

  • 이정우
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제27권2호
    • /
    • pp.1-7
    • /
    • 2023
  • 기존 신축이음장치 교체 시간을 절감하고, 차선별 부분교체가 가능하도록 보수성을 개선한 신축이음장치 시스템(HRS)에 대하여 실물규모의 수직하중 피로시험과 윤하중 성능실험을 수행하여 내구성을 평가하였다. 수직하중 피로시험결과 레일형 신축이음장치의 최대응력은 170 Mpa이며, 이는 HRS 신축이음장치레일의 항복강도 355MPa의 약 47.8% 수준이다. 보수성을 개선한 HRS 신축이음장치의 수직하중 피로시험은 도로교설계기준에 따라 재하판의 크기와 하중을 설정하였고, 200만회 수직하중 피로시험과 윤하중 성능실험에 있어서 파괴거동을 나타내지 않았으며 그 내구성과 안전성을 확인하였다.