• Title/Summary/Keyword: million as a rail

Search Result 17, Processing Time 0.023 seconds

The Preliminary Analysis of Introducing 500 km/h High-Speed Rail in Korea

  • Lee, Kwang-Sub;Eom, Jin Ki;Lee, Jun;Moon, Dae Seop
    • International Journal of Railway
    • /
    • v.6 no.1
    • /
    • pp.26-31
    • /
    • 2013
  • Following the success of the KTX (Korea's first high-speed rail system) with a maximum operating speed of 300 km/h opened in 2004, experts in Korea started a research on the development of key technologies for high-speed rail (HSR) with a top speed of 500 km/h. This paper is a preliminary analysis of the research. It first reviews HSR experiences around the world, in terms of traffic and economic impacts of HSR, and presents a preliminary analysis of 500 km/h HSR in Korea. It is estimated that introduction of 500 km/h HSR with a 54% of travel time reduction will increase HSR passengers to about 9.8 million (about 78% of market share) between Seoul and Busan. It is a 23% of growth compared to the base scenario. Along with conventional rail passengers, air passengers are expected to be significantly impacted by the 500 km/h HSR. As a function of HSR travel time, the estimated market shares of both KTX and 500 km/h HSR compared to air are very comparable with previous international experiences. Based on the forecasted traffic, estimated total benefits are $758 million per year.

Studies on Power Cost Reduction through Efficient Operation of Railway Vehicles Based on Seoul Metro (열차의 효율적 운영을 통한 동력비 절감방안에 관한 연구 - 서울메트로를 중심으로 -)

  • Chung, Il-Bong;Park, Jeong-Soo;Kim, Hoo-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.792-800
    • /
    • 2007
  • The annual power cost for Seoul metro operations is about 65.5 billion won, of which rail motors account for 60% among total power consumptions. It is expected that the power consumption would increase because of global warming, future high electric equipments demands, etc. To reduce these consumptions, it is necessary to analyze the transportation demands of passengers, arrange the power-saving driving environments, respond flexible vehicles service, and improve how to drive vehicles. These method to reduce power consumption for rail motors can lead to improve the Seoul metro management. In this research, the improvement plan is derived by collecting and analyzing the data for total 33 power consumptions factors, screening top 10 factors by priority and impact, establishing each hypothesis to execute correlation and recursion analyses. As a result of 4 items research among top 10 affected factors, the power consumption for rail motors in 2006 is effectively reduced; the power usage is down with 13,870 kwh, from 531,539 kwh to 517,669 kwh, and the cost is down with 1,026 million won, from 39, 334 million won to 38,308 million won.

  • PDF

Estimation of the Rail pad Stiffness Characteristic and the Sustainable period in Service (운행선에서 레일패드의 탄성변화율과 내구년수 예측)

  • Park, Dae-Geun;Kim, Jung-Hun;Choi, Hyun-Su;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.432-441
    • /
    • 2007
  • Any track system needs major changes of its components during its life. The most economical solution is, if possible, to make all components reach their life limit during the major track rehabilitation operation. Usually, the rail does a role as the driving component for the objective: its life-time is equivalent to around 500 million tons of traffic on high speed lines. On the KTX line with 110 trains per day, this would correspond to around 16 years, which is probably too long for the elastic pads of a concrete slab track. The most economical solution should be to change them at an intermediate step of 8 years, without changing the rail, and then to change both the rail and elastic pad at 16 years intervals (some rail changes on the South East TGV line in France began 15 years after service opening at 260 km/h, but recent rails have better characteristics).

  • PDF

Economic Evaluation according to Construction and Curtain Wall Mullion as a Rail (멀리온을 레일로 활용한 커튼월의 시공에 따른 경제성 평가)

  • Jung, Ui-In;Hong, Sang-Hun;Kong, Hee-Min;Kim, Bong-Joo;Yeom, Sang-Su;Kang, Hui-Tae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.17-18
    • /
    • 2016
  • Today, many kind of buildings are higher than those of previous generations, and Curtain Wall is adapted broadly as an outer wall material. But weather and environmental condition could cause problems in curtain wall construction in most construction projects. High wind speed and unplanned lifting equipment's allocation could cause construction delay and cost increase. To solve these problems, we suggest using a curtain wall mullion as a rail to lift curtain wall which is less affected wind speed. And we would like to show a preliminary data of its economic advantage evaluation.

  • PDF

Fatigue Life Evaluation for Used Rail on Track Types (궤도형식별 사용레일의 피로수명 평가)

  • Kang, Sung Won;Lim, Hyung-Jun;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.5
    • /
    • pp.649-657
    • /
    • 2017
  • In this study, fatigue testing was carried out for long-term use of rail according to track type. From S-N curves for 50%~0.01% failure probability, the fatigue life of the long-term use rail for each track type was derived using the weight probability analysis technique on the experimental data. Because the rails used in the fatigue test have different cumulative tonnages, the number of repetitions was modified by averaging the cumulative tonnage. In addition, the bending stresses of rail bottoms, considering rail surface irregularities, track support stiffnesses and train speeds, were evaluated using the predicted rail bending stresses derived from existing studies. As a result, for rail fatigue life evaluation, the fatigue life of rail on the ballast track was found to be more than 200 million tons higher than the standard value for rail replacement. Also, the fatigue life of rail on concrete track is more than 300 million tons higher than that on ballast track. The Haibach rule is adaptable for the fatigue life evaluation of rail for stress range under fatigue limit.

A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS) (수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구)

  • Son, Yeong-Jin;Park, Keun-Soo;Min, Kyung-Yun
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.755-770
    • /
    • 2006
  • 1974. 8.15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basic design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

  • PDF

Development of Dynamic Passenger-Trip Assignment Model of Urban Railway Using Seoul-Incheon-Gyeonggi's Transportation Card (대중교통카드기반 수도권 도시철도 통행수요배정모형)

  • Sohn, Jhieon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.1
    • /
    • pp.105-114
    • /
    • 2016
  • With approximately 20 million transportation card data entries of the metropolitan districts being generated per day, application of the data to management and policy interventions is becoming an issue of interest. The research herein attempts a model of the possibility of dynamic demand change predictions and its purpose is thereby to construct a Dynamic Passengers Trip Assignment Model. The model and algorithm created are targeted at city rail lines operated by seven different transport facilities with the exclusion of travel by bus, as passenger movements by this mode can be minutely disaggregated through card tagging. The model created has been constructed in continuous time as is fitting to the big data characteristic of transport card data, while passenger path choice behavior is effectively represented using a perception parameter as a function of increasing number of transfers. Running the model on 800 pairs of metropolitan city rail data has proven its capability in determining dynamic demand at any moment in time, in line with the typical advantages expected of a continuous time-based model. Comparison against data measured by the eye of existing rail operating facilities to assess changes in congestion intensity shows that the model closely approximates the values and trends of the existing data with high levels of confidence. Future research efforts should be directed toward continued examination into construction of an integrated bus-city rail system model.

A Study of Successful Factor on PSD Application Technique for Manual Operation Mode(ATS) (수동운전(ATS)구간에서 PSD 적용 기술의 성공적 요인 분석연구)

  • Son, Yeong-Jin;Park, Keun-Soo;Min, Kyung-Yun
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.1 s.38
    • /
    • pp.57-66
    • /
    • 2007
  • 1974. 8. 15 SeoulMetro, beginning with the first electric railway established at six cities, so it is managing mass transportation of traffic. Especially, in case of seoul, It is managing that from one to eight lines, 286.9km, 265 stations have installed and now it is carrying about 5.5million of passengers everyday, and 2,000million passengers a year. So accident is increasing from the station every year. For this measure, SeoulMetro prepares safety fence for passengers crash but, as suicides or people who watch the accident took place, for at the bottom of passengers crash protection, PSD installing is needed. Even though, PSD is managing ATO section but, in controlling SeoulMetro, one to four lines sections are (ATS, ATC)section. Between as ATS, ATC section, ATO section, subway gate and PSD must have opened and crossed always at the time. And the interlock control corrosion protection gate, managing skills with installation, method, using in history, apply to 10rail cars one train sets, and maximum applying 2224% sections of passengers congested that consideration is to be needed. So 2004, SeoulMetro improved technology and basie design of PSD at ATS section. Based on this, from 2005.4 to 2006.6, using subway 2lines per 12stations set the model installation(full type 11stations, half type 1station) After installing in case of success, it is going about to suggest that effective analysis and hereafter subject.

Obstacle of a train crew & Vehicle Operation For Improvement Program In Seoul metro (서울메트로 승무.차량 운전장애에 대한 개선방안)

  • Lee, Tai-Sik;Park, Min-Seo;Bae, Woo-Byeng;Kim, Dong-Seok;Kim, Jun-Taek
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1168-1173
    • /
    • 2007
  • The Seoul Subway is one of the most heavily used Subway System in the world. It provides reliable transportation services, conveys nearly 4 million Passengers across 117 subway stations with a length of 134.9 Km. Over the years the safety for the Subway has been a major concern, trains going off the track, equipment failure, careless operation, Signal failure are increasing day by day. In a Recent Public opinion 40% said the causes to above facts are Vehicle breakdown because of Operators, Old rail defect, Quality of material. 20% of the opinion said the obstacles were because of Operation, crew carelessness, negligence in signal operation. In case of any accident the crew members cannot resolve the issue on site (Aid insufficiency), because of lack of knowledge and carelessness. The main obstacles for Subway are vehicle breakdown, Electric equipment failure, Signal Equipment failure, and Crew carelessness. This paper aims to provide major problems which are needed to be solved as quickly as possible for citizen's safety for a comfortable subway system making a comfortable ride and providing better service gradually.

  • PDF

Durability Evaluation of Hybrid Expansion Joint System with Improved Replacement (보수성을 개선한 복합형 신축이음장치(HRS) 내구성 평가)

  • Jung Woo Lee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.2
    • /
    • pp.1-7
    • /
    • 2023
  • Durability was evaluated by performing a full-scale vertical load fatigue test and a wheel load performance test on the HRS, which reduces the replacement time of the existing expansion joint and improves serviceability to allow partial replacement by lane. As a result of the vertical load fatigue test, the maximum stress of the rail-type expansion joint is 170 MPa, which is about 47.8% of the yield strength of the HRS expansion joint rail 355 MPa. The vertical load fatigue test of the HRS expansion joint with improved serviceability set the size and load of the load plate according to the road bridge design standards, did not show any fracture behavior in the vertical load fatigue test and the wheel load performance test 2 million times, and its durability and safety were verified.